Forwards Responses to Items Requiring Resolution Resulting from NRC Review of Radiological Emergency Response Preparedness Plan Published in Suppl 3 of NUREG-0798.Items Reviewed W/F Kantor of Nrc,In 840201 Telcon
ML20080Q942
Person / Time
Site: Fermi 
Issue date: 02/23/1984
From: Jens W
DETROIT EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0798, RTR-NUREG-798 EF2-67-132, NUDOCS 8402270243
Download: ML20080Q942 (28)


Text

O. yne H. Jero N cle atons Detroit Edison EsEF5-February 23, 1984 EF2 - 67,132 Director of Nuclear Reactor Regulation Attention:

Mr. B. J. Youngblood, Chief Licensing Branch No. 1

.Divicion of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Youngblood:

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

Response to Items Requiring Resolution Evaluation of Emergency Plan Supplement uo. 3, NUREG-0798, January, 1983 Attached are Detroit Edison's responses to the items requiring resolution resulting from NRC review of the Fermi 2 Radiological Emergency Response Preparedness (RERP) Plan published in Supplement 3, NUREG-0798.

All items were reviewed with Mr. Falk Kantor of your Emergency Preparedness Branch in a telephone conference on February 1, 1984.

Only those requiring additional information or confirmation as per the phone conference are included in the. attachment.

Each item is discussed in the context to the RERP Plan' review as outlined in Supplement 3.

It is our understanding that with this additional information, Supple-ment 4,.NUREG-0798 can be issued.

Should you have any questions, please call Mr. O. Keener Earle, (313) 586-4211.

Sincerely, cc:

Mr. P. M.

Byron Mr. F. Kantor Mr. M.

D. Lynch B402270243 040223 PDR ADOCK 05000341 1

8 i

DETROIT EDISON'S RESPONSES TO THE ITEMS REQUIRING RESOLUTION EVALUATION OF THE EMERGENCY PLAN SAFETY EVALUATION REPORT RELATED TO THE OPERATION OF ENRICO FERMI ATOMIC POWER PLANT, UNIT 2 NUREG-0798 - SUPPLEMENT NO. 2 JANUARY 1983 t

February 1984

Page 1 NUREG-0798 - SUPPLEMENT N0. 3 EVALUATION OF THE EMERGENCY PLAN RESPONSES TO-ITEMS REQUIRING RESOLUTION 13.3.2.1 ASSIGNMENT OF RESPONSIBILITY (ORGANIZATION CONTROL) 1 Item (s) Requiring Resolution (1)

Identify the agencies with emergency plan responsibilities in the ingestion exposure pathway (50-mi) emergency plan-ning zone (EPZ). Provide a map that clearly illustrates the States, provinces, cities, etc., within the ingestion exposure EPZ.

(2) -Identify the agency.or agencies responsible for notifying Canadian officials of an emergency at Fermi 2, and describe the arrangements made to notify Canadian officials.

Resolution

'(1)

The Fermi 2 Radiological Emergency Response Preparedness (RERP)

Plan, Revision 3 will~ reference the State of Ohio, together with the State of Michigan and Province of Ontario, Canada.

(2)

Item closed.

r Page 2 13.3.2.2 ONSITE EMERGENCY ORGANIZATION Item Requiring Resolution Provide information on shift staffing augmentation capability before an operating license is issued, and if significant differences from the staffing objectives of Table 8-1 of NUREG-0654 exist, provide justification for the differences, including a study of response times by emergency functions and possible compensating measures such as enhanced shift capability.

Resolution

-Item Closed.

The Fermi 2 RERP Plan, Revision 3, will contain a revised Table B-1.

i i

Page 3 13.3.2.4 EMERGENCY CLASSIFICATION Items Requiring Resolution (1)

Provide the specific instrument readings and other indi-cators that are used as emergency action levels (EALs) in the emergency classification scheme. Correct the headings in Table 0-1 of the emergency plan.

(2)

Correlate the containment (drywell) monitor and other key instrument readings, if applicable, to a range of degraded core conditions. Selected values from this analysis along with other indicators of core and containment conditions should be included in the EALs and used to initiate protective actions in accordance with the guidance in NUREG-0654, Appendix 1 for general emergencies.

(3)

Develop the methodology to classify serious events in case the containment monitor and other key instrumentation are off scale or inoperable.

