Suppls 950113 License Change Request 94-08,revising TS to Support Mod P00068-3,which Upgrades Major Components of Traversing in-core Probe Sys,Per NRC Request.Most Current Unit 3 marked-up TS Pages Encl
ML20081F094
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/14/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20081F101 List:
References
NUDOCS 9503210528
Download: ML20081F094 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -. _ _ _ _ _ _ _ _ _. - _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _. - _.. _ _. _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _

Ctation support Department 10 CFR 50.90 -

i l

PECO ENERGY Cf,a C "L, l

965 Chesterbrook Boulevard Wayne, PA 19087-5G91 March 14,1995 Docket Nos. 50-277 50-278 License Nos. DPR q DPR-56 j

i U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Chae;;a Request 94-08, Supplement 1

REFERENCE:

Letter from G. A. Manger, Jr., (PECO Energy) to NRC dated January 13,1995.

Dear Sir:

The referenced letter transmitted PECO Energy Company's License Change Request (LCR) 94 08 requesting changes to Appendix A of the Peach Bottom Atomic Power Station (PBAPS)

Facility Operating Licenses.

The proposed changes were requested to support PBAPS Modification P00068-3, which i

upgrades the major components of the Traversing in-core Probe (TIP) System.

This letter supplements our earlier submittal by providing additional informatioa which was requested by the NRC. Additionally, we have included as Attachment 1, the most current Unit 3 marked-up Technical Specifications pages.

If you have any questions concerning this submittal, please contact us.

I Sincerely, i

h. 0 Y-4~a.1 fY'~

1 G. A. Hunger, Jr.,

Director Licensing

Enclosures:

Affidavit, Attachment 4

cc:

T. T. Martin, Administrator, Region I, USNRC W. L Schmidt, Senior Resident insWor, PBAPS, USNRC R. R. Janati, Commonwealth of Pennsylvania 9503210528 950314 PDR. 'ADDCK 05000277 P

PDR I

C MMONWEALTH OF PENNSYLVANIA

. SS.

COUNTY OF CHESTER D. M. Smith, being first duly sworn, deposes and says:

' That he is Senior Vice President and Chief Nuclear Officer of PECO Energy Company; the applicant herein; that he has read the attached License Change Request (LCR 9448, Supplement 1) for changes to the Peach Bottom FacNity Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

/

Senior Vice President and Chief Nuclear Officer Subscribed and sworn to

}$.(L before me this day

_ of g

1995.

i i!

k./g s

'~

~

Nota'ry Public 5

l NotanalSeal

' Erica A Santn Notary Psic TredyennTve,Chester County MyConuwssion ExpresJuly 10,1995 l

l

EECO Enerov Resoonse to NRC Raouest for Additional information By telephone call, the NRC requested additional information regarding Modification P00068-3 Specifically, the NRC requested information regarding PECO Energy's plan for conducting post modification and future testing of the spare containment penetrations resulting from Modification P0006834.

As a result of the modification, containment penetrations N-35B and N 35D will no longer be required for TlP system operation. The TIP tubing which passes through these penetrations will be cut on both sides of the drywell penetration. Both sides of the tubing will then be fitted with a flare union and capped with a Swagelock cap.

As part of the Modification P00068-3 acceptance test, the capped tubing in containment penetrations N.

35B and N45D wBI be pressure tested with air or nitrogen at 75 5 psig. The test will be deemed acceptable when no leakage, (as determined by the capped area being ' bubble free' by using leak detection fluid for > 1 minute) is observed. The 75 5 psig test pressure is based on 125% of drywell rated pressure of 56 psig plus a 5 psig tolerance.

There are no other tests planned for these penetrations.

]