Cntergy Cperttiont,Inc.
ENTERGY eo sox 7ss Port Gtson. MS 39150 Tei 601437 2800 C. R. Hutchinson vce Roknt Oreawa cuand csf Hrhv s:aw March 17, 1995 U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Docket No. 50-416 License No NPF-29 Simulator Certification Update in Accordance with 10CFR55.45 GNRO-95/00029 Gentlemen:
This submittal contains an update to our original certification of the Grand Gulf Nuclear Station simulation facility in accordance with the requirements of 10CFR55.45 (b) (5). This report contains a description of the previous four years of performance tests, any uncorrected performance test failures with a schedule for correcting any such failures, a schedule for the next four years of planned perfonnance tests, and a description of other testing performed following simulator modifications.
In accordance with the requirements of 10CFR55.45 (b) (5), Entergy Operations will submit a similar report approximately four years frcan this date.
Please contact Brian Blanche at 601-437-6475 should you have questions or need any additional information.
Yours truly,
/ /
,y yr CRH/RSJ/amb attachment:
Simulator Certification Update in Accordance with 10CFR55.45 cc:
(See Next Page) 2100SJ 9503210116 950317 1
PDR ADOCK 05000416 P
~
i
}
l
-1
+
.; q.
- March 17, 1995 ONRO-95/00029 Page'2 of 3 e
cc:
Mr. J. E. Tedrow-(w/a)
Mr. H. W. Keiser (w/a)
Mr. R. B. McGehee (w/a).
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/a)
S Mr. Stewart D..Ebneter '(w/2)
RegioLal Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St.,
N.W.,
Suite 2900, Atlanta', Georgia 30323' Mr.
P.
W. O'Connor, Project Manager (w/a)
Office of Nuclear Reactor Regulation-U.S. Nuclear Regulatory Commission Mail Stop 13H3 l
Washington, D.C.
20555 I
1 l
l i
1 I
9 G9503151 1
~
'l Grand Gulf Nuclear Station Simulator Certification Undate in Accordance with 10CFR55.45-A.
Summary of Major Changes Since Last Submittal-
]
1.
General a.
The Grand Gulf simulator was upgraded by General Physics
-International over the.1991 - 1994 time period. Training commenced with the new models in March 1994.
b.
The tollowing simulator back panels were added by.this upgrade:
1H13-P610 - Control Rod Test Instrument Panel Note: Only the RPS power supply and transfer portion of this panel are functional) 1H13-P845 - Offgas Panel 1H13-P631 - Division 2 ADS Panel c,
The following major models were replaced:
i Core Thermohydraulics and Neutronics Model.
Reactor Recirculation System Main Steam Turbine s
Condenser Condensate System Feedwater System Containment and Drywell d.
An offgas system model was added.
e.
Radiation transport was added to all major models.
f.
An advanced instructor station was added. The instructor booth was modified to visually isolate and sound proof the booth from the simulated control room.
g.
The telephone system was replaced.
B.
Future changes 1.
General a.
Simulation of the plant BOP computer is in process of being upgraded in accordaace with the Plant Data System upgrade being implemented in the plant control room.
C.
Description of the Previous Four Years of Performance Testing 1.
The transient tests, malfunction tests, steady state tests and computer real time test were all completed as stated in the March 1991 submittal with no failures.
I to GNRO-95/00029 Page 1 of 3
mc q.
Grand Gulf Nuclear Station
_ Simulator Certification Update in Accordance with 10CFR55.45 D.
Uncorrected Performance Test Failures and Schedule for Correction 1.
Documented simulator discrepancies are corrected based upon training impact. -Currently there are no test discrepancies which seriously impact licensed operator training.
'E.
' Schedule for the Next Four Years of Performance Tests 1.
All transient tests, steady state tests and the computer real:
time test will be performed annually.
2.
Approximately one-fourth of the malfunction tests will be performed each year as follows:
a.
1995 - Malfunctions in the following systems:
Reactor Recirculation system Control Rod Drive-(CRD Hydraulic and RC&IS)
Standby Liquid Control System Neutron Monitoring System Vessel Instrumentation Reactor Water Cleanup b.
1996 - Malfunctions in the following systems:
Reactor Protection System Reactor Core Isolation Cooling (RCIC)-
Residual Heat Removal System Low Pressure Core Spray High Pressure Core Spray Leak Detection Main Steam System and Safety Relief Valves c.
1997 - Malfunctions in the following systems:
Condensate and Feedwater systems Radiation Monitoring Turbine and Turbine Control Turbine Lube Oil Generator and Generator Auxiliaries Circulating Water system d.
1998 - Malfunctions in the following systems:
Heating Ventilation and Cooling systems Offgas system Electrical Distribution System (AC and DC)
Annunciator System Standby Service Water Plant Service Water Turbine Building Cooling Water Component Cooling Water Instrument Air to GNRO-95/00029 Page 2 of 3
=
- .
- a Grand Gulf' Nuclear Station Simulator Certification-Undate in Accordance with 10CFR55 di F.
Other testing performed following simulator modifications and deficiency resolutions 1.
Malfunctions and other' simulator features are added, modified, or deleted as determined by training needs, industry events, or the plant design change process. Retests which may include portions of the affected tests may include several tests depending on the problem resolution.
b L
)
1 to GNRO-95/00029 Page 3 of 3
,