(4)

Revise the emergency plan and implementing procedures to indicate that offsite authorities will be notified within 15 minutes after the applicant declares an emergency.

Resolution (1)

Table D-1 was revised in the Fermi 2 RERP Plan, Revision 2 to reflect the Emergency Action Levels (EALs) presented in RERP Plan Implementing Procedure EP-101.

Calculations are currently in progress, to determine monitor readings which will be equivalent to EAL Dost Limitations at the site boundary for site area and general emergency classifications.

(These monitor readings will be incorporated into the next revision of EP-101 prior to fuel load.)

(2)

Use of Containment High Range Radiation Monitor to Assess Core Damage

Page 4 (2) USE OF CHRRM's TO ASSESS CORE DAMA_G_E E

3 As noted in the Fenni 2 FSAR, Section H.II.F.1.3., Detroit Edison is installing redundant containment radiation monitoring channels to meet the requirements of NUREG-0737.

These monitors are fre-quently referred to as Containment High Range Radiation Monitors (CHRRM's). Radiation levels resulting from gamma-ray emitting radionuclides in the vicinity of the detectors are indicated and recorded in the main control room and directly transferred to the Emergency Response Information System (ERIS).

As shown in FSAR figures H.II.F.1-1, 2 and 3, these detectors are located in the bulbous portion of the drywell, at elevation 605, and approximately 7' from the react v shield. The CHRRM location is shown more clearly in the at. ached sketch.

During normal operations these detectors will read approximately 25 R/hr due to nitrogen-16 in nearby steam and reactor water recirculation piping.

Under accident conditions, the CHRRM's may be used as an indicator of reactor ' ore damage. A release of lodines and/ar noble gases to the drywell will result in a uniform mixture of these gases in the drywell. The radiation field associated with these gases will be a measure of the airborne radioactivity released to the drywell.

A correlation may be made with the CHRRM reading and the amount of radioactivity released to the drywell that will become airborne.

Thus, a correlation can be made for accidents ranging from a release of all coolant and core damage to a classic Regulatory Guide 1.3 Loss-of-Coolant-Accident (LOCA) which assumes the release of 100% of all noble gases and 25% of the lodines to the drywell volume. This set of curves was provided as Enclosure 2 of the Fermi 2 RERP Plan Implementing Procedure EP-540 (Enclosed).

It is doubtful that the CHRRM will provide any meaningful signal for accidents such as core melts which are more serious than RG 1.3. LOCA's. To get a radiation field higher than that for 100% nobles and 25% lodines, one must assume the next most volatile class of nuclides, cesium, is heated to the point where it becomes uniformly mixed in the drywell air space. This is unlikely.

In the event of a core melt, we believe the remaining nuclides would remain within the reactor pedestal and shield wall (recall, the CHRRMs are outside that wall), or in the suppression pool water and not appreciably affect the monitor reading above that already seen due to the surrounding cloud of noble gases and radiciodines. Recall again that in the TMI-2 accident, core dam ge.was sufficient to release more than 50% of the noble gases to the containment, but the airborn iodine fraction was significantly less than 1%.

Page 5 Values gl'/en in the curves of Enclosure 2 of EP-540 were obtained as follows. The dose rate at the CHRRM location due to 100% of the core inventory of noble gases uniformly distributgdinthedrywellvolumewascalculatedtobe 1.40 x 10 R/hr; the dose rate due to 2% of the lodines 4

similarly distributed was found to be 7.55 x 10 R/hr.

From these values, the dose rate due to any postulated fraction or combination of releases may be calculated. As an example, the enclosed table has been constructed. This information will be included in a procedure.

O F

Page 6

. ASSESSMENT OF CORE DAMAGES BASED ON CHRRM READING, RAD /HR Airborne Release, Percentage of Inveltory CHRRM Reading, Accident Description Nobles Iodines R/hr 1.

Normal operating environment M 25-30 t

in drywell 6

2.

Regulatory Guide 1.3 LOCA; 100 25 2.3x10 sufficient core temperature to drive out all noble gases from fuel pellets 6

3.

Fermi 2 upper bound 100 2

1.5x10 accident 5

4.

Gap release, 100%*

10 10 5.2x10 4

5. ' Environmental report LOCA 0.2 0.2 1.0x10

'(all ECCS working) 6 '. - Release of all reactor coolant 0.01

  • Since the curve is linear any percentage less than 100% would be a direct multiplier.

