ML20081E015
| ML20081E015 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/17/1995 |
| From: | Burski R ENTERGY OPERATIONS, INC. |
| To: | Russell W Office of Nuclear Reactor Regulation |
| References | |
| W3F1-95-0041, W3F1-95-41, NUDOCS 9503210109 | |
| Download: ML20081E015 (32) | |
Text
r 7
c
- . c
= ENTERGY Yo"a'e """ " '"
' KWona. LA 70066 Tel 504 739 6774 R. F. Burski -
I Duector.
EkCICar 6df0'y Vfderforc 3 W3F1-95-0041 A4.05
.PR March 17, 1995 U.S. Nuclear Regulatory Commission ATTN: Mr. W.T. Russell, Director Office of Nuclear Reactor Regulation Washington, D.C. 20555-0001
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 10 CFR 55.45(b)(5)(ii)
Four Year Report On Anniversary of Simulator Certification
Dear Mr. Russell:
In accordance with the requirements of 10 CFR 55.45(b)(5)(ii) and 10 CFR 55.45(b)(5)(vi), Waterford 3 is hereby submitting a Four Year Report on the anniversary of our Simulator Certification.
The Simulator original certification submittal (W3F1-91-0040) was dated March 20, 1991.
The report is required to identify any uncorrected performance test failures, and include a schedule for correction of such performance test failures, if any.
Currently, there are no uncorrected performance test failures to report.
Attached are additional items required by 10 CFR 55.45(b)(5)(vi)., Part I contains a description of the Simulator Performance Test program as run over the past 4 years. Attachment 1, Part 2 contains a description of the current Simulator Performance Test Program.
Attachment 2 contains descriptions of the changes made to the Simulator Performance Test Plan.
The changes made to the plan were minor. Attachment 3 is the completed NRC Form 474.
I 9503210109 950317 PDR ADOCK 05000382 P
PDR I
,m-.--
- -',7
~?J 10 CFR'55.45(b)(5)(ii)
Four Year: Report On Anniversary of Simulator Certification W3F1-95-0041 Page 2 March 17, 1995 If th'ere are any questions regarding the subject report, please contact.
0.P. Pipkins at (504) 739-6707.
E Very truly yours, b
k~(X4cAk OT 9
R.F. Burski Director Nuclear Safety RFB/0PP/ssf Attachments (w/o Attachments) cc:
L.J. Callan, NRC Region IV C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds NRC Resident Inspectors Office a
9
(
I 1
ATTACFfiENT 1 PART 1 1
DESCRIPTION OF COMPLETED PERFORMANCE TESTS l
i j
m Of PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PACE:
5 0F 16 NTI-509 ATTACHMENT 7.1 FIRST YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
_ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D' REF.
USED' NTI-602.01' NORMAL OPERATION TEST YES A3.2 NTI-603.01 45% ACCURACY TEST YES B2.1 NTI-603.02 80% ACCURACY TEST YES.
B2.1 NTI-603.03 100% ACCURACY TEST YES B2.1 NTI-603.04 100% STABILITY TEST YES B2.1 NTI 604.01 MANUAL REACTOR TRIP YES B2.2(1)
NTI-604.02 SIM. TRIP OF ALL FDW PUMPS YES B2.2(2)
NTI-604.03 SIM. CIASURE OF ALL MSIVs YES B2.2(3).
NTI-604.04 SIM. TRIP OF ALL RCPs YES B2.2(4)
NTI-604.05 TRIP ANY RCP YES B2.2(5)
NTI-604.06 MAIN TURBINE TRIP YES B2.2(6)
NTI-604.07 MAX RATE POWER RAMP YES B2.2(7)
NTI-604.08 MAX IDCA WITH IAP YES B2.2(8)
NTI-604.09 MAX UNISOLABLE MS LEAK YES B2.2(9)
NTI-604.10 SLOW RCS DEPRESS W/NO HPSI YES B2.2(10)
NTI-610.01 CCW PUMP (S) TRIP YES 3.1.2(8)
CC01 NIT-610.06 RCP SEAL CLR OTLT VLV FAILS YES 3.1.2(8)
CC06 NIT-610.10 LOSS OF CCW TO SDC HX YES 3.1.2(7)
CC10 NIT-610.17 RUPTURE OF CCW PMP DISC PIPE YES 3.1.2(8)
CC17 NTI-612.01 REACTOR FUEL CIADDING FAILS YES 3.1.2(14)
CR01 NTI-614.01 CHARGING PUMP TRIP YES 3.1.2(18)
CV01 NIT-614.06 LTDN HX TCV FAILS SHUT YES 3.1.2(18)
CV06
\\PRCDR\\NTI\\NTI509Pl. DOC
PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PAGE:
6 OF 16 NTI-509 ATTACHMENT 7.1 FIRST YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED FII-615.01 CW PUMP TRIP YES 3.1.2(5)
CW01 NTI-616.01 FDR BRKR TRIP IN SWITCHYARD YES 3.1.2(3)
ED01 NIT-616.06 LOSS OF 480VAC BUS (ES)
YES 3.1.2(3)
ED06 NTI-617.03 MAIN CEN MAD RFJECTION YES 3.1.2(16)
EG03 NIT-617.08 FAILURE OF DC TO AUT0 START YES 3.1.2(3)
EG08 NIT-617.18 H2 SEAL OIL PMP TRIP (H2)
YES 3.1.2(22)
EC18 NTI-619.01 CONDENSATE PUMP TRIP YES 3.1.2(9)
WO1 NIT-619.08 LOSS OF AUX FDW PUMP YES 3.1.2(9)
WO8 f
NIT 619.19 FDW HTR BYPASS VLV FAIMRE YES 3.1.2(9)
W19 NIT-619.30 EMER FDW PMP SUCT HDR LEAK YES 3.1.2(9)
W30 NTI-621.01 SA/IA CROSSOVER VLV FAILS YES 3.1.2(2)
IA01 NTI-622.04 STEAM BYPASS VLV LEAKAGE YES 3.1.2(17)
MSO4 NTI-622.11 MS LINE BREAK INSIDE CNTMT YES 3.1.2(20)
MS11 NTI-623.01 SAFETY INSTRMNT CH FAILURE YEC 3.1.2(21)
NIO1 NTI-625.01 CPC CHANNEL (S) FAIL YES 3.1.2(11)
PW01 NTI-626.01 MSS OF ALL RCPS YES 3.1.2(4)
RC01 NTI-626.08 RCP MWER SEAL FAILURE YES 3.1.2(4)
RC08 NTI-626.14 PZR SPRAY VALVE FAILURE YES 3.1.2(18)
RC14 NTI-626.18 RCS COLD LEG CNTRL TT FAILS YES 3.1.2(22)
RC18 NTI-626.22 PZR CPC SFTY PT FAILS HI/ M YES 3.1.2(22)
RC22
(
NTI-626 27 PZR INSTRMNT LINE BREAK YES 3.1.2(1)
RC27
\\PRCDR\\NTI\\NTISO9Pl. DOC
PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PAGE:
7 0F 16 NTI-509 ATTACHMENT 7.1 FIRST YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-62*.01 CEDM MG SET FAILURE YES 3.1.2(12)
RD01 NTI-627.05 ROD EJECTION YES 3.1.2(12)
RDOS NTI-627.14 FAILURE OF CNTRL/SD BANKS TO YES 3.1.2(12)
RD14 TRIP NTI-629.02 RPS AUTO TRIP FAILURE YES 3.1.2(24)
RP02 NTI-629.06 RPS MATRIX REIAY FAILURE YES 3.1.2(17)
RP06 UTI-630.01 SBC QUICK OPEN SIG FAILS YES 3.1.2(17)
RX01 NTI-630.08 PZR IEVEL CNTR1R FAIL.S OFF YES 3.1.2(18)
RXO8 NTI-630.14 PZR PRESS CNTRL 100X/Y FAILS YES 3.1.2(18)
RX14
(
NTI-631.01 S/G TUBE LEAK YES 3.1.2(1)
SG01 NTI-632.01 SI PUMP TRIP YES 3.1.2(22)
SIO1 NTI-634.01 TCCW PUMP TRIP YES 3.1.2(6)
TP01 1
\\PRCDR\\NTI\\NTI509Pl. DOC i
PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PACE:
10 0F 16 NTI-509 ATTACHMENT 7.2 SECOND YEAR RETEST LIST PFRFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-626.23 RCS COLD LEC PIPE RUPTURE YES 3.1.2(1)
RC2.s NTI-627.02 DROPPED CEA YES 3.1.2(12)
RD02 NTI-627.06 CEA CRP UNCNTRLD INSERTION YES 3.1.2(12)
RD06 NTI-627.11 CEAS MECHANICALLY STUCK YES 3.1.2(12)
RD11 NTI-627.21 CEA UPR ELEC LIMIT FAILURE YES 3.1.2(12)
RD21 i
NTI 629.03 RX TRIP WITH NO AUTO TURBINE YES 3.1.2(19)
RP03 TRIP
..., d'
....u,,.
