Amend 159 to License DPR-35,removing TS Requirement, Instrumentation That Initiates Control Rod Blocks to Have Scram Discharge Instrument Volume-Scram Trip Bypassed Operable in Run & Startup Modes
ML20080T716
Person / Time
Site: Pilgrim
Issue date: 03/08/1995
From: Marsh L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20080T720 List:
References
NUDOCS 9503140084
Download: ML20080T716 (5)


Text

{{#Wiki_filter:, a"8069 + UNITED STATES n' .fm j NUCLEAR REGULATORY COMMISSION -{ t . WASHINGTON, D.C. 20555 4001 s.... / o BOSTON EDISON COMPANY 'l DOCKET NO. 50-293 PILGRIN NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.159 License No. DPR 1 1. The Nuclear Regulatory Commission (the Commission or the NRC) has found' .that: ~ I A. The. application for amendment filed by the Boston E'ison Company (the d licensee) dated November 22, 1994 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations; 'B. The facility will operate.in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. ' There is reasonable assurance: (1) that the activities authorized'by. this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of.this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all: applicable requirements have i been satisfied. 2. Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment. l l 9503140084 950308 PDR ADOCK 05000293 P PDR i ..-..a

b ~ l, a: 3. This license amendment is effective as of its date of issuance and i shall be implemented within 30 days. FOR THE NUCLEAR REGULATORY COMMISSION l k Ledyard B. Marsh, Director l Project Directorate I-I Division of Reactor Projects - I/II i Office of Nuclear Reactor Regulation j Attachment. Changes to the Technical Specifications Date of Issuance: March 8, 1995 l I i l f ? F P I l

..g, i i ATTACHMENT TO LICENSE AMENDMENT NO. 159 [ FACILITY OPERATING LICENSE NO. DPR-35 DOCKET NO. 50-293 ? .i Replace.the.following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and i contain vertical Tines indicating the area of change. i l Remove Insert .q 3/4.2-20 3/4.2 j 3/4.2-35 3/4.2-35 l t !a i i i f i i a ~

.... ~ ..y FNFS TABLR 3.2.C.1 (Cont) INSTRUMENTATION THAT INITIATES ROD RIACKS Operable Instrument Channels per Trio Function-Required Trio Function Minimum 1 Available Operational Conditions Notes SRM Detector not in 3 4 Startup/ Refuel, except trip is bypassed '(1) Stcrtup Position when SRM count rate is 2 100 counts /second or IRMs on Range 3 or above. (4) SRM Downscale 3 4 Startup/ Refuel,.except trip is bypassed (1) when IRMs on Ran6e 3 or aboye (4) SRM Upscale 3 4 Startup/ Refuel, except trip is by-(1) passed when the IRM range switches are on Range 8 or above (4) SRM Inoperative 3 4 Startup/ Refuel, except trip is by-(1) ' passed when the IRM range switches are on Range 8 or above (4) Scram Discharge 2 2 .Run/Startup/ Refuel-(3) Instrument Volume Water Laval - High Scram Discharge 1 1 Refuel / Shutdown (3)' l Inatrument Volune-Seram Trip Bypassed Amendment No. 138. 147,159 3/4'2-20 2 ___. _. _ _.,_ _.. _ - _ _ :_

. ~ _... - - -. l PNPS TABLE 4.2.C MINIMUM TEST AND CALIBRATION FamaU"'GY FOR CONTROL ROD BL* ACTUATION Inntrument Channel Instrument Functional Calibration Instrument Check ' f~ Test ~ APRM - Downscale Once/3 Months Once/3 Months Once/ Day. APRM - Upscale Once/3 Months Once/3 Months Once/ Day APRM - Inoperative Once/3 Months Not Applicable Once/ Day. IRM - Upscale (2) (3) Startup or Control Shutdown (2) IRM - Downscale (2) (3) Startup or Control Shutdown (2) IRM - Inoperative (2) (3) Not Applicable (2): RBM - Upscale Once/3 Months Once/6 Months Once/ Day RBM - Downscale Once/3 Months Once/6 Months Once/ Day RBM - Inoperative Once/3 Months Not Applicable Once/ Day SRM - Upscale (2) (3) Startup or Control. Shutdown (2) SRM - Inoperative (2) (3) Not Applicable (2) SRM - Detector Not in Startup Position (2) (3). Not Applicable-(2) SRM - Downscale (2) (3) Startup or Control Shutdown (2) IRM - Detector Not in Startup Position (2) (3) Not Applicable (2) Scram Discharge Instrument Volume Once/3 Months Refuel Not Applicable ~ Water Level-High i Scram Discharge Instrument Once/ Operating Cycle Not Applicable Not Applicable l Volume-Scram Trip Bypassed i Rscirculation Flow Converter Not Applicable Once/ Operating Cycle Once/ Day Racirculation Flow Converter-Upscale Once/3 Months Once/3 Months Once/ Day Rscirculation Flow Converter-Inoperative Once/3 Months Not Applicable Once/ Day Racirculation Flow Converter-Comparator Once/3 Months Once/3 Months Once/ Day-Off Limits Rscirculation Flow Process Instruments Not Applicable Once/ Operating Cycle-Once/ Day-lozic System Functional Test (4) (6) 1 System Logic Check Once/ Operating Cycle 65 -119,-139 -147 *151, 159 3/4.2-35 Amendment No. 3 7 t Il}}