ML20081C842

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Low Temp Overpressure Protection Sys
ML20081C842
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/29/1984
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML112630714 List:
References
NUDOCS 8403150041
Download: ML20081C842 (3)


Text

, . _ - ___ __ ____ - -___ _

. +

3.1.2.7 Prior to reaching six effective full power years of operation, Figures 3.1.2-1, 3.1.2-2 and 3.1.2-3 shall be updated for the next service period in accordance with 10CFR50, Appendix G, Section V.B. The service period shall be of sufficient duration to permit the scheduled evaluation of a portion of the surveillance data scheduled in accordance with Specification 4.2.7. The highest predicted adjusted reference temperature of all the beltline region materials shall be used to determine the adjusted reference temperature at the end of the service period. The basis for this prediction shall be submitted for NRC staff review in accordance with Specification 3.1.2.8. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

3.1.2.8 The updated proposed technical specifications referred to in 3.1.2.7 shall be submitted for NRC review at least 90 days prior to the end of the service period. Appropriate additional NRC review time shall be allowed for proposed technical specifications submitted in accordance with 10 CFR Part 50, Appendix G, Section V.C.

I 3.1.2.9 With the exception of ASME Section XI testing and when the core flood tank is depressa?ized, during a plant cooldown the core j flood tank discharge valves shall be closed and the circuit i breakers for the motor operators cpened before depressuriz.ing the reactor coolant system below 600 psig.

3.1.2.10 With the exception of ASME Section XI testing, fill and vent of the reactor coolant system, and to allow maintenance of the valves, when the reactor coolant temperature is less than that indicated by point C of Figure 3.1.2-2 or 3.1.2-3 as appropriate, the four High Pressure Injection motor operated valves shall be l closed with their circuit breakers open.

3.1.2.11 The plant shall not be operated in a water solid condition when the RCS pressure boundary is intact except as allowed by Emergency Operating Procedures and during System Hydrotest.

AMENDMENT NO. 57 18a ARKANSAS - UNIT 1 8403150041 840229 PDR ADOCK 05000313 P PDR

The h'eatup and cooldown rate stated in this specification are intended as the maximum changes in_ temperature in one direction in a one hour period.

The actual temperature linear ramp rate may exceed the stated limits for a time period provided that the maximum total temperature difference does not exceed the limit and that a temperature hold is observed to prevent the total temperature difference from exceeding the limit for the one hour period.

Specification 3.1.2.9 is to ensure that the core flood tanks are not the source for pressurizing the reactor coolant system when in cold shutdown.

Specification 3.1.2.10 is to ensure that high pressure injection is not the source of pressurizing the reactor coolant system when in cold shutdown.

Specification 3.1.2.11 is to ensure that the reactor coolant system is not operated in a manner which would allow overpressurization due to a temperature transient.

REFERENCES (1) FSAR, Section 4.1.2.4 (2) ASME Boiler and Pressure Code,Section III, N-415 (3) FSAR, Section 4.3.10.5 (4) BAW-1440 J

i i

I l

AMENDMENT NO. 2, 22, 28 20 ARKANSAS - UNIT 1 I

I

.- Table 4.1-1 (Cont'd)

Channel Description Check Test Calibrate Remarks

47. EFW Actuation Control Logic NA M R 148. EFW Flow Indication R NA R
49. RCS subcooling margin D -NA R monitor 50.-Electromatic relief valve D NA R flow monitor
51. Electromatic relief block D NA R valve position indicator
52. Pressurizer. safety valve D NA R

. flow monitor

53. Pre, murizer water level D NA R indicator-
54. Control Room Chlorine' Detector D M R
55. Low Temperature Overpressure NA R R Applies only during cooldown and in Protection System cold shutdown conditions

- Note: S-Each Shift T/W-Twice per Week R-Once every 18 months W-Weekly . Q-Quarterly PC-Prior to going Critical if not M-Monthly P-Prior to eaca startup done within previous 31 days

~

D-Daily if not done previous NA-Not applicable week B/M-Every 2 months 4

9

..