EP-540 Rev. O Page 7 ESTlMATE OF ACTIVITY IN CONTAINMENT CONTAINHENT HIGH kANGE RADIATION HONITOR FERMI - 2 (10 MIN POST-SilVTDOWN)

$ 0

i it!*!l i

l i I l ill!

lA !!!!!;.!}

,f.

., y 7

=, er s 3 7 e w

2

.w r,r. -.., e o

r

, mm._

  1. ~

1,

y d.

-i?

  • 'T t

. 5 #(( a T

1 G'E"

"6,. '

g

s u -

- e=

U i Ei vis s q {.

a-a.C ri a

+

u ajr,-M.

! Pr m_sF n: :u =. am

=

.=.s.

fi 7

~

3 y

[

,P j] ry-7 i

56-

.5: 2:5-

? E

~U 1R GM

' /',d5 i.

0

. L, 's n

' ;-/j $fi id.EU 9! E

- 5

~

L5-L if N: NkI?

~j-L[ W i

- T.1 c-

=:.2 ?

y

'- i s

_2 ;: g g

r h

1. 0_8 M

i

-/

w

'
U g-

, i m

e i 1 1,

.r g

l /

x, 'r-I-.-

m.x f

j L

.Cf.F:-*JC5

=

1 i

i i

G J

.' 9 en r

ne-ru

& -: e

v. r t:+

~ ~

= =E i t g r

- !W-=?

t =r =C s 1

.~

. m.

r-0F =

y r a g 3J :

' 'P

' ' r

+

I

. s:Fn. m o

n

. w %:u.J f'L i

.- = '..'h i

.. t:

=- 2

+. /

n

=

==

e

=-.

-- 3

-:t :::-

-ihi! 3E y/

j F5 1-

.m E

g'".TI-GQ/'.

J,17

- E = '

5 EE w._

p---.

.p 7, N

.j x

.: #gCl

...4-----

i L

g

=

.2 1

1 '

nw.r: o 4 -a,

- m we_

g d l m

+

2--

M

Jyr i : sas:

- - Niin g-p.s p

  • 1 2_;

g c

~

g' p {' i i

51 s h g

,i! h g

'l 'l j

1 l lIl i i

.a i liii ni g i j d i

i I

k E

=

i i -i l'

L!

!i g g

B i Pi l'

l

) ! !!i M l d I

llll

,~

m:--

=

r-q i G

' E, [. "t..

~ :MM :-a z- =

n :

g x t: hi:.[.- i

. U.. t-T,'

2 6 ~+-

.-.- 7 le-l 4

s go y at 10 le Radiation Level in Containment (Rad /hr) t t

Curve "a" represents estimated activity levels in the containment following i

releases in which the ratio of "% noble gases released from the core" to "%*

l iodines released from the core" is equal to 4.

Curve "b" represents esti-mated activity levels in the containment following releases in which the l

above mentioned ratio is equal to 1.

Specifically, the following points are plotted:

t 1.

100% noble gases, 25% iodines released 2.

10% noble gases, 10% iodines released 3.

0.2% noble gases, 0.2% iodines released Coolant activitiy is equal to 19 curies. If airborne in the containment, the radiation level would be 0.01 I%d/hr, too low to plot on this graph.

Page 1 of 1

EF-2-FSAR Page 8 "El;?'-,.. &

1

. { ll" j,l I

,L

]i

/

j

i. i

. x...... 5 l

3..

,#i t

T.'t.. T h..

~

3 y '~~ "Q,, 2 y A

m..

h_

%F lt i

FF'.L.c.3...... '.

s 1-1 r"T'".F 1,; i

..:.,aa- ?

.:; :r::::

i: i-

~ n?"'

l

. f l::=l q

= ra= :,

i,

.a s.... 3 O

3*--

1; im St.!FL EL 684'- 6* I

....._,_5,..

c.

-n

. i.

I

.=:

~..

. g '.:.e,m h,

I.

ih,,,'

.,,,7-

. I d

..e i

f53. h.. A da

[k h.

a FL EL 650s r

m

.: -- L..

. g

'c;. ~.

"1*b m-

_ = -

N..,._...,,,

T_

.d':;,"

,i-'

m W.

r,'..c=r.

r

. r r

A.

l -i.-

4 3.,,t. a. su.c

,a

_1

~,. J g k.,.