m.,
m.,
NTI-630.04 MFV FIDW CNTRL VLV FAILURE YES 3.1.2(9)
RX04 NTI-630.09 S/G LEVEL CNTRL FAILURE YES 3.1.2(22)
RXO9 NTI-631.04 MS LINE PRESS XMTR FAILS YES 3.1.2(22)
SC04 NTI-632.04 AIR BINDING IN SI SYSTEM YES 3.1.2(7)
SIO4 NTI-633.01 TURBINE IDAD CNTRL DMD FAILS YES 3.1.2(17)
TC01 NTI-634.04 TCCW HX A OUTLET HDR LEAK YES 3.1.2(6)
TPO4 1
\\PRCDR\\NTI\\NTI509Pl. DOC i
f, :
PERFORMANCE TEST NO:
NTI 509 PROCEDURE REV:
1 PACE:
9 0F 16 NTI-509 ATTACHMENT 7.2 SECOND YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NIT-614.14 CVCS LTDN LEAK IN CNTNT YES 3.1.2(1)
CV14 NIT-616.02 IDSS OF MAJOR STATION XWR YES 3.1.2(3)
ED02 NIT-616.07 IDSS OF 125VDC BUS (ES)
YES 3.1.2(3)
ED07 NIT-617.04 MAIN GEN OUTPUT BKR FAILS TO YES 3.1.2(22)
EG04 OPEN ON AUTOTRIP NIT-617.09 FAILURE OF DG TO IDAD YES 3.1.2(3)
EG09 NIT-617.19 H2 SEAL OIL PMP TRIP (AIR)
YES 3,1.2(22)
EG19 NIT-619.03 FEEDWATER PUMP OVERSPD TRIP YES 3.1.2(9)
FWO3 NIT-619.10 CONDENSER VACUUM PUMP TRIP YES 3.1.2(5)
W10 NIT-619.20 SU FDW REG VLV FAILURE YES 3.1.2(9)
W20 NIT-619.36 FDW PIPE BREAK OUTSIDE CNTMT YES 3.1.2(20)
W36 NTI-621.02 IA ISOL VLV FAILS TO YES 3.1.2(2)
IA02 CIDSE ON CIAS NTI-621.05 IA CMPRSR DISCH LINE RUPTURE YES 3.1.2(2)
IA05 NTI-622.05 ATMOS STM DUMP VLV FAILS YES 3.1.2(17)
MS05 NTI-622.12 MS LINE BREAY, OUTSIDE CNTMT YES 3.1.2(20)
MS12 AFIER MSIV NTI-623.03 CNTRL CH INSTRMNT FAILURE YES 3.1.2(21)
NIO3 NTI-625.02 RX PWR CB FAILS TO DROP CEAS YES 3.1.2(11)
FWO2 NTI-626.03 RCP SHAFI SEIZURE YES 3.1.2(4)
RC03 NTI-626.09 RCP MIDDLE SEAL FAILURE YEG 3.1.2(4)
RC09 NTI-626.15 PZR CNTRL LT FAILS HI/LO YES 3.1.2(18)
RC15 NTI-626.19 RCS COLD LEC SFTY TT FAILS YES 3.1.2(22)
RC19
\\PRCDR\\NTI\\NTI509Pl. DOC
PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PAGE:
10 OP 16 NTI-509 ATTACHMENT 7.2 SECOND YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-626.23 RCS COLD LEG PIPE RUPTURE YES 3.1.2(1)
RC23 NTI-627.02 DROPPED CEA YES 3.1.2(12)
RD02 NTI-627.06 CEA GRP UNCNTRLD INSERTION YES 3.1.2(12)
RD06 NTI-627.11 CEAS MECHANICALLY STUCK YES 3.1.2(12)
RD11 NTI-627.21 CEA UPR ELEC LIMIT FAILURE YES 3.1.2(12)
RD21 NTI-629.03 RX TRIP WITH NO AUTO TURBINE YES 3.1.2(19)
RP03 TRIP NTI-629.07 RPS BISTABLE RELAY FAILURE YES 3.1.2(17)
RP07 NTI-630.04 MFV FIDW CNTRL VLV FAILUR" YES 3.1.2(9)
RX04 NTI-630.09 S/G LEVEL CNTRL FAILURE YES
.l.1.2(22)
RX09 NTI-631.04 MS LINE PRESS XMTR FAILS YES 3.1.2(22)
SG04 NTI-632.04 AIR BINDING IN SI SYSTEM YES 3.1.2(7)
SIO4 NTI-633.01 TURBINE LOAD CNTRL DMD FAILS YES 3.1.2(17)
TC01 NTI-634.04 TCCW HX A OUTLET HDR LEAK YES 3.1.2(6)
TPO4
\\PRCDR\\NTI\\NTI509Pl. DOC e
f
-+-
PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PAGE:
11 0F 16 NTI-509 ATTACHMENT 7.3 THIRD YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS 3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-602.01 NORMAL OPERATION TEST YES A3.2 NTI-603.01-45% ACCURACY TEST YES
.B2.1 NTI-603.02-80% ACCURACY TEST YES B2.1 NTI-603.03 100% ACCURACY TEST YES B2.1 NTI-603.04 100% STABILITY TEST YES B2.1 NTI-604.01 MANUAL REACTOR TRIP YES B2.2(1)
NTI-604.02 SIM. TRIP OF ALL FDW PUMPS YES B2.2(2)
NTI-604.03 SIM. CLOSURE OF ALL MSIVs YES B2.2(3) f NTI-604.04 SIM. TRIP OF ALL RCPs YES B2.2(4)
NTI-604.05 TRIP ANY RCP YES B2.2(5)
NTI-604.06 MAIN TURBINE TRIP YES B2.2(6)
NTI-604.07 MAX RATE POWER RAMP YES B2.2(7)
NTI-604.08 MAX LOCA WITH LOP YES B2.2(8)
NTI-604.09 MAX UNIS01ABLE MS LEAK YES B2.2(9)
NTI-604.10 S WW RCS DEPRESS W/NO HPSI YES B2.2(10)
NIT-610.03 CCW PUMP BEARING SEIZURE YES 3.1.2(8)
CC03 NIT-610.08 IDSS OF COOLING WTR TO DG YES 3.1.2(8)
