-- AVEHAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-250 UNIT Turkey Point #3 DATE 2 84 COMPLETED By N.W. Grant (305) 552-3675 TELEPilONE MONTH January, 1984 DAY.

AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVE1 IMWe Net)

-(Mwe-Nes) 1 17 576 2

18 pos; 19 395 3

4 20 398 637 5

2; 693 6

22 689 7

3 68/

89 8.

24 431 9

217 25 10-371 591 26 597-11 27 673 685 12 28 W

687 682 l3 29 559-680 34 30 461 M2 II 3,

688 16 INSTRUCTIONS,

On this format.hst the aveuge daily unit power leselin MWe Net for each day in the reporting month. Cony ute to the nearest whole :Ngawatt.

NI77)

I f

3020033 840133 p

ADOCK ODOpop 3 I

g FIA t.

i

i w.

OPERATING DATA REPORT DOCKET NO. 50-250 10-M DATE ff.W. Grant COMPLETED BY TELEPHONE (305) 662-3675 OPERATING STATUS Notes

1. Unit Name:

Turkey Point Unit #3

2. Reporting Period:

Janua ry,1984 Unit #3 returned to service 2,200 following refueling' and~

3. Licensed Thermall ower (MWt):

760 scheduled maintenance

4. Nameplate Rating tGross MWe):
5. Design Electrical R iting (Net MWe):

693

~ 6. Maximum Dependa ble Capacity (Gross MWe):

700 666

7. Maximum Depends ble Capacity (Net MWe):
8. If Chr.nges Occur is Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted.If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr to-Date Omnulative

11. ' Hours in Reporting Period 744 7dd 47--An4 6
12. Number Of Hours iteactor Was Critical 603.1 603.1 66 909.3
13. Reactor Reserve SI utdown Hours 0

0 844.4

14. Hours Generator O i.Line 544.2 544.2 66 466.1 0

0 121.8 15.- Unit Reserve Shut (own l{oun

16. Gross Thermal Eneiy Generated (MWil) 1 049 166 1 049 166 "136 537 75R 334 065 334 065 43 544 630
17. Gross Electrical En ergy Generated (MWH) 313 088 313 088 41 226 105
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor

/3.1 73.1 68.0

20. Unit Availability Factor
21. Uriit Capacity Factar (Using MDC Net) 63.2 63.2 65.1 60.7 60.7 60.8

-22. Unit Capacity Fact >r (Using DER Net) 4.7 4.7 5.4

23. Unit Forced Outag: Rate
24. Shutdowns Schedu ed Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At E id Of Report Period. Estimated Date of Startup:
26. Units In Test Statu s (Prior to Commercial Operation):

Forecast Achined I s'ITIA L CRITICALITY IN'ITIAL ELECTRICITY

( OMM ERCIAL OPERATION 01/77)

L

m Pag: 1 cf 2 '

% 250 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turkey Point Unit #5 DATE 2-15-84 COMPLETED BY N.hl. Grant REPORT MONTH January. 1984 TELEPHONE I305i 547 4 74

~.

E E

.] g 3

yI5 y{;,

Licensee g3, Cause & Corrective No.

Date i

3=

i

,a s 5 Event g

Action to f:

E 5 ;=r3 H

Report e in L o

Prevent Recurrence

=

g u

e e

11 840101 S

164.1 C

4 RC FUELXX Unit #3. returned to service from re-fueling and scheduled maintenance.

01 840108 F

10.4 H

3 250-84-01 HH ZZZZZZ

' Spurious signal closed feedwater flow control valve.

02 840109 F

3.4 G

2 250-84-03 IA ZZZZZZ Personnel error; a licensed operator inadvertently tripped reactor trip -

breaker "A" with the "A" bypass breaker open.

03 840114 S

9.0 B

1 HA TURBIN Turbine overspeed test

~

l 2

3 4

F Forced Reason:

Method:

Exhibit G-Instructions S Scheduled A Equipment Failure (Explam) 1 -Marual for Preparation of Data B Maintenance ci Test 2-Manual Scram.

Entry Sheets for Licensee

c. Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D Regulatory Restriction 9-Other i Explain) 0161) li Operator Trainmr & Lscense Examination F Administrative 5

G-Operational Firor (F splam)

c. 4e a ettovev..d Eshibit I - Same Source 49/77)

Il-Ot her ( E xplain)

r Pagn 2 cf 2 A

UNIT SHUTDOWNS AND POWER REDUCTIONS

- DOCKET NO.