.. ~

- % g,'

'r,'

2

-m-i i

... c_

I 1 -- y.

4=~

l l,

.....j

'i.m

4..... +:."..

...Lm a

m rt.

u e,y. -

i

.1: v m

n c.=:..

a!

. t'~~~.

U CHRRM Monitor 6^ -

" V" d..

M HRRM Monitor Plare). Out.of.D *i a

(Shown 7.%5 (Shown Out of Plane) r i,' ""'a*"

.1

~. 4p; f.. y. ;

q. ~

W FL..

EL. 581 0

.-]....

..; (-

2,.2..-

m

)

g

.w

-:.1 W. *.. -

m ace,at e D _u.. _..: a.,.:.=,*...Wq.ag

.. -,.~y.o. Leo

. /

g3

. - W.

_..,g.--

.g...e 4

SUB4AS u*f EL $40'-O 1

. +,.

., wr v v

  • !r.

..m II 1

t ENRICO FERMI ATOMIC POWER PLANT UNIT 2 FINAL SAFETY ANALYSIS REPORT L

FIGURE 1.2-20 GENERAL ARRANGEMENT DRAWING, h

TRANSVERSE SECTION y

i AMENDMENT 50 - AUGUST 1983 h

Page 9 (3) The methodology has been developed to obtain infonnation necessary to provide an offsite dose assessment should key monitoring instrumentation be offscale or inoperable.

The key instruments are the Containment High Range Radiation Monitor (CHRRM) in the drywell and the Eberline SPING-4 and the AXMs in the SGTS. The methodology as described below will be developed as a procedure.

CHRRM A location in the Reactor Building will be selected where a measurement of the activity in the drywell can be assessed through the biological shield using a survey meter reading and appropriate conversion factors.

OR Using tne Post Accident Sampling System, a sample of the drywell atmosphere will be obtained, a dose rate measured using an appropriate survey meter, and the dose rate converted to a CHRRM monitor reading (R/hr) using a graph developed for the purpose.

AXM Using the existing AXM sample taps, a sample of the SGTS effluent will be cbtained, a dose rate measured using an appropriate survey meter, and an. estimate of a i/cc being released through SGTS will be determined c

by using; graphs developed for the purpose.

(4)

Item Closed.

Page 10 g

13.3.2.5 NOTIFICATION METHODS AND PROCEDURES Item (s) Requiring Resolution (1) Develop a notification form for initial messages to offsite response organizations and revise Emergency Plan Implementing Procedure EP-290,

" Emergency Notifications," to ensure that noti-fications will be made within the 15-minute period specified in 10 CFR 50, Appendix E,Section IV.D.3.

(2) Provide a commitment to have a. prompt alert and notification system, which is.in accordance with the guidance of NUREG-0654, Appendix 3, installed and operational by fuel load, or develop interim compensatory measures to provide emergency instruc-tions to the public within the plume exposure pathway EPZ. Revise the emergency plan to reflect the deletion of mobile sirens from the alert and notification system.

(3) Coordinate planning efforts with offsite authorities to ensure the administrative capability will exist to alert the public and make prompt protective action decisions for rapidly developing emergency situations especially during non-normal working hours.

Resolution (1) A generic State of Michigan notification form was developed for notification of offsite response organizations that will insure the initial notification is made within 15 minui.?s (RERP Plan Implementing Procedure EP-290). This procedure will be revised to describe those portions of the form that will be used for initial and follow-up messages.

(2) A total of 31 sirens has been installed in Wayne and Monroe Counties that will be operational by fuel load.

All's!rens have been silent tested at the siren site and found to be operational. All that remains to make the integrated system operational is installation of the control panel at the Monroe County Sheriff's Joint Communication Center. A draft of the Prompt Notification System Design Report has been completed and is under review prior to submittal to FEMA.

The Fermi RERP Plan was revised (Revision 2, September 1983) to include the PNS and delete the mobile sirens previously discussed.

l l

.~.

Page-11 (3) Detroit Edison is continuing to coordinate planning efforts with local offsite authorities to ensure prompt notification of the general public in a rapidly moving emergency situation.

The Michigan Emergency Preparedness Plan, Annex B, Warning, page 87 (dated 6/83) refers to the local emergency operations plans for prompt notification.