CC08 NIT-610.15 14SS OF CCW TO LPSI PMP CIAS YES 3.1.2(8)
CC15 NIT-610.19 AUX CCW PMP DISC HDR RUPTURE YES 3.1.2(8)
CC19 NIT-614.03 CMRC PUMP SEAL LUBE PUMP YES 3.1.2(18)
CV03 MOTOR FAILS
(-
NIT-614.15 CVCS LTDN LEAK OUTSIDE CNTNT YES 3.1.2(1)
CV15
\\PRCDR\\NTI\\NTI5O9Pl. DOC
PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PAGE:
12 0F 16 NTI-509 ATTACHMENT 7.3-THIRD YEAR RETEST LIST PERFORMANCE-PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NIT-616.04 LOSS OF 6.9KV BUS (ES)
YES 3.1.2(3)
ED04 NIT-616.10 IASS OF 208/120V BUS (ES)
YES 3.1.2(3)
ED10 NIT 617.05 EXCIT.BKR FAILS TO AUTOTRIP YES 3.1.2(22)
EGOS NIT-617.10 DG OVERSPEED TRIP YES 3.1.2(3)
EG10 NIT-617.20 STATOR C001 ANT HIGH COND.
YES 3.1.2(15)
EG20 NIT-619.04 FDW PMP TURB SPD CNTRL FAIL YES 3.1.2(9)
WO4 NIT-619.12 FDW PUMP TURBINE HIGH VIB YES 3.1.2(9)
W1?
NIT-619.21 CONDENSER AIR IN LEAKAGE YES 3.1.2(5)
W21 f-NIT-619.37 FDW PIPE BREAK OUTSIDE CNTMT YES 3.1.2(20)
W37 NTI-621.03 RUPTURE AIR SUPPLY TO STEAM YES 3.1.2(2)
IA03 BYPASS VALVES NTI-622.09 S/G STM FLOW XMTR FAILURE YES 3.1.2(22)
MS09 NTI-622.13 MS LINE BREAK OUTSIDE CNTMT YES 3.1.2(20)
MS13 BEFORE MSIV NTI-622.22 TURBINE IST STAGE PRESSURE YES 3.1.2(22)
MS22 XMTR FAILS NTI-623.05 SU INSTRUMENT CH FAILURE YES 3.1.2(21)
NIO5 NTI-625.03 RX PWR CB FAILS TO SB/RB YES 3.1.,2(11)
PWO3 NTI-626.04 RCP SHEARED SHAFT YES 3.1.2(4)
RC04 NTI-626.11 CODE SAFETY FAILURE OPN/CLSD YES 3.1.2(1)
RC11 NTI-626.16 RCP SPEED XMTR FAILS YES 3.1.2(22)
RC16 NTI-626.20 RCS HOT LEG SFTY TI FAILS YES 3.1.2(22)
RC20 NTI-626.24 RCS HOT LEG PIPE RUPTURE YES 3.1.2(1)
RC24
(
\\PRCDR\\NTI\\NTI5O9Pl. DOC
PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PAGE:
13 0F 16 NTI-509 ATTACHMENT 7.3 THIRD YEAR RETEST LIST.
PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-627.03 CEAS FAIL TO MOVE IN MAN GP YES 3.1.2(13)
RD03 NTI-627.12 CEA UNCNTRLD WITHDRAWAL YES 3.1.2(12)
RD12 NTI-627.24 RX TRIP BRKR FAILS TO OPEN YES 3.1.2(24)
RD24 NTI-629.04 ESFAS TRIP GENERATED YES 3.1.2(23)
RPO4 NTI-630.05 S/G LEVEL SETPOINT DRIFT YES 3.1.2(22)
RX05 NTI-630.10 PZR BU HTRS FAIL YES 3.1.2(18)
RX10 NTI-631.05 S/G LEVEL XMTR FAILURE YES 3.1.2(22)
SG05 NTI-632.08 LPSI PUMP SUCT LINE RUPTURE YES 3.1.2(7)
SIO8 NTI-634.05 LOSS OF WTR TO HW COOLERS YES 3.1.2(6)
TP05 l
l t
\\PRCDR\\NTI\\NTI509Pl. DOC
^
~
j
- PERFORKA 2CE TEST NO:
NTI-509 PROCEDURE REV:
1
' PACE:
14 0F 16 NTI-509 ATTACHMENT 7.4 FOURTH YEAR RETEST LIST PERFORMANCE' PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-602.01-NORMAL OPERATIONS TEST YES A3.2 i
i NTI-603.01 45% ACCURACY TEST YES B2.1 NTI-603.02 80% ACCURACY TEST
'YES B2.1
)
NTI-603.03 100% ACCURACY TEST-YES B2.1 NTI-603.04 100% STABILITY TEST YES B2.1
'l NTI-604.01 MANUAL REACTOR TRIP YES B2.2(1)
(
NTI-604.02 SIM. TRIP OF ALL FDW PUMPS YES B2.2(2)
NTI-604.03 SIM. CIDSURE OF ALL MSIVs YES B2.2(3)
NTI-604.04 SIM. TRIP OF ALL RCPs YES B2.2(4)
NTI-604.05 TRIP ANY RCP YES B2.2(5)
NTI-604.06 MAIN TURBINE TRIP YES
.B2.2(6)
NTI-604.07 MAX RATE POWER RAMP YES B2.2(7)'
l NTI-604.08' MAX LOCA WITH LOP YES B2.2(8)
NTI-604.09 MAX UNIS01ABLE MS LEAK YES B2.2(9)
NTI-604.10 SLOW RCS DEPRESS W/NO HPSI YES B2.2(10)
NIT-610.05 COOLING TOWER FAN (S) TRIP YES 3.1.2(8)
CC05 NIT-610.09 LOSS OF CCW TO CNTMT FAN CIA YES 3.1.2(8)
CC09 NIT-610.16 CCW UNIS0LABLE LEAK IN CNTMT YES 3.1.2(8)
CC16 NIT-610.21 CCW LINE BREAK IN AUX BLDG iES 3.1.2(8)
CC21 NIT-614.05 LTDN BCK PRESS REG VLV FAILS YES 3.1.2(18)
CV05 NTI-614.16 CHRC LINE BREAK INSIDE CNTMT YES 3.1.2(1)
CV16
(
\\PRCDR\\NTINNT1509Pl. DOC
af.
. PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PAGE:
15 0F 16 NTI-509 ATTACHMENT 7.4 FOURTH YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NIT-616.05 LOSS OF 4.16KV BUS (ES)
~YES 3.1.2(3)
ED05 NIT-617.07 MAIN CEN AUT0 VOLTAGE REC YES 3.1.2(22)
EG07 FAILS TO MANUAL NIT-617.11 DG TRIP ON DIFF PROTECTION YES 3.1.2(3)
EGil NIT-619.05 MTR DRVN EMERG FDW PMP TRIP YES 3.1.2(10)
WO6 NIT-619.14 CNDSR HW LVL CNTRL VLV FAIL YES 3.1.2(5)
W14 NIT-619.29 EMER FDW PIPE LEAK YES 3.1.2(9)
W29 NIT-619.38 FDW PIPE BREAK INSIDE CNTMT YES 3.1.2(20)
W38 NTI-621.04 RUPTURED AIR SPLY TO RAB YES 3.1.2(2)
IA04 NTI-622.10 MS FLOW XMTR FAILURE HI/LO YES 3.1.2(22)
MS10 NTI-622.21 MS LINE BREAK DWNSTRM OF YES 3.1.2(20)
MS21 IFI-0300AS/BS IN CNTMT NTI-623.07 SU CH FAILS TO DE-ENERGIZE YES 3.1.2(21)
NIO7 NTI-624.01 LOSS OF PMC PRI CMPTR CMPLX YES 3.1.2(22)
PC01 f
NTI-625.06 JtAIL CEAC CHANNEL (S) IDSS OF YES 3.1.2(11)
PWO6 i
CPj2 CRT CH. 1,2 NTI-626.05 RCP IDSS OF LUBE OIL YES 3.1.2(4)
RC05 NTI-626.12 CODE SAFETY RELIEF VLV LEAKS YES 3.1.2(1)
RC12-NTI-626.17 SI SYS PRESS INTLK FAILURE YES 3.1.2(17)
RC17
]
NTI-626.21 RCS HOT LEC CNTRL TT FAILS YES 3.1.2(22)
RC21
-NTI-626.25 RCS LEAK SURGE LINE BREAK VES 3.1. 2 ( ).)
RC25 NTI-627.04 CEAS FAIL TO MOVE IN MAN ID YES 3.1.2(13)
RD04 NTI-627.09 CEA REG CRP UNCNTRLD WITHDRW YES 3.1. 2 f,12 )
RD09
\\PRCDR\\NTI\\NTISO9Pl. DOC
e PERFORMANCE TEST NO:
NTI-509 PROCEDURE REV:
1 PAGE:
16 0F 16 NTI-509 ATTACHMENT 7.4 FOURTH YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF
- TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-627.13 CEA DRIFT YES 3.1.2(12)
RD13 NTI-629.05 ESFAS CH FAILS TO TRIP YES 3.1.2(23)
RP05 NTI-630.07-PZR PRESS CNTRIR FAILS OFF YES 3.1.2(18)
RXO7 NTI-630.11 PZR PROP HTRS FAIL ON/0FF YES 3.1.2(18)
RX11 NTI-632.11 SDC HX TUBE LEAK YES 3.1.2(7)
Sill NTI-634.06 LOSS OF TCCW CIS TO IA/SA YES 3.1.2(6)
TP06 c0MPRESSORS NTI-635.06 TURBINE TRIP YES 3.1.2(15)
TUO6 i
]
l
\\PRCDR\\NTI\\NTI509Pl. DOC
grrr--
e i
1 ArrActf4ENT 1 PART 2 SCHEDULE FOR CONDUCT OF PERFORMANCE TESTS I
1
WATERFORD 3 NUCLEAR NO:
NTI-509 e
,TERGY TRAINING INSTRUCTION REY: 2 PAGE: 8 0F 19 w EN PERr0RMANCE TEST RtyP.:ci.67 PROCEDURE NTI-509 ATTACHMENT 8.1 FIRST YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MA!F TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-602.01 NORMAL OPERATION TEST YES A3.2 NTI-603.01 45% ACCURACY TEST YES B2.1 NTI-603.02 80% ACCURACY TEST YES B2.1 NTI-603.03 100% ACCURACY TEST YES B2.1 NTI-603.04 100% STABILITY TEST YES B2.1 NTI-604.01 MANUAL REACTOR TRIP YES B2.2(1)
NTI-604.02 SIM. TRIP OF ALL FDW PUMPS YES 82.2(2)
NTI-604.03 SIM. CLOSURE OF ALL MSIVs YES B2.2(3)
NTI-604.04 SIM. TRIP OF ALL RCPs YES B2.2(4)
NTI-604.05 TRIP ANY RCP YES B2.2(5)
NTI-604.06 MAIN TURBINE TRIP YES B2.2(6)
NTI-604.07 MAX RATE POWER RAMP YES B2.2(7)
NTI-604.08 MAX LOCA WITH LOP YES B2.2(8)
NTI-604.09 MAX UNIS0LABLE MS LEAK YES B2.2(9)
NTI-604.10 SLOW RCS DEPRESS W/NO HPS1 YES B2.2(10)
NTI-604.11 REACTOR TRIP FOLLC iED BY YES 3.1.1.4 RECOVERY TO RATED POWER NTI-610.01 CCW PUMP (S) TRIP YES 3.1.2(8)
CC01 NTI-610.06 RCP SEAL CLR OTLT VLV FAILS YES 3.1.2(8)
CC06 NTI-610.10 LOSS OF CCW TO SDC HX YES 3.1.2(7)
CC10 NTI-610.17 RUPTURE OF CCW PHP DISC PIPE YES 3.1.2(8)
CC17 NTI-612.01 REACTOR FUEL CLADDING FAILS YES 3.1.2(14)
CR01 NTI-614.01 CHA!!GING PUMP TRIP YES 3.1.2(18)
CV01 NTI-614.06 LTDN HX TCV FAILS SHUT YES 3.1.2(18)
CV06 l
K:VITI\\NT1509.00C
1 WATERFORD 3 NUCLEAR N0:
NTI-509 8
,TERGY TRAINING INSTRUCTION REY:
2 PAGE: 9 0F 19 w EN PERFORMANCE TEST Rtype:C1.67 PROCEDURE 1
NTI-509 ATTACHMENT 8.1 FIRST YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-615.01 CW PUMP TRIP YES 3.1.2(5)
CWOI NTI-616.01 FDR BRKR TRIP IN SWITCHYARD YES 3.1.2(3)
ED01 NTI-616.06 LOSS OF 480VAC BUS (ES)
YES 3.1.2(3)
ED06 l
NTI-617.03 MAIN GEN LOAD REJECTION YES 3.1.2(16)
EG03 NTI-617.08 FAILURE OF DG TO AUT0 START YES 3.1.2(3)
EG08 NTI-617.18 H2 SEAL OIL PMP TRIP (H2)
YES 3.1.2(22)
EG18 NTI-619.01 CONDENSATE PUMP TRIP YES 3.1.2(9)
FWO1 NTI-619.08 LOSS OF AUX FDW PUMP YES 3.1.2(9)
FWO8 NTI-619.19 FDW HTR BYPASS VLV FAILURE YES 3.1.2(9)
FW19 NTI-619.30 EMER FDW PHP SUCT HDR LEAK YES 3.1.2(9)
FW30 NTI-621.01 SA/IA CROSS 0VER VLV FAILS YES 3.1.2(2)
IA01 NTI-622.04 STEAM 8YPASS VLV LEAKAGE YIS 3.1.2(17)
MSO4 NTI-622.11 MS LINE BREAK INSIDE CNTMT
E S 3.1.2(20)
MS11 NTI-623.01 SAFETY INSTRMNT CH FAILURE YES 3.1.2(21)
NIO1 NTI-625.01 CPC CHANNEL (S) FAIL YES.