60 260 UNIT NAME Turkey pnin+ 'Init #3 DATE

?-15 oA

. January, 1984 COMPLETED BY u,u, e-REPORT MONDI TELEPHONE r3ng) 553 33r5 i

E c

.!'?

h 3IE Licensee

_ [g h.

Cause & Currective

.w..

Ape g

-> g 2 ; 6:

twent y

Action to yE E

y;jj=g H

Report a mU Prevent Recurrence e

e u

o 04 840117 F

7.7 A

1 HA TURBIN Balancing main turbine.

05 840118 F

0.0 A

5 HH PUMPXX 3B steam generator feedwater pump thrust bearings.

06 840125 F

5.2 G

3 LER-84-05 EB ZZZZZZ

~ Personnel construction worker in-advertenly tripped 4160V bus re-sulting in a unit trip.

07 840125 F

0.0 A

4 HH INSTRU During return to full power, one

. channel of A & C S/G pressure and flow instrumentation failed. Power was held at 55% for repairs.

I 2

3 4

I: For ced Reason:

Method:

Exhibit G -Instructions S Ssheduled A Equipment Failure (Explain) l-Manual for Preparation of Data IbMaintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Seram.

Event Report (LER) File (NUREG-D Regulatory Restriction

$0ther ( Explain) 016I) li-Operator Training & License Exanunation F Administrative 5

G-Operational Feror (Esplain) c_ /.o e 44evew.d Exlubit I - Same Source Pl/77)

Il-Olher ( E splain)

3-l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-250 UNIT-Turkey Point Uilit #3 DATE February 15, 1984 COMPLETED BY N.W. Grant (305) 552-3675 TELEPHONE REPORT MONTH-January,1984 Unit #3 ended the. refueling outage on January 7,1984 and operated at e'sentially full power for the. remainder of the period.

s Major safety related maintenance activities included:

An overhaul of the 480V bus feed breaker The turbine governer valves were tested PORV leaking valve bonnet was repaired Bent reactor coolant pump shaft was straightened

. Inspections and requirements of IE Bullentines and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 imple:r,entation

-are continuing.

Refer to correspondence between FPL and NRC for additional

. information.

AVER AGE DAILY UNIT POWER LEVEL i

0-2M DOCKET NO.

UNIT Turkey Point #4 2-15-84 DATE COMPLETED BY N.W. Grant 1.

TELEPilONE (305) 552-3675 MONTH January, 1984 DAY AVERAGE DAIL, PO ER LEVEL DAY AVER AGE DAILY POWER LEVEL 694 6

2-694 680 18 694 680 3

i 4

692 20 680 5

692 685 23 564-690 6

22 7

151 23 687

.8 686-685 24 b00 000 9

25 688 677 0

'6 688 674 II 27 689 678 12 28 13 688 683 29 I4 685 30 en is 683 31 685 16 686

' INSTRUCTIONS On this format, list ti e average daily unit power lesel in MWe Nei for each day in the reporting inanth. Compute to the nearest whole rmgawatt.

19/771 u.

~

L OPERATING DATA REPORT 50-251 DOCKET NO.

DATE 2-15-84 COMPLETED 11Y N.W. Grant TELEPilONE (305) 552-3675 OPERATING STATUS Turkey Point #4 goces

l. Unit Name:

Unit #4 operated at "2. Reporting Period:

January. 1984 essentially full power ex-

3. Licensed Thennal Power (MWt):

2200 cept for an outage as dis-760

4. : Nameplate Rating (Gross MWe):

cussed in the Unit Shut-693

5. Design Electrical Rating (Net MWe':

down Report.

/00

6. Maximum Dependable Capacity (Gross MWe):

660

. 17. Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):

'10. Reasons For Restrictions,If Any:

This Month Yr to.Date Cimmla t. se

/

744 744 91 537 111 Hours In Reporting Period 729.1 729.1 65 36/./

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown llours 0

0' 166.6

14. Hours Generator On.Line -

723.6 723.6 63 191.7 0

0 31.2

. 15. Unit Reserve Shutdown 1(ours 1 591 097 1 591 097 133 337 838

. 16. Gross Thermal Energy Generated (MWII)

- 17. Gross Electrical Energy Generated (MWII) 518 370,_,

518 370 42 439 672 494 160 494 160 40-198 219

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 47_'l 47_3 69.0
20. Unit Availability Factor 97.3 97^.3 69.1
21. Unit Copacity Factor (Using MDC Net) 99.7 99.7 67.8 95.8 95.8 63.4

- 22. Unit Capacity Factor (Using DER Net) 23.' Unit Forced Outage Rate 2.7 2.7 4.4.

