Requests Relief from NRC 830316 Order Re Addl Refueling Cycle for Installation of Noble Gas Steam Effluent Monitor, Per NUREG-0737,Item II.F.1.1.Feasibility of Procuring & Installing Replacement Monitor Being Investigated
ML20080C785
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/03/1984
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: John Miller
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM NUDOCS 8402080272
Download: ML20080C785 (3)


Text

l I

DALTI M O RE GAS AND

=

ELECTRIC 2

CHARLES CENTER P. O. BOX 1475 BALTIMORE, MARYLAND 21203 3

m ARTHUR E. LUNDVALL. JR.

g vicE PRESIDENT Y I SvPPLY R

4 Director of Nuclear Reactor Regulation i

Attention: Mr. 3. R. Miller, Chief Ir Operating Reactors Branch #3 Division of Licensing U.S. Nuclear Regulatory Commission d

Washington, D.C. 20555 3;

Subject:

Calvert Cliffs Nuclear Power Plant Units Nos.1 & 2; Dockets Nos. 50-317 and 50-318 g

Request for Modification of March 16,1983 Order g

Gentlemen:

j The Baltimore Gas and Electric Company hereby requests relief from the E

schedular requirements imposed by the Nuclear Regulatory Commission Order dated j

March 16,1983, amounting to one additional refueling cycle for each unit, with regard to q

installation of the Noble Gas Steam Effluent Monitor.

BACKGROUND 3

I By our letter dated February 18, 1983 we informed you that we were Y

experiencing difficulties in the procurement and installation of an acceptable noble gas 4

steam effluent monitor as required by item I.F.1.1 of NUREG-0737, " Clarification of

{

TMI Action Plan Requirements." We explained that deficiencies of sufficient magnitude

-i had been discovered during our vendor's (Kaman Instrumentation) qualification testing program such that conformance with Item II.F.1.1 would take significantly longer than

{

expected. As a result of negotiations with your staff, we stated that we would make every reasonable effort to resolve our vendor-related difficulties and provide operational e

monitors at Calvert Cliffs before March 1,1984. On March 16,1983 you issued an Order 3

confirming this commitment.

j Please be informed that the aforementior.ed deficiencies have persisted to a

the degree that we feelit is now necessary to request schedular relief until Junu 31,1985 i

for Unit I and Decembe. 31,1985 for Unit 2. In addition to these deficiencies, problems j

have been identified in the manner in which the vendor and his testing organization have 4

implemented their quality assurance programs.

A The Kaman Instrumentation noble gas steam effluent monitor consists of a shielded detector located in the main steam penetration room, triaxial cabling, and a ratemeter with associated electronics located in the control room. The shielded detector assemblies are seismically mounted adjacent to the main steam line piping upstream of

,1 3 4 p

8402080272 040203

'Oh PDR ADOCK 05000317 l

P PDR

\\Q i

a

s I

Mr. 3. R. Miller February 3,1984

?-

T6

=-

L the atmospheric dump valves. While qualification problems have been experienced with both the detector assembly and the raterneter module, ratemeter operational failures 7

have been the primary source of our problems. These problems resulted in repeated delays in the monitor's shipment date, which was originally scheduled for early 1982.

4 After direct involvement by BG&E technical personnel during the summer and fall of g

1982, the ratemeter passed the factory acceptance test.

4 We took delivery of four ratemeter modules (two per unit) in November 4'

1982. Installation of the four monitors was completed in the Summer of 1933 after all of the required mounting hardware had been received. At the time, it was our intention to

~

demonstrate acceptable system performance during normal operations prior to the March 1,1984 deadline and to pursue successful qualification of the ratemeter on a p

separate basis.

4-1 Within one month after activation of the ratemeters, three out of the four 3

had failed for undetermined reasons. We have since returned them to the vendor for 7

repair under warranty and hope to have them re-c'elivered and installed at Calvert Cliffs 7

this Spring.

?

2 Meanwhile, we have had little success in the area of seismic and i

environmental qualification. Just prior to our submittal of February 18,1983 requesting

{

schedular relief, the ratemeter had failed a seismic qualification test. In June 1983 we received a schedule from Kaman for the performance of supplementary qualification testing and analysis and for supplying technical manuals and the qualification test results. According to that schedule, all qualificatien and documentation activities were 1

to have been completed by October 1983.

y E

During the Summer of 1983 the vendor failed to satisfy various provisions of n

his qualification schedule. Consequently, we made additional inquiries on the status of testing. As a result of these inquiries, on August 30,1983 the vendor submitted a new

'[

procedure for repeating the seismic test. Upon review by our engineering and quality i

assurance personnel, this procedure was rejected on September 26,1983 as inadequate.

I Based on the results of this review and our overall experience with Kaman, we cannot be optimistic that this vendor will satisfy our needs in the areas of final qualification and ongoing operational support.

Therefore, it is our intention to i:

investigate the feasibility of procuring and installing an acceptable replacement monitoring system. Unfortunately, we expect that any replacement program may require s

additional outage related work to complete. Thus, we request schedular relief from the deadline imposed by the March 16,1983 Order to cover one additional refueling cycle for y

each unit. During this time period we will continue to implement the compensatory measures referenced in the subject Order. In additien, we will continue to pursue reinstallation of the repaired Kaman monitors after they have been received from the j

vendor's shop.

Q; k-JUST'FICATION s

This request does not involve a reduction in the margin of safety of 4

operations at Calvert Cliffs, as the noble gas steam effluent moniter will not serve a 9

safety-related function.

The purpose of the monitor, as stated Section 2.i.8.b of NUREG-0578, "Short-Term Lessons Learned," (dated July 18, 1979), is to "... provide meaningful release information for offsite emergency actions." 1he monitor will not i

provide any information that is required by the oper-tors to safely shut down the plant in

=

l' Mr. 3. R. Mill:r F;bruary 3,1984 the event of an accident. Dedicated portable instrumentation, when used in conjunction with other plant effluent and process radiation monitors, constitute an adequate interim means for post-accident monitoring of secondary system radiological effluNts.

We regret the need to request additional schedular relief on this TMI Action Item as it has always been our desire to satisfy this regulatory requirement as expeditiously as possible. However, we also realize that in serving the interest of the public health and safety in the long term, the circumstances of this case mandate the course of action we have described above.

We would be pleased to discuss this matter with you further, should you have any questions.

Sincerely, 7

ji g,.e tu AEL/BSM/vf cc: 3. A. Biddison, 3r., Esq.

G. F. Trowbridge, Esq.

Mr. D. H. Jaffe, NRC Mr. R. E. Architzel, NRC

_