3.1.2(11)
PWOI NTI-626.01 LOSS OF ALL RCPS YES 3.1.2(4)
RC01 NTI-626.08 RCP LOWER SEAL FAILURE YES 3.1.2(4)
RC08 NTI-626.14 PZR SPRAY VALVE FAILURE YES 3.1.2(18)
RC14 NTI-626.18 RCS COLD LEG CNTRL TT FAILS YES 3.1.2(22)
RC18 NTI-626.22 PZR CPC SFTY PT FAILS HI/LO YES 3.1.2(22)
RC22 NTI-626.27 PZR INSTRMNT LINE BREAK YES 3.1.2(1)
RC27 K:\\NTI\\NT1509.00C
WATERFORD 3 NUCLEAR NO:
NTI-509 8 ENTERGY TRAINING INSTRUCTION REV:
2 PAGE: 10 0F 19 e
pERFORxANCE TEST Rtyp.:Ci.67 PROCEDURE NTI-509 ATTACHMENT 8.1 FIRST YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-627.01 CEDM MG SET FAILURE YES 3.1.2(12)
RD01 NTI-627.05 ROD EJECTION YES 3.1.2(12)
RDOS NTI-627.14 FAILURE OF CNTRL/SD BANKS TO YES 3.1.2(12)
RD14 TRIP NTI-629.02 RPS AUTO TRIP FAILURE YES 3.1.2(24)
RP02 NTI-629.06 RPS MATRIX RELAY FAILURE YES 3.1.2(17)
RP06 NTI-630.01 SBC QUICK OPEN SIG FAILS YES 3.1.2(17)
RX01 NTI-630.08 PZR LEVEL CNTRLR FAILS OFF YES 3.1.2(18)
RX08 NTI-630.14 PZR PRESS CNTRL 100X/Y FAILS YES 3.1.2(18)
RX14 NTI-631.01 S/G TUBE LEAK YES 3.1.2(1)
SG01 NTI-632.01 SI PUMP TRIP YES 3.1.2(22)
SIO1 NTI-634.01 TCCW PUMP TRIP YES 3.1.2(6)
TP01 K:\\NTI\\NTI509.00C
WATERFORD 3 NUCLEAR N0:
NTI-509 8
TRAINING INSTRUCTION REY:
2 PAGE: 11 0F 19 w ENTERGY PERFORMANCE TEST Rtype:C1.67 PROCEDURE NTI-509 ATTACHMENT 8.2 SECOND YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF j
TEST NUMBER DESCRIPTION REQ'D REF.
USED l
NTI-602.01 NORMAL OPERATION TEST YES A3.2 l
NTI-603.01 45% ACCURACY TEST YES 82.1 NTI-603.02 80% ACCURACY TEST YES B2.1 NTI-603.03 100% ACCURACY TEST YES B2.1 NTI-603.04 100% STABILITY TEST YES B2.1 NTI-604.01 MANUAL REACTOR TRIP YES B2.2(1)
NTI-604.02 SIM. TRIP 0F ALL FDW PUMPS YES B2.2(2)
NTI-604.03 SIM. CLOSURE OF ALL MSIVs YES B2.2(3)
NTI-604.04 SIM. TRIP OF ALL RCPs YES B2.2(4)
NTI-604.05 TRIP ANY RCP YES B2.2(5)
{
NTI-604.06 MAIN TURBINE TRIP YES B2.2(6)
{
NTI-604.07 MAX RATE POWER RAMP YES B2.2(7)
{
NTI-604.08 MAX LOCA WITH LGP YES B2.2(8)
{
NTI-604.09 MAX UNIS0LABLE MS LEAK YES B2.2(9) l NTI-604.10 SLOW RCS DEPRESS W/NO HPSI YES B2.2(10)
NTI-604.11 REACTOR TP.IP FOLLOWED BY YES 3.1.1.4 RECOVERY TO RATED POWER NTI-610.02 ACCW PUMP TRIP YES 3.1.2(8)
CCO2 NTI-610.12 CCW SURGE TNK LVL SIG FAILS YES 3.1.2(8)
CCl2 NTI-610.18 CCW TUBE LEAK IN CNTMT FAN YES 3.1.2(8)
CC18 COOLERS NTI-613.02 CNTMT SPRAY PUMP (S) FAIL TO YES 3.1.2(23)
CS02 AUT0 START NTI-614.02 CHRG PUMPS FAIL TO AUT0 START YES 3.1.2(18)
CV02 l
l K:\\NTI\\NTI509. DOC
WATERFORD 3 NUCLEAR NO:
NTI-509 e
,ERGY TRAINING INSTRUCTION REV: 2 PAGE: 12 0F 19 w ENT PERFORMANCE TEST ReyP.:Ci.67 PROCEDURE NTI-509 ATTACHMENT 8.2 SECOND YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-614.14 CVCS LTDN LEAK IN CNTMT YES 3.1.2(1)
CV14 NTI-616.02 LOSS OF MAJOR STATION XFMR YES 3.1.2(3)
ED02 NTI-616.07 LOSS OF 125VDC BUS (ES)
YES 3.1.2(3)
ED07 NTI-617.04 MAIN GEN OUTPUT BKR FAILS TO YES 3.1.2(22)
EG04 OPEN ON AUT0 TRIP NTI-617.09 FAILURE OF DG TO LOAD YES 3.1.2(3)
EG09 NTI-617.19 H2 SEAL OIL PMP TRIP (AIR)
YES 3.1.2(22)
EG19 NTI-619.03 FEEDWATER PUMP OVERSPD TRIP YES 3.1.2(9)
FWO3 NTI-619.10 CONDENSER VACUUM PUMP TRIP YES 3.1.2(5)
FW10 NTI-619.20 SU FDW REG VLV FAILURE YES 3.1.2(9)
FW20 NTI-619.36 FDW PIPE liREAK OUTSIDE CNTMT YES 3.1.2(20)
FW36 NTI-621.02 IA ISOL VLV FAILS TO YES 3.1.2(2)