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Refueling,' March,1984,.2 months.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26.- Units In Test Status (Prior to Conimercial Operation):

Forecast Achined INITIA L CRITICA LITY

' INITIA L ELECTRICITY COMM ERCIA L OPER ATION (9/77I

_ _ _ _ ~

DOCKETNO. 50-251 UNIT SHUTDOWNS AND POWFR REDUCTIONS UNIT NAME Iurkey P01nt Unit #4 DATE'2-15-84 REPORT MONTH Janua rv, '1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 E

c

.5 g 3

yY3 Licensee

,Eg

{",,

Cause & Corrective No.

Date c-3=

i

.2 s &

Event 17 g3 Action to L

y:

jg=

Report a mO t-Prevent Recurrence g

d 01 840106 F

20.3 A-1 CB PU".PXX Unit removed from service to check RCP oil level and to perfonn secondary system maintenance.

I 2

3 4

T Forced Reason:

Method:

Exhibit G Instructions S Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data Il-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report ILER) File (NUREG-D R, p.:...., Ro.. Lii.,..

9OtheiEy;i..,

Gloi, E-Operator Training & License Eumination F Administrative 5

G Oper.stional I ror iFsplam) s _ t o a a,z z o w a..c/

Eshibit I - Same Source t's/77 )

Il-Ot her I E xplain)

SUFd4ARY OF OPERATING EXPERIENCE DOCKET NO.

50-251 UNIT Turkey Point' Unit #4 DATE February 15, 1984 COMPLETED BY N.W. Grant (305) 552-3675 TELEPHONE REPORT I40 NTH January,il984 Unit 4 operated at essentially fu'll power.

Major safety related maintenance activities included repairing leaking containment spray and charging pumps.

Inspections and-requirements of IB Bullentins and NUREG-0737 are continuing.

Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC 'for additional information.

4

AVERAGE DAILY UNil 20WER LEVEL DOCKETNO. 50-335 UNIT St. Lucie Unit #1 2-15-84 DATE COMPLETED BY t.W. Grant f

TELEPilONE (305) 552-3675 January, 1984 gg DAY AVERAGE DAILY POWER LEVEL DA(

AVER AGE DAILY POWER LEVEL IMWe-Net)

.(MWe-Neti 1

i; 2

13

~

3-39-4 20

-5 21 6

22

.7 23 8

24 9-

~

~

10 26 II 27 12 28

~

13 29 14 30 15 33 16 INSTRUCTIONS

- On this format. hst the average daily unit power leselin MWe Net for each day in the reporting month. Compute o the nearest whole rmgawart.

19/771

m 4

A OPERATING DATA REPORT 50-335 DOCKET NO. '7-15-84 DATE COMPLETED llY N.W. Grant TELEPilONE (30 0 M2-3675 OPERATING STATUS -

St. Lucie Unit #1 Notes

1. Unit Name:

' January, 1984

2. Reporting Period:

Unit #1 remained out of LicensedThermalPower(MWt):

2700 3

service for refueling and 890 scheduled maintenance.

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe). 830
6. Maximum Dependable Capacity (Gross MWe):

R67

7. Maximum Dependable Capacity (Net MWe):

R??

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

- 9. Power Level To Which Restricted,if Any (Net MWe):

- 10.~ Reasons For Restrictions. If Any:

This Month Yr to-Date Cumulative 744 744 62 352,1 111 Hours In Reporting Period 44 436.

12. ' Number Of Hours Reactor Was Critical 0

-0

13. Reactor' Reserve Shutdown Hours 0

0 205'.3

14. Hours Generator On-Line n

n 41 c;76_ p

' 15. Unit Rewrve Shutdown 1(ours.

O n

14.1

16. Gross Thermal Energy Generated (MWil) 0 0

108 667 938

- 17. Gross Electrical Energy Generated (MWH) 0

-2727 33 331 546 0

35 373 875

-2727

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 0

0 69.9

20. Unit Availability Fa: tor.

n n

7n_n 121. Unit Capacity Factor (Using MDC Net) -

0 0

67.8

22. Unit Capacity Factor (Using DER Net) 0 0

66.0

'?

