ML20080K594

From kanterella
Jump to navigation Jump to search
Proposed Ts,Modifying Sections 15.6.5, Review & Audit & 15.7.8, Administrative Controls, by Removing QA Audit Frequency Requirements & Removing Section 15.6.5.4, Emergency Plan Reviews
ML20080K594
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/24/1995
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20080K559 List:
References
NUDOCS 9503010185
Download: ML20080K594 (2)


Text

, . .

s . j . ~ , 3 ..

15.6.5.3 Fire Protection Audits a) 'An independent fire protection'and loss prevention inspection and audit shall be performed annually utilizing either qualified offsite license] personnel or an outside fire protection firm.

b) An inspection and audit of the fire protection and loss prevention program shall be performed by an outride qualified fire consultant.

at intervals no greater than 3 ye re.

15.5.5.4 E;;r;;;;y Pl: R: i:::

) A retice :f th: E::r;:::y_Pr:p;r:d:::: Pr;;r:: 05:11 be perfor;;d -
lly utili:ing either Off:it: lic::::: p:r:::::1 cr :: : t:id:
1::r ::::alting fir:. The ::dit :h:11 bc :::d::ted in ::: rd::::

eith 10 CFR 50.5?(t) :: Off::ti;; :: S:pt;;b:r 1, 1002.

I 1

I 1

s Unit 1 - Amendment No. 15.6.5-8 Unit 2 - Amendment No.  ;

'M503010185 950224  !

PC$t AIKMOK 05CK)0266 l P PINR

7 l

i i:f --

15.7.8 ADMINISTRATIVE CONTROLS 15.7.8.1 Duties of the Manaaer's Suoervisory Staff  !

The duties of the Manager's Supervisory Staff with respect to these radiological effluent technical specifications are listed in Specification 15.6.5.1.$6 at Items J. and k.

15.7.8.2 Audits  !

A. An audit of the activities encompassed by the Offsite Dose Calculation Manual and the Process Control Program and its implementing procedures'shall be performed :t le::t ::::

ry 24
nth: utilizing either offsite licensee personnel i or a consulting firm.

B. An audit of the radiological environmental monitoring program and the results thereof shall be performed at le::t  ;

c';;ry 12 cenths utilizing either offsite licensee .

personnel or a qualified consulting firm. '

C. The results of the audits in A and B above shall be trans-mitted to the Vice-President - Nuclear Power and the ,

Chairman of the Offsite Review Committee.

15.7.8.3 Plant Ooeratina Procedures The ODCM and the PCP shall be established and maintained in accordance with the provisions of specification 15.6.8. Effluent and environmental monitoring shall be addressed in the Quality Assurance Program.

15.7.8.4 RETS Reportina Reauirements The following written reports shall be submitted to the Administra-  ;

tor, U.S. Nuclear Regulatory Commission Region III with a copy to the Director, Office of Inspection and Enforcement, USNRC, Washington, D.C. 20555 within the time periods specified.

A. AKHEil' S ri:nnu:1 Monitorino Report A report @}R@)hi^[6Miifs[6fjP8NQMtfEj@iliiji[@Hi M N 5 N E$3 N d N 2 N [Ik N ! N E I N N h$2E N N h b h1 b ! N f3 M ! +

E lDI NIN N O M NIM M Il E N I ENN} W4 thin 50 d J: Oft: 1 J::::ry 1 :nd July 1 ::ch y::r for the :fx : r.th'p:ried er .

fr : tion there f, ending Jun: 30 :nd D :::bcr 31 containing: l Unit 1 - Amendment No. 15.7.8-1 Unit 2 - Amendment No.

i l