IA02 CLOSE ON CIAS NTI-621.05 IA CMPRSR DISCH LINE RUPTURE YES 3.1.2(2)
IA05 NTI-622.05 ATMOS STM DUMP VLV FAILS YES 3.1.2(17)
MS05 NTI-622.12 MS LINE BREAK OUTSIDE CNTMT YES 3.1.2(20)
MS12 AFTER MSIV NTI-623.03 CNTRL CH INSTRMNT FAILURE YES 3.1.2(21)
NIO3 NTI-625.02 RX PWR CB FAILS TO DROP CEAS YES 3.1.2(11)
PWO2 NTI-626.03 RCP SHAFT SEIZURE YES 3.1.2(4)
RC03 NTI-626.09 RCP MIDDLE SEAL FAILURE YES 3.1.2(4)
RC09 NTI-626.15 PZR CNTRL LT FAILS HI/LO YES 3.1.2(18)
RC15 l
NTI-626.19 RCS COLD LEG SFTY TT FAILS YES 3.1.2(22)
RC19 A:\\NTI\\NTI509.00C
WATERFORD 3 NUCLEAR NO:
NTI-509 e
,TERGY TRAINING INSTRUCTION REY: 2 PAGE: 13 0F 19 w EN PERr0RnANCE TEST ReyP.:Ci.67 PROCEDURE NTI-509 ATTACHMENT 8.2 SECOND YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-626.23 RCS COLD LEG PIPE RUPTURE YES 3.1.2(1)
RC23 NTI-627.02' DROPPED CEA YES 3.1.2(12)
RD02 NTI-627.06 CEA GRP UNCNTRLD INSERTION YES 3.1.2(12)
RD06 NTI-627.11 CEAS MECHANICALLY STUCK YES 3.1.2(12)
RD11 NTI-627.21 CEA UPR ELEC LIMIT FAILURE YES 3.1.2(12)
RD21 NTI-629.03 RX TRIP WITH NO AUTO TURBINE YES 3.1.2(19)
RP03 TRIP I
NTI-630.04 MFV FLOW CNTRL VLV FAILURE YES 3.1.2(9)
RX04 NTI-630.09 S/G LEVEL CNTRL FAILURE YES 3.1.2(22)
RXO9 NTI-631.04 MS LINE PRESS XMTR FAILS YES 3.1.2(22)
SG04 NTI-632.04 AIR BINDING IN SI SYSTEM YES 3.1.2(7)
SIO4 NTI-633.01 TURBINE LOAD CNTRL DMD FAILS YES 3.1.2(17)
TC01 NTI-634.04 TCCW HX A OUTLET HDR LEAK YES 3.1.2(6)
TPO4 K:\\NTI\\NTI509. DOC
- 1. #'1 WATERFORD 3 NUCLEAR NO:
NTI-509 8
,TERGY TRAINING INSTRUCTION REV: 2 PAGE:.14 0F 19 w EN PERr0RMANCE TEST ReyP.:Ci.67 PROCEDURE NTI-509 ATTACHMENT 8.3 THIRD YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.-
USED NTI-602.01 NORMAL OPERATION TEST YES A3.2 NTI-603.01 45% ACCURACY TEST YES B2.1 NTI-603.02 80% ACCURACY TEST YES-82.1 NTI-603.03 100% ACCURACY TEST YES B2.1 NTI-603.04 100% STABILITY TEST YES B2.1 NTI-604.01 MANUAL REACTOR TRIP YES B2.2(1)
NTI-604.02 SIM. TRIP OF ALL FDW PUMPS YES B2.2(2)
NT1-604.03 SIM. CLOSURE OF ALL MSIVs YES B2.2(3)
NTI-604.04 SIM. TRIP OF ALL RCPs YES B2.2(4)
NTI-604.05 TRIP ANY RCP YES B2.2(5)
NTI-604.06 MAIN TURBINE TRIP YES B2.2(6)
NTI-604.07 MAX RATE POWER RAMP YES B2.2(7)
NTI-604.08 MAX LOCA WITH LOP YES B2.2(8)
NTI-604.09 MAX UNIS0LABLE MS LEAK YES B2.2(9)
NTI-604.10 SLOW RCS DEPRESS W/NO HPSI YES B2.2(10)
NTI-604.11 REACTOR TRIP FOLLOWED BY YES 3.1.1.4 REC 0VERY TO RATED POWER NTI-610.03 CCW PUMP BEARING SEIZURE YES 3.1.2(8)
CC03 NTI-610.08 LOSS OF COOLING WTR TO DG YES 3.1.2(8)
CC08 NTI-610.15 LOSS OF CCW TO LPSI PMP CLRS YES 3.1.2(8)
CC15 NTI-610.19 AUX CCW PHP DISC HDR RUPTURE YES 3.1.2(8)
CC19 NTI-614.03 CHRG PUMP SEAL LUBE PUMP YES 3.1.2(18)
CV03 MOTOR FAILS NTI-614.15 CVCS LTDN LEAK OUTSIDE CNTNT YES 3.1.2(1)
CV15 l
K:\\NT!\\NTI509. DOC
o
)
WATERFORD 3 NULLEAR N0:
NTI-509 e
TRAINING INSTRUCTION REY: 2 PAGE: 15 0F 19 w ENTERGY PERr0RMANCE TEST Rtyp.:Ci.67 PROCEDURE j
NTI-509 ATTACHMENT 8.3 THIRD YEAR RETEST LIST l
PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-616.04 LOSS OF 6.9KV BUS (ES)
YES 3.1.2(3)
ED04 NTI-616.10 LOSS OF 208/120V BUS (ES)
YES 3.1.2(3)
ED10 NTI-617.05 EXCIT.BKR FAILS TO AUT0 TRIP YES 3.1.2(22)
EG05 NTI-617.10 DG OVERSPEED TRIP YES 3.1.2(3)
EGIO NTI-617.20 STATOR COOLANT HIGH COND.