.23. Unit' Forced Outage Rate 0

0 4.6

~

- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each):

25. If Shut Down At End Of Report Period.Est: mated Date of Startup:

Snring : -14R4

' 26. ' Units In Test Status (Prior o Commercial Operation):

Forecast Achined INITIA L CRITICALITY

' INITIA L ELECTRICITY COM.}1ERCIA L OPERATION W/77 )

gy 50-335 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME 5t. Lucie Unit #1 DATE 2-15-84 REPORT MONTH ' January, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675-e.

5 c

.5 g "h

jY5 Licensec 53, j%

Cause & Corrective No.

Date c-

~i E 5

.3 s 5 Event

??

o. ?

Action to S

j@

jgg Repori e iS C jC Prevent Recurrence 6

3 830226 S

744 C

4 RC FUELXX Unit #1 remained out of service for refueling and scheduled maintenance I

2 3

4 F: Forced Reason:

Method:

Exhibit G. Instructions h Ssheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C. Refueling 3 Automatic Scram.

Event Report (LER.s File (NUREG-D-Regularory Restriction SOther (Explam) 0161)

E Operator Trainmg & tacense Exammation F Administrative Y ~ O ' *"' ""'

5 G Operatomal I stor (Esplain)

4. /.o ao 44evca..cl Exhibit I Same Source (9/77)

Il-Ot her t Explain)

i g-',

SUMMARY

OF. OPERATING EXPEi IENCE 0-335 DOCKET'NO.

UNIT St. Lucie Unit 1 DATE February 15, 1984 COMPLETED BY fl.W. Grant TELEPHONE (305) 552-3675 n:

REPORT MONTH January. 1984

~

St. Lucie Unit I remained out of service for a refueling and maintenance outage.

'llajor safety related maintenance included repairing a 120-140 VDC battery charger.

Inspections' and requirements of IE Bulletin and flVRE6-0737 are continuing.

- Florida-Power & Light Company commitments for NUREG-0737 implementation are continuing.

Refer'to correspondence between FPL and NRC for additional information.

.In accordance with requirements cf NUREG-0737 Item II.K.3.3, there were no

. challenges ~ to.PORV or safety valves during the report month.

See correspondence between FPL and NRC for information concerning the thermal shield.

i

i AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-389 UNIT St. Lucie Unit #2 DATE 2-15-84 ant COMPLETED BY TEl,EPilONE (305) 552-3675 MONTH January. 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) -

-(MWe-Net )

819 820 1-I l.e 2

808 18 821 3'

820 441 39 4

821 20 5

820 2

177 820 802 6

22 7

R10 23 A1R 8

817 24 791 820 21 9

25 10 820 26 11 818 2'

OI7 12 28 818 243 13 29 34 819 728 30 15 W

31 767 16 821 INSTRUCTIONS On this formai. hst the average daily unit power leylin MWe Nei for each day in the reporting month. Compute to the nearest whole rmgawaii.

(9/771

OPERATING DATA REPORT DOCKET NO. 50-389 b"D4 DATE COMPLETED fly N.W. Grant TELEF110NE (305) 552-3675 OPERATING S TATUS l

St. Lucie Unit #2 Notes

_-1. Unit Name:

2. Reporting Period: Janua ry. 1984 Unit #2 operated at essen-2500 tially ful1 power exceat for

' 3. Licensed Thermal Power (MWt).

850 the outages discussed i n the

4. Nameplate Rating (Gross MWe):

804 unit shutdowns report.

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe).

832

7. Maximum Dependable Capacity (Net MWe):

786

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-to-Date Cmnulatise 44

11. Hours In Reporting Period 733.9 733.9 39bv.v
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 601.1 601.1 3731.5 0
15. Unit Reserve Shutdown 1(ours 5 -
16. Gross Thermal Energy Generated (MWil)
17. Gross Electrical Energy Generated (MWil) 496 700 496 700 3 039 920
18. Net Electrical Energy Generated (MWH) 465 892 465 892 2 863 478
19. Unit Service Factor 80.8 80.8 87.8 80.8 80.8 8/.6
20. Unit Availability Factor
  1. 9*#

' 21. Unit Capacity ector (Using MDC Net) r

22. Unit Capacity Factor (Using DER Net) 77.9 77.9 83.2
23. Unit Forced Outage Rate 15.8 15.8 ns

.24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast A chii sed INITIA L CRITICALITY INITIAL ELECTRICITY COMM ERCIAL OPERATION (9/77I

.Paga 1 cf 2 DOCKETNO. 50-389 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie Unit #2-DATE 2-15-84 COMPLETED BY N 1.f nrant REPORT MONTH Januarv.1984 TELEPHONE I7ngY gg?_gg7g

~b Licensee 5%

fe

.! E 3

hYi Cause & Correenive o

No.

