Motion for Leave to File Late,Due to Delays in Typing & Reproduction
ML20081C365
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/07/1984
From: Hodder M
CENTER FOR NUCLEAR RESPONSIBILITY, HODDER, M.H.
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20081C353 List:
References
84-496-03-LA, 84-496-3-LA, OLA, NUDOCS 8403140023
Download: ML20081C365 (3)


Text

__.-.t -

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) Docket Nos. 50-250 OLA

)

Florida Power & Light Co. ) 50-251 OLA

)

Turkey Point Units 3 & 4 )

MOTION FOR LEAVE TO FILE LATE Petitioners, Center for Nuclear Responsibility and Joette Lorion,' motion that they be granted leave to file Petitioners' Response to Staff and Florida Power Light Responses to Amended Petition to Intervene on Thursday, March 8, 1984, rather than on March 7, 1984, as required by the schedule established by the Atomic Safety and Licensing Board at the Prehearing Conference held in Homestead, Florida on February 28, 1984.

Although, the brief was written in full on March 7, 1984, delays in typing and reproduction have necessitated this request to file on March 8, 1984.

8403140023 840307 PDR ADOCK 05000250 R spectfully Submitted,

'f'uL WC

  • Martin H. Hod er Attorney for the Center for Nuclear Responsibility and Joette Lorion

. Al CHRONOIDGICAL APPENDIX OF NRC AND FPL RESPCNSES TO PRESSURIZED THERMAL SiOCK PROBLEM h January 1979 U.S. Department of Camerce, National 7bchnical Information Service,

" Identification of Unresolved Safety Issues," PB 291-507, focuses on

" unresolved safety issue of reactor vessel toughness."

2. May 4, 1981 Policy Information Paper - SECY-81-286 rr.garding Pressurized thermal Shock.
3. April 20, 1981 Ietter to PWR owners regarding Pressurized Thermal Shock to Peactor Pressure Vessels.
4. August 21, 1981 Ietter Eisenhut, N C, to Chrig, FPL regarding a 10CFR 50.54f request for information on ability of Turkey Point reactor to withstand pressurized thermal shock and pointing out that scme RPVS are approaching levels f concern.
5. November 23,1982 SECY-82-465, NRC Staff Evaluation of Pressurized Thermal Shock.
6. Deceber 3, 1982 Memorandum frcm Demetrios Basdekas, Instrumentation and Control Branch of Facility Operation's, Office of Nuclear Regulatory Research, to Cmmissioners Gilinsky and Ahearne, regarding SECY-82-465, November 23, 1982, which discusses the probability of PTS caused core melt.
7. January 31, 1983 Letter frm Mcdonald, NRC, to FPL Canpany, sunmarizing a January 26th meeting regarding FPL's plans and schedules to resolve the PTS problem at Turkey Point.
8. February 25,1983 SECY-83-79, meeting with licensees regardmg programs to deal with pressurized thermal shock, and proposed rulerraking that would establish RP NDr screening criteria, and flux reduction programs.

~

9. March 25, 1983 Ietter fran Robert E. Uhrig, FPL, to Steven A. Varga, NBC, presenting written materials to support the January 26th meeting on FPL's plans to deal with the PTS problem at Turkey Point.

10 s June 3, 1983 Ietter fran Robert E. Uhrig, FPL, to Darrel G. Eisenhut, NBC, requesting amendments to operating licenses DPR-31 and DPR-41 to support a planned fuel core design change to Turkey Point 3 and 4.

11s July 6,1983 Ietter fran Uhrig, FPL, to Eisenhut, NBC, requesting a meeting to discuss: A) a change in the fuel core design and technical specification and reduction of safety limits necessitated by the design change, b) FPL's cmprehensive program to address the FTS problem.

12. August 19, 1983 Ietter Uhrig, FPL, to Eisenhut, NRC, requesting a change to technical specification and safety margin limits to support the FPL vessel flux reduction program.with attatched safety evaluation.
13. September 9,1983 Ictter Uhrig, FPL, to Eisenhut, NBC, subnitting FPL's Significant Hazards Consideration for proposed FAE/ E) Amendment.
14. September 20,1983 letter Robert E. Uhrig, FPL, to Eisenhut, NRC, additional analysis (IOCA with ungridded BART Model) for Fa H BART Technical Specification Amendment.

A2

15. Decaux.r 9,1983 Istter Daniel G. Mcdonald, NBC , to Ibbert E. Uhrig, FPL, granting license amendments No. 98 and No. 92 to Turkey Point Units 3 and 4,

-with a No Significant Hanrds Detemnination and Safety Evaluation to support a planned fuel core design change at Turkey Point.

16. Der 21,1983 Ietter frcn Cecil O. Thcnas, Chief of Special Projects Division NRC, Division of Licensing, to Mr. E.P. Rahe, Jr., Manager Westinghouse Nuclear Technology Division, Safety Evaluation Report on BARP code.
17. Dhr 23,1983 Letter Mcdonald, NBC, to Chrig, FPL, granting license amenchents No. 99 and 93 to Turkey Point Units 3 and 4, with attatched Safety Evaluation and No Significant Hazards Consideration to allow change in technical specifications and reduction in safety margins to support the pressure vessel flux raduction program at Turkey Point.