The draft Monroe County Plan (A;1pendix 1, Nuclear Facility Procedures to the Monroe County Operations Plan) in Section V.A.1 of the Basic Plan (page BP-11),

the Chairperson of the Monroe County Board of Commission-ers has the immediate responsibility for implementing the Monroe County Plan. The decision-making responsi-

'bility regarding protective actions is stated Section V.4,

-(page A-1-8) of Appendix 1, Direction and Control Annex.

Detroit Edison has, via letter, requested that more explicit information be provided in the Monroe County Plan concerning the responsibility for prompt decision-making and public notification during a rapidly moving event.

It is anticipated this information will be included in the Plan during the next several weeks.

t

Page 12 13.3.2.7 Pl[BLICINFORMATION Item Requiring Resolution, Submit draft public information brochures for NRC and FEMA review before fuel loading and commit to distribute the brochures to the public before operation above 5% of rated power.

Resolution Item closed Detroit Edison submitted copies of the information brochure distributed to the general public prior to FERMEX '82 at the time SER Supplement 3 was being written. The brochure will be redistributed prior to FERMEX '84 to be held in June 1984.

Page 13 13.3.2.8 EMERGENCY FACILITIES AND EQUIPMENT Items Requiring Rasolution (1)

Provide a commitment to establish a backup emergency operations facility in accordance with regulatory guidance or justify the absence of this facility.

(2)

Provide a commitment that the permanent emergency response facilities will be operational before fuel loading or that adequate interim facilities and eauipment will be in place.

(3)

Provide the short-term meteorological study concerning lake-breeze effect on plume transport, and revise the meteorological model used to determine offsite dose projections if the effect is significant.

Resolution (1)

Item Closed.

The backup E0F location was approved by the

' Commissioners as stated in NRC letter Eisenhut to Jens dated January 31, 1984.

(2)

Item Closed.

(3)

The short-term meteorological study concerning lake-breeze effect was completed in October 1983.

In March 1984, Detroit Edison will submit a report discussing the preliminary analysis and results of the study and an implementation schedule for changes to the meteorological and dose assessment models if the effect is determined to be significant.

m

Page 14 13.3.2.10 PROTECTIVE RESPONSE

?tems Requiring Resolution (1) Develop predetermined protective action recommendations in accordance with the guidance of Appendix 1 to NUREG-0654 and incorporation of these recommendations in the emergency plan and procedures.

(2) Revise the evacuation analysis to include an enumeration of the special facility population on an institution-by-institution basis, reduction in road capacity caused by adverse weather, and coordination of the study with local authorities.

Resolution (1)

Item Closed.

(2)

Item Closed.

RERP Plan Implementing Procedure EP-545-includes maps of the locations of schools, recreation areas, institutions, and dairies. Also included is a table showing evacuation times for special segments of the public under normal and adverse weather conditions.

I L

e F

Page 15 13.3.2.12 MEDICAL AND PUBLIC HEALTH SUPPORT Items Requiring Resolution Specify the availability and arrangements made for backup medical facilities for the treatment.of individuals involved in radiological accidents.

Resolution Negotiations are underway with Mercy Memorial Hospital, Monroe,-Michigan,as a backup medical facility. This

. information will be in Revision 3 of the Fermi 2 RERP Plan.

l t

\\

. + -

,,. ~ -

,,-.r......

,..-.m...

.,._--.m_

y--c_m..-.m.--

..-~_,w

Page 16 ADDITIONAL INFORMATION/ FEMA CONCERNS (1)

Training Offsite Emergency Response Organizations Detroit Edison, the Emergency Management Division of the Michigan State Police, and the local Counties have developed a four-part training program that is presented to the local offsite Emergency Response Organizations annually. The program consists of the four parts listed below:

Part 1: Basics of Radiation and Plant Operations presented by Detroit Edison.

Part 2: Biological Effects and Detection of Radiation presented by the Radiological Health Services Division, Public Health Department.

Part 3: Radiological Emergency Response Plans, Organization and Procedures p*esented by Emergency Management Division, Michigan State Police.

Part 4: County Radiological Emergency Response Plan presented by a County OCP representative.

This training program will be described briefly in Revision 3 to the RERP~ Plan.

Attached is an outline and.more detailed.information regarding the program.

