ML20080R926

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-56 Re Discrepancies W/Msivs Supplied by Anchor-Darling.Initially Reported on 830808.Next Rept Anticipated by 840316
ML20080R926
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/14/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28862-BSK, DER-83-26, NUDOCS 8402280456
Download: ML20080R926 (1)


Text

,5 a

/6 Zy 0~c

,f 6

- Arizona Public Service Company I

P.O. Box 21666 + PHOENIX, ARIZONA 85036 February 14, 1984 ANPP-28862-BSK/TRB U.'S. Nuclear Regulatory Commission y

Region V E

9, 550 Creekside Oaks Office Park Si N

1450 Maria Lane -. Suite 210 "T4 Walnut Creek, CA 94596-5368 7

3

^

o>

Attention: Mr. T. W. Bishop, Director y

Division of Resident n

Reactor Projects and Engineering Programs

Subject:

Tir? Extension For Report - DER 83-56 A 50.55(e) Potentittlly Reportable Deficiency Relating To Discrepancies with Main Steam Isolation Valves by Anchor-Darling.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and R. Tucker on August 8, 1983.

(B) ANPP-27606 dated, August 22, 1983 (Interim Report)

(C) ANPP-28319 dated, November 30, 1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B),

and a time extension was requested by reference (C). At that time, it was estimated that a Final Report would be available by February 21,-1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by March 16,1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

\\

1 D

Otu_

m

,E.

E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db cc: ' See Page Two

""'l9 8402280456 840214 PDR ADOCK 05000528 S-

.PDR

r e.

.- s.

-u Mr;;T. W. Bishop DER 83-56' Page Two ec:

Richard DeYoung, Director Office of Inspection and Enforcement U.-S.-Nuclear Regulatory Commission Washington, D.-C. 20555 T.'G. Woods, Jr.

W.-E. Ide D. B. Fasnacht

.A.

C. Rogers B. S. Kaplan J. Vorees J. R.'Bynum.

[

P. P. Klute A.. C. - Cehr W. J. Stubblefield W. G. Bingham R. L. Patterson Ri W. Welcher H. D. Foster D. R. Hawkinson

. L. E. - Vorderbrueggen

13. A.'Fiorelli S. R. Frost J. Self D. Canady Record s. Center Institute of Nuclear Power Operations 1100 circle'75 Parkway, Suite 1500 Atlanta, GA 30339.

4 A

3

.-