Date g

3g ij jgy Event s'

a" Action to

$5 E

{* 5 g Report =

'N U Prevent Recurrence 6

01 840119 F

6.7 A

3 HA GENERA Indication of generator ground; mon-itoring instrument malfunction.

02 840119 S

30.1 H

4 ZZ ZZZZZZ Previous outages extended for NRC required snubber inspection.

03 840121 F

0.0 H

5 HJ ZZZZZZ High steam generator chloride level caused power reduction.

04 840125 F

0.0 A

5 HF XXXXXX Intake cooling water traveling screen malfunction, due to large volume of jelleyfish caused power reduct. ion.

I I

2 3

4 F: Forced Reason:

Method:

Exhibit G. Instructions S S6heduled A Equipment Failure (Explain) 1 Manual for Preparation of Data fl-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Esent Report (LER) File (NUREG-D Regulatory Restriction 9-Other ( Explain) 0161) li-Operator Training & Ucense Examination F-AJ nsnistratise 5

G-Operatumal Errut (F splam) s. f.o ao aso w.i..c#

Exlubit i. Same Source (9/77)

Il-Oiher ( E xplain)

Page'2 cf 2 DOCKETNO. 50-389 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie Unit #2 DATE 2-15-84 COMPLETED BY N.W. Grant REPORT MOND{ January. 1984 f

HLEPHONE (305) 552-3675

.I I

l

-l J

l 1

=

.! ?

Y

).E k Licensec

,E v,,

fi Cause & Corrective 3

No Date i

~g

,g g &

Event s'

c. 'E.

Action to Report =

iK V

!O Present Recurrence

$3 E

3 5 :{

v C

/

j,05 840129 F

6.2 b

3

~ 2' 11J ZZZZZZ Operator error; manual control of

~

steam generator level.

i

)

,g i

r

/:

y

.f h

i s

+

,~

}

)

)

i

~ 3 4

i 2

f: Forced Reason:

Method-Exhibit C -Instructions i Scheduled A Equipment Failure (Explain) 1-Manual for Preparatiun of Data B Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 9-01her i Explain) 0161) 1 -Operator Training & License Examination F-Administrative M~ O'*"*""#'

5 G-Operational lis tor ( F xplain a 4- _ to ao aso%,..et Exhibit 1 Same Source (9/77) 110ther (iixplain) i 3

[

SUMMARY

OF OPERATING EXPER.TENC E DOCKET NO.

50-389 UNIT St. Luci6 Unit #2 DATE 2-15-84 COMPLETED BY N.W. Grant (305) 552-3675 TELEPHONE

~ REPORT MONTH January, 1984 Unit 2 operated at essentially full power except for an outage from

-January 19 to January 21 due to an electric generator ground and one from January 25 to January 29.

Major safety related maintenance included various modifications made to

.the Qualified Safety Parameter Display System.

The 10 month safety-related snubber inspection was conducted.

Inspections and requirements of IE Bullentins and NUREG-0737 are continuing.

Florida Power & Light _ Company Commitments for NUREG-0737 implementation are' continuing. - Refer ~to correspondence between FPL and NRC for additional infonnation.

In' accordance with requirements of Technical Specification 6.9.1.6, there

- were no challenges ~ to PORV or safety. valves during the report month.

)

v

.'9

+

FLORIDA POWER & LIGHT COMPANY February 15, 1984 PNS-LI-84-53 f

I '

r Director, Office of Resource Management U.S. Nuclear. Regulatory Comission Washington, D.C.

20555

Dear Sir:

, Attached are the January 1984 Operating Status Reports 'and Operating Sumary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No.- 1 and 2.

~ Very truly yours, I, ;

$]Oc

  1. J.W. Wil ' s, Jr.

Vice Pres'ident Nuclear Energy D?partment

( ;_

'iWW/fiWG/cas

. c.

Attachment ' <

+

cc:

J.P. O'Reilly, Region II- ;; ~

d*

a

N n..n, I

m

_f

/

PEOPLE.. SERVING PEOPLE