In addition to the above training, Detroit Edison will hold, on an annual basis, a -seminar for the offsite emergency response decision-makers covering Emergency Action Levels, dose assessment, meteorology, and protective action recommendations. The first such seminar will precede FERMEX '84.

(2)

Prompt Protective Actions by Local Offsite Response Organizations Refer to~ Resolution, Item 3, Section 13.3.2.5.

(3)

Status of County Plans The Wayne County and Brownstown Township Plans have been revised to incorporate interim FEMA findings, have been signed by the required County Officials, and are ready for submittal to FEMA.

A draft of the revised Monroe County Plan has been reviewed by Detroit Edison and the State Police. The Plan was presented to the County Board of. Commissioners on February 14 for acceptance as a

" working document", at which time they authorized sending the document.to FEMA Region V for " informal" review.

Upon approval of the Monroe County Plan, the three plans, together

'with the revised Michigan Emergency Preparedness Plan, will be submitted to FEMA for final review.

o GLTATE Ol* MICHIGAN EMERGCNCY M AN AGEMEfff ntVISION

,d' s.ow oe Lc v e.a.

JAMES J. Dt. ant.H ARD, GOVCHNOH d'u'[y[,"[cwI[ r "

n DEPARTMENT OF STATE POLICE

'"a"'""""-""

COI., GCF, AS.D t HOUGH. OlHIICTOH January 31, 1984 Mr. Philip Scheuerman Planner / Trainer Monroe City-County office of Civil Preparednenn 106 East First Street Honroe, Michigan 48161

Dear Mr. Scheuerman:

This letter is in response to your request for more information on the rad 1o-logical emergency preparednenn (RI:P) training program. 'As you are aware, the Emergency Management Division (EMD) is coordinating the provisten of state and utility resources to the counties to assist them in providing training as required by N!! REG-0654. Thin training program is an attempt to effective.ly utilize the resources of each participant, provide coordination of ef fort s, and to ennure a quality training program wit h continuity f rom year to year.

- One of the key points of the program is the definition of responsibilities and abilities.

Each Icvel of government has the responsibility to train it n workern so t hey are able to renpond to a nuclear accident. Consequently the four part training program was developed to ensure this responsibility was met.

Under this program, each entity covers the arcan that they are responsthic for.

That.i s, state covern state functions, utility covers utility functions, and county covers county functions.

This delineation of responsibilities supports j

the same responnihilities found in the plans.

The major points of the training support program are presented below. This is an l

elaboration of our October 6, 1983, letter:

1.

NLIREG-0654 requires that all emergency workers be provided with t. raining.

2.

These areas are plant operat. ions and facilities, baele nuclear physics, biological effects of radiation, radiological emergency preparedness at l

the state and local level, support organizations' responnihilities and procedures, and some specialized training as needed.

3.

The.0ctober 6, 1933, letter contained an outline of t.he training program as provided by the state.

1' i

f t

L_

Mr. Philip Scheuerman Page Two January 31, 1984 The Atomic Safety and Licensing Board has reviewed and approved this 4.

program during the fuci pool hearings at Big Rock Point.

The training of county / local personnel is a county responsibility under 5.

the county emergency operations plan.

The EMD will assist the county in the training by providing instructors 6.

to cover parts I, II, and III of the program.

The EMD will assist the county in developing its presentation under part 7.

IV of the program, but the presentation of this mateeJal in a county responsibility.

The EMD will support the county in a " train the trainer" type program.

8.

The training program is aimed at all of the emergency workers who would be 9.

These workers fall into involved in a response to an incidert at Fermi 2.

those who would be within the primary emergency two general categories:

planning zone or who would be assigned to decontamination / reception facilities; and those who would have responsibilities outside the primary emergency These workers are identified in the county emergency planning zone.

Therefore, one of the first steps in the operations plan, Appendix 1.

training program is for the county to identify all of the agencies / depart-ments and the number of persons in each who would be involved in emergency The October 6,1983, letter included a list of,these agencies /

departments contained in NUREG. The county may have additional agencien renponse.

' involved.

This includes One of the key groups to be trained are the EOC personnel.

all agency / department heads and their alternative involved in EOC operations,

- 10.

Our experience in other countics has shown and communications personnel.

that this group is one of the easiest to train because they are command personnel, in contact with each other on a regular basis, are us The area where they need the most information is in ECC responsibilities.

communications / message flow, and this area can be covered easily in the training program. These peopic know tin.ir jobs; the program junt pulla it i

l-all together for them.