YES 3.1.2(15)
EG20 NTI-619.04 FDW PMP TURB SPD CNTRL FAIL YES 3.1.2(9)
FWO4 NTI-619.12 FDW PUMP TURBINE HIGH VIB YES 3.1.2(9)
FW12 NTI-619.21 CONDENSER AIR IN LEAKAGE YES 3.1.2(5)
FW21 NTI-619.37 FDW PIPE BREAK OUTSIDE CNTMT YES 3.1.2(20)
FW37 NTI-621.03 RUPTURE AIR SUPPLY TO STEAM YES 3.1.2(2)
IA03 BYPASS VALVES NTI-622.09 S/G STM FLOW XHTR FAILURE YES 3.1.2(22)
MSO9 NTI-622.13 MS LINE BREAK OUTSIDE CNTMT YES 3.1.2(20)
MS13 j
BEFORE MSIV NTI-622.22 TURBINE IST STAGE PRESSURE YES 3.1.2(22)
MS22 XHTR FAILS NTI-623.05 SU INSTRUMENT CH FAILURE YES 3.1.2(21)
NIO5 NTI-625.03 RX PWR CB FAILS TO SB/RB YES 3.1.2(11)
PWO3 NTI-626.04 RCP SHEARED SHAFT YES 3.1.2(4)
RC04 i
NTI-626.11 CODE SAFETY FAILURE OPN/CLSD YES 3.1.2(1)
RC11 NTI-626.16 RCP SPEED XMTR FAILS YES 3.1.2(22)
RC16 NTI-626.20 RCS HOT LEG SFTY TT FAILS YES 3.1.2(22)
RC20 NTI-626.24 RCS HOT LEG PIPE RUPTURE YES 3.1.2(1)
RC24 i
K:\\NTI\\NTI509.00C
,; a WATERFORD 3 NUCLEAR NO:
NTI-509 8
,ERGY TRAINING INSTRUCTION REY:
2 l
PAGE: 16 0F 19
= ENT PERFORMANCE TEST Rtype:C1.67 PROCEDURE NTI-509 ATTACHMENT 8.3 THIRD YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-627.03 CEAS FAIL TO MOVE IN MAN GP YES 3.1.2(13)
RD03 NTI-627.12 CEA UNCNTRLD WITHDRAWAL YES 3.1.2(12)
RD12 NTI-627.24 RX TRIP BRKR FAILS TO OPEN YES 3.1.2(24)
RD24 NTI-629.04 ESFAS TRIP GENERATED YES 3.1.2(23)
RPO4 NTI-630.05 S/G LEVEL SETPOINT DRIFT YES 3.1.2(22)
RX05 NTI-630.10 PZR BU HTRS FAIL YES 3.1.2(18)
RX10 NTI-631.05 S/G LEVEL XMTR FAILURE YES 3.1.2(22)
SG05 NTI-632.08 LPSI PUMP SUCT LINE RUPTURE YES 3.1.2(7)
SIO8 NTI-634.05 LOSS OF WTR TO HW COOLERS YES 3.1.2(6)
TP05 K:\\NTI\\NT1509. DOC
\\
e, WATERFORD 3 NUCLEAR NO:
NTI-509 e
,TERGY TRAINING INSTRUCTION REV: 2 PAGE: 17 0F 19 w EN PERPORMANCE TEST Reyp.:C1.67 PROCEDURE NTI-509 ATTACHMENT 8.4 FOURTH YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-602.01 NORMAL OPERATIONS TEST YES A3.2 NTI-603.01 45% ACCURACY TEST YES B2.1 NTI-603.02 80% ACCURACY TEST YES B2.1 NTI-603.03 100% ACCURACY TEST YES B2.1 NTI-603.04 100% STABILITY TEST YES B2.1 NTI-604.01 MANUAL REACTOR TRIP YES B2.2(1)
NTI-604.02 SIM. TRIP 0F ALL FDW PUMPS YES B2.2(2)
NTI-604.03 SIM. CLOSURE OF ALL MSIVs YES B2.2(3)
NTI-604.04 SIM. TRIP OF ALL RCPs YES B2.2(4)
NTI-604.05 TRIP ANY RCP YES B2.2(5)
NTI-604.06 MAIN TURBINE TRIP YES B2.2(6)
NTI-604.07 MAX RATE POWER RAMP YES B2.2(7)
NTI-604.08 MAX LOCA WITH LOP YES B2.2(8)
NTI-604.09 MAX UNIS0LABLE MS LEAK YES B2.2(9)
NTI-604.10 SLOW RCS DEPRESS W/NO HPSI YES B2.2(10)
NTI-604.11 REACTOR TRIP FOLLOWED BY YES 3.1.1.4 RECOVERY TO RATED POWER l
NTI-610.05 COOLING TOWER FAN (S) TRIP YES 3.1.2(8)
CC05 NTI-610.09 LOSS OF CCW TO CNTMT FAN CLR YES 3.1.2(8)
CC09 NTI-610.16 CCW UNIS0LABLE LEAK IN CNTMT YES 3.1.2(8)
CC16 NTI-610.21 CCW LINE BREAK IN AUX BLDG YES 3.1.2(8)
CC21 NTI-614.05 LTDN BCK PRESS REG VLV FAILS YES 3.1.2(18)
CV05 NTI-614.16 CHRG LINE BREAK INSIDE CNTMT YES 3.1.2(1)
CV16 K:\\NTI\\NTI509.00C
Ii WATERFORD 3 NUCLEAR NO:
NTI-509 e.ENTERGY TRAINING INSTRUCTION REY:
2 PAGE: 18 0F 19 w
eERFORMANCE TEST Reyp.:Ci.67 PROCEDURE NTI-509 ATTACHMENT 8.4 FOURTH YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-616.05 LOSS OF 4.16KV BUS (ES)
YES 3.1.2(3)
ED05 NTI-617.07 MAIN GEN AUT0 VOLTAGE REG YES 3.1.2(22)
EG07 FAILS TO MANUAL NTI-617.11 DG TRIP ON DIFF PROTECTION YES 3.1.2(3)
EGil NTI-619.05 MTR DRVN EMERG FDW PMP TRIP YES 3.1.2(10)
FWO6 NTI-619.14 CNDSR HW LVL CNTRL VLV FAIL YES 3.1.2(5)
FW14 NTI-619.29 EMER FDW PIPE LEAK YES 3.1.2(9)
FW29 NTI-619.38 FDW PIPE BREAK INSIDE CNTMT YES 3.1.2(20)
FW38 NTI-621.04 RUPTURED AIR SPLY TO RAB YES 3.1.2(2)
IA04 NTI-622.10 MS FLOW XHTR FAILURE HI/LO YES 3.1.2(22)
MS10 NTI-622.21 MS LINE BREAK DWNSTRM OF YES 3.1.2(20)
MS21 IFT-0300AS/BS IN CNTMT NTI-623.07 SU CH FAILS TO DE-ENERGIZE YES 3.1.2(21)
NIO7 NTI-624.01 LOSS OF PMC PRI CMPTR CMPLX YES 3.1.2(22)
PC01 NTI-625.06 RAIL CEAC CHANNEL (S) LOSS OF YES 3.1.2(11)
PWO6 CP02 CRT CH. 1,2 NTI-626.05 RCP LOSS OF LUBE OIL YES 3.1.2(4)
RC05 NTI-626.12 CODE SAFETY RELIEF VLV LEAKS YES 3.1.2(1)
RCl2 NTI-626.17 SI SYS PRESS INTLK FAILURE YES 3.1.2(17)
RC17 NTI-626.21 RCS HOT LEG CNTRL TT FAILS YES 3.1.2(22)
RC21 NTI-626.25 RCS LEAK SURGE LINE BREAK YES 3.1.2(1)
RC25 NTI-627.04 CEAS FAIL TO MOVE IN MAN ID YES 3.1.2(13)
RD04 NTI-627.09 CEA REG GRP UNCNTRLD WITHDRW YES 3.1.2(12)
RD09 K:\\NTI\\NT1509.00C a
- o l
', O t' J
WATERFORD 3 NUCLEAR NO:
NTI-509 8
,ERGY TRAINING INSTRUCTION REV: 2 PAGE: 19 0F 19 T MT PERFORNANCE TEST Reyp.:Ci.67 PROCEDURE I
NTI-509-ATTACHMENT 8.4 FOURTH YEAR RETEST LIST PERFORMANCE PERFORMANCE TEST CERT.
