ML20080H387
| ML20080H387 | |
| Person / Time | |
|---|---|
| Site: | Mcguire |
| Issue date: | 01/30/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| RO-370-83-92, NUDOCS 8402140185 | |
| Download: ML20080H387 (1) | |
Text
_
DUKE POWER GOMPANY P.O. HOX 33180 CHAMLOTTE, N.C. 28242 HAL H. TUCKEH Ten.rr,sosz j";l=g January 30, 1984
(*) ""
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region 11 101 Marietta Street NW, Suite 2900 Atlanta, Georgia 30303
Subject:
McGuire Nuclear Station Unit 2 Docket No. 50-370 LER/RO-370/83-92
Dear Mr. O'Reilly:
Reportable Occurrence Report R0-370/83-92 was to have been submitted by January 30, 1984. This 30 day Reportable Occurrence (pursuant to T.S.
6.9.1.11) concerns an event with the Reactor Coolant System (cold shutdown -
loops not-filled, T.S. 3.4.1.4.2) which occurred on December 31, 1983. At
)
this. time investigation of the incident and preparation of a report are not yet complete. The report will be submitted by February 8, 1984.
Ve.ry truly yours,
' skb.
l/h Hal B. Tucker PBN:jfw cc:
Document Control Desk Mr. W. T. Orders U. S. Nuclear Regulatory Commission NRC Resident Inspector Washington,- D. C.
20555 McGuire Nuclear Station Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8402140185 840130 PDR ADOCK 05000370 S
PDR OFFICIAL COPY Tb V D
y
_ - - _ -