Similarly, most emergency workers also know what to do in an emergency; be l-11.

Their function does not vary greatly from L

it nuclear or non-nuclear.

The four part program provides them what their non-nuclear actions arc.

l-The most with the information they need for radiological emergencies.

ion common concerns are notification procedures, functions, and radiat This is rather straight forward information exposure control / dosimetry.

which has been covered very well in a one hour presentation.

l v

w w

=

--4

- - - - ~.

---+--e-

Hr. Philip Scheuerman Page Three January 31, 1984 12.

In the part IV presentation, the county emergency services coordinator covers county notification procedures, EOC operations, general communications, coordination of resources, public information, and dosimetry. The specific annex officers then cover their annexes' functions and responsibilities.

It has been our experience in other counties that the dif ferences in functions and procedures for emergency workers from their daily operations to emergency operations are minimal.

Once these areas of differences are covered, most workers feel comfortable with REP.

13.

Our experience in other countica uhows that there are less than 500 workers that'nced to participcte in the training program. More commonly, there are 200 to 300. This is because we use a train the trainer type approach. That is, you identify key personnel who will be involved at the EOC, at depart-ment offices, and in supervisory roles, train them, ar.d then they can pass the information along to their workers.

For example, the School Annex Officer and alternatives at the EOC need to be involved in the training as do school superintendents and principals. These last two would pass the information along to the teachers just as they would in other types of emergency response (tornadoes, etc.).

14.

Given all of the above, the county officials become the key for training local workers.

~

inn assjst you Jn setting up a schedule, for the development of the part IV presentation, and the development of training material. The state will have a booklet for all workern (Nuclear Incident-BrJefing Material) as well as outlines for each part.

15. This training program is on an annual basis. We will assist you in retraining all personnel cach year and updating the program as needed. There is a continual feedback into the presentations from experience gained in the program.

16.

Specialized training will he provided as needed.

For example, decontamination procedures.

l-This program han been sucessful in other parts of the state. We can maximize l

state, utility, and county time and personnel by holding large training sessions for mixed functional groups and covering parts I, II, III, and the first half of part IV.

This should take about four hourn. The last half of part IV can be covered in smaller groups over a longer period of time.

I would expect that all of the county and local workers could be provided with the training program in two weeks if sessions were held at a large facility.

In other counties, we.

_ have held three sessions a day (9 a.m.,1 p.m., and 7 p.m.) for five days and L

covered all of the workers. This gives people a variety of times to attend so l-their schedules are not disrupted.

l l

l

-e Mr. Philip Scheuerman Page Four January 31, 1984 Using this approach, training in Monroe County could be started soon and cover all the personnel needed in a short period of time.

If you have any questions, please feci free to contact me.

Sincerely, YWh*

Danici M. Sibo, AICP Pre-Disaster Services Section DMS:cmh i

L k

+

f i

l.

--,<r-

., - - ~,, -,

,.,,r-.

.--e

=

sr-,,

- - + -

9. -

NUREG 0654 TRAINING SUPPORT FOR OFF-SITE ORGANIZATIONS TRAINING PROGRAM PRESENTATION OUTLINE s

10-83

E 1

30-83

_ TRAINING SUPPORT PROGRAM PART 1: Easics of Radiation and Plant Operations: (Utility)

I.

PLANT OPERATIONS (General description of type of reactor, operations,'etc.)

II.

PLANT EMERGENCY OPERATIONS PLAN AND FACILITIES (Ceneral purpose of emergency plan and emergency facilities (TSC, EOF))

III. ATOMIC AND NUCLEAR STRUCTURE A.

The Nuclear Atom 1

Size 2.

Components a.

Nuclear b.

Electrons B.

The Nucleus 1.

Neutrons and Protons 2.

Nomenclature and Symbols a.

Elements b.

Isotopes IV.

RADI0 ACTIVITY A.

Radioactive Decay 1.

Nuclear Stability 2.

Modes of Decay a.

Alpha Decay b.

Beta Decay 3.

Gamma Emission B.

Decay Laws 1.

Activity:

the Currie l-2.

Half life l

C.

Radioactive Materials 1.

Natural Sources 2.

Artificial Sources V.

RADIATION ENVIRONMENT A.