ANS-3.5 MALF TEST NUMBER DESCRIPTION REQ'D REF.
USED NTI-627.13 CEA DRIFT YES 3.1.2(12)
RD13 NTI-629.05 ESFAS CH FAILS TO TRIP YES 3.1.2(23)
RP05 NTI-630.07 PZR PRESS CNTRLR FAILS OFF YES 3.1.2(18)
RXO7 NTI-630.ll PZR PROP HTRS FAIL ON/0FF YES 3.1.2(18)
RX11 NTI-632.ll SDC HX TUBE LEAK YES 3.1.2(7)
Sill NTI-634.06 LOSS OF TCCW CLG TO IA/SA YES 3.1.2(6)
TP06 COMPRESSORS NTI-635.06 TURBINE TRIP YES 3.1.2(15)
TUO6 i
K:\\KTI\\NTI509,00C
- g ? y
- ~.
i
)
ATTACHMENT 2 CERTIFICATION TEST PLAN CHANGES
~
2g*3 -
u
' ~
j Certification Test Plan Changes Year One NTI627.10 "CEAS MOVE OUT WHEN INWARD MOVEMENT REQUIRED IN AUT0" deleted because automatic CEA control is not used at Waterford 3 lear Two NTI 613.01 renumbered NTI 613.02 because of typographical error.
NTI 629.07 "RPS BISTABLE RELAY FAILURE" deleted because of the lack of training value.
Year Three q
NTI 626.16A renumbered NTI 626.16 due to NTI deletion.
i NTI 626.16B "RCP SPEED XMTR FAILS Q - FF" deleted because these speed transmitters have no control board indications of failure.
NTI 627.08 " DROPPED CEA WITH N0 ALARM" deleted because of the lack of
-training value.
l Year Four NTI 619.06 renumbered NTI 619.05 because of typographical error.
j:/sim/ cert / cert 95a2. doc
sas s
ATTACHMENT 3 SIl4JLATION FACILITY CERTIFICATION NRC FORM 474
r bfh NRC FORM 474 U.S. NUCLEAR RELULATORY C,OMMISSION APPROVED BY OMR; NO.3160-0138 pq EXPtRES: 16/31/95 ESTRAATED BURDEN PER RESPONSE TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST:
120 HOURS.
FORWARD SIMULATION FACILITY CERTIFICATION
" " ' ' " * " " ^ " ' "
- ""58"^'"
" * " " ^ "
$ANBB 7714),'""U."S.
RECORDS MANAGEMENT BRANCH NUCLEAR REGUI.ATORY COMMISSON, WASHINGTON, DC 205550001 AND TO THE PAPERWORK REDUCTION PRCklECT p1540138), OFFICE OF MANAGEMENT AND BUOGET, WASHINGTON. DC 20603.
INST 7tUCTIONS: TNs form le to be filed for enmal certiflcation, recettification (if required), and for any change to a simulation facility performance testing plan made after inttaal submittal of such a plan. Provide the following information and checas the appropriate box to Indicate reason for submittal FACluTY
- DUCKET NUMBER Waterford 3 Steam Electric Station 50- 382 UCENSEE DATE Entergy Operations Inc.
3/20/95 o
This is io c.,tify ihar-
- 1. The atmo named facility 16censee le using a simuishon facility conersting solely of a plant-referenced simulator that meets the requirements of to CFR 66.45.
- 2. Documentation is available for NRC review in acco. dance with 10 CFR $5.45(b).
- 3. Thse simulation facility meets the guidance conta6ned in ANSI /ANS 3.S,1985, as endorsed by NRC Regulatory Guide 1.149.
W there are any EXCEPTlONS to the certification of this item, CHECK HERE [ ] and describe fully on additenal pages as necessary.
NAME (w other Meneficapan) AND LOCATION OF BIMULATION FACIUTY.
Waterford 3 Simulator James M. Cain Energy Education Center y
BIMULATION FACIUTY PERFOFIMANCE TEST ABSTRACTS ATTACHEO. (For perfbrmance tests conducted M the peMod ending with the defe of thre ceruecabort)
DESCRPTION OF PERFORMANCE TESTING COMPLETED. (Attach addtbonal pages as necesswy and odenbry the item descnp6an borng conknued)
See Attachment 1, Part 1 BIMULATION FAClu1Y PERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct of maprostmately 25" of performance loses per year Ibr the four-yearperiod commenump with X
the dare oIlfus cer##canort)
DESCRIPTION OF PERFORMANCE TESTlNG 10 UE CONDUCTED. (AMech eddrhanalpages an necessary and identHy lhe nem oescnphon bonng cononued.)
See Attachment is Part 2 x
PERFORMANCE TESTING PLAN CHANGE. (For any modehescon to a perfbrmance reseng plan subavfted on a preveous cerescaeort)
DESCRIPTION OF YERFORMANCE TESTING PLAN CHANGE LAttach addtkoner pages as necessary and ndencry the Rem descropOon bewrg conbnved)
See Attachment 2 FIECERTlFICATION (Describe correcove acsons takea eitsch resorts o' completed performance tesung en accordance with 10 CFR 6L4S(b)(S)(v).
(Atrach additronalpages as necessary and identrfy the nem desortphon borng conknued)
Any talee statement or omession in ttwo document. includmg attachments, may be subject to civil and criminal sanctions. I certify under penalty of per}ury that the information in this j
document and attachments is true and correct.
SIGNATURE - AUTHORIZED REIHESENT ATIVE TITLE DATE j
I 1
in accordance witn to CFR SS.S. Communications, this form shaft be submmed to the NRC as follows:
SY Matt ADOFtESSED TO-DIRECTOR, OFFICE OF NUCLEAR REACTOR REQULATION BY DEUVERY IN PERSON ONE WHITE FLINT NORTH U.S. NUCLEAR REGULATORY COMMISSION TO THE NRC OFFICE AT:
1ises HOCKVILLE PIKE WASHINGTON, DC 206S5-0001 ROCKVIllE, MD NRC FORM 474 (1092)
PRINTED ON RECYCLED PAPER
_______;