Natural Background 1.

Cosmic Rays 2.

Earth and Building Materials 3.

Internal Sources B.

Man-made Sources 1.

Medical Exposures y

2.

Nuclear Power 3.

Other

U 10-83 PART 2: Biological Effects and Detection of Radiation: (State Rad. Ilealth)

I.

BASICS A.

Radiation Effects on Cells 1.

Cell Damage 2.

Sensitivity to Radiation B.

Units of Radiation Dose 1.

Rad 2.

Rem C.

Acute vs. Chronic Doses II.

RADIATION EFFECTS ON ORGANISMS A.

Acute Doses 1.

Radiation Sickness Syndrome 2.

Sources of Data B.

Chronic Doses 1.

Genetic Effects 2.

Somatic Effecta 3.

Rates of Incidence III.

RADIATION DETECTION A.

Interaction of Radiation with Matter 1.

Energy Deposition i

2.

Range of Travel l

3.

Cerenkov Glow B.

Instruments 1.

Counters and Survey Meters 2.

Dosimeters l

a._

Film Badges b.

Thermo-luminescent Detectors IV.

RADIATION ENVIRONMENT A.

Radiation Protection 1.

Standards a.

General Population b.

Occupational Standards l

2.

Practices l

a.

Time, Distance, and Shiciding b.

Records B.

Radiation Risk in Perspective 1.

Comparison with Other Environmental Insults l

2.

Comparison with Other Riska l

C.

Exposure vs. Contamination l

L

1 MSP/EMD 10-83

.i PART 3:

Radiological Emergency Response Plans (State Emergency Hamt. Div.)

INTRODUCTION A.

Purpose B.

Objectives I.

RADIOI.OCICAL EMERCENCY RESPONSE PLANS A.

Purpose D.

Legal Basis C.

Michigan Act 390 of 1976 II.

MAJOR ORGANIZATIONAL STRUCTURES AND RESPONSIBILITIES A.

Levels of Government Involvement B.

Emergency Service Concepts C.

Federal Level D.

State Level E.

Local Level F.

Utility III.

PROCEDURES WITilIN Tile PLAN A.

Plan vs. Procedures B.

Emergency Response Procedures and Example C.

Protective Actions D.

Evacuation Concepts IV.

RECOVERY A.

General B.

Operations V.

SUMMARY

10-83 PART 4:

County Radiological Emergency Response Plan: (County Coordinator, et al.)

I.

SUPPORT ORCANIZATIONS' STRUCTURES AND RESPONSTBTI.1TIF.S A.

Notification Procedures B.

EOC Operations C.

Communications D.

Coordination of Resources E.

,Public Information 1.

JPIC r

F.

Procedures for Handling Dosimetry II.

RESPONSIBILITIES BY FUNCTION UNDER LOCAL PLAN O

Detroit ECISOn E5n*"

February 8, 1984 Mr. Jon R. Eckert Director /Coordinalor Monroe City-Conni.y Ollice of Civil Prepaiedness County Courthouse 106 E. First Street Monroe, MI 48161

Dear Jon:

We have been reviewing the Monroe County Plan and previously for-warded our comments to you.

However, we have discovered one area that needs to be addressed further.

That area relates to tlie county response in a'very fast moving incident, e.g., when we

-90 right li Lo a Geoeral l'iintrgesicy.

Your plait sliould state LliaL the Chairperson of the Board of Consnissioners has the authority and will make an lusnediate protective action reconsnendation.

Your plan slionld *. late how Lliis will be done given flie guidance and requirements specified in NUREG-0654 FEMA / REP-1.

In addition, you should identify who else has ~the authority to make such a recommendation if the chairperson cannot be reached.

As a suggestion, you migiL colisider inicluding an " automatic" protective action recommendation for this particular situation or base it on exactly what we reconunend to you.

We have an automatic reconunendation whenever we enter the General Emergency classification.

Our automatic minimum protective action recommendation is to shelter in a two-mile radius and five miles downwind. Both FEMA and the NRC will be looking for predelenisined protective actions at Lliis classification for this sTLiiaficia.

If you have any questions, I can be reached at 586-4320.

Sincerely, h

Thomas Randazzo / [

Supervisor Radiological Emergency Response Preparedness TR: bbl NEEP/84/054 cc:

Lt. J. Tyler 4