ML20080B350

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept 83-08 Re Fabrication of Duct Fittings W/O Approved Design Documents.Initially Reported on 830701.Pullman Sheet Metal Revising Duct Brochure.Next Rept Expected by 831001
ML20080B350
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/29/1983
From: Swartz E
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 7064N, 83-08, 83-8, NUDOCS 8308050419
Download: ML20080B350 (2)


Text

'

/ - N Commonwealth Edison

  1. ) one First National Ptu, Chic go, lihnois f;

J Address Reply to: Post Office Box 767

\ ,/ Chicago. Illinois 60690 July 29, 1983 Mr. James G. Keppler, Regional Administrator

- Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Braidwood Station Units 1 and 2 10 CFR 50.55(e) 30 Day Report Duct Fitting Fabrication NRC Docket Nos. 50-456/457 Oear Mr. Keppler:

On July 1, 1983, the Commonwealth Edison Company Project Construction Department nttified Mr. Julian M. Hinds of your office of a deficiency reportable pursuant to 10 CFR 50.55(e) regarding the fabrication of duct fittings without approved design documents at our Braidwood Station. For your tracking purposes, this deficiency was assigned Number 83-08.

This letter fulfills the thirty (30) day reporting requirements of 10 CFR 50.55(e) regarding this matter and is considered to be an interim report because sufficient information is not available at this time to provide a definitive report.

DESCRIPTION OF DEFICIENCY Duct fittings such as Y-branches, nested elbows, and square to rounds were fabricated without Sargent & Lundy approved design documents or vendor documents.

STATUS OF CORRECTIVE ACTION Pullman Sheet Metal is working on a revision to their Duct Brochure which will identify the construction details for the various duct fittings. The revised Duct Brochure is expected to be submitted to Sargent & Lundy by August 8, 1983. In the interim, duct fittings are being detailed on FCR's and approval is required prior to installation of the fitting. This interim practice is being followed on a limited basis in order to progress with our current construction schedule.

9309050419 830729 1 B83 PDR ADOCK 05000456 AUG S PDR yd

i 1

Upon review and approval of the revised Duct Brochure, an inspection schedule will be established. Additionally, if required, a repair / rework schedule will be developed.

Based on the schedule for submittal of the revised Duct Brochure to our Consulting Engineers stated above, we expect to be in a position to provide a status update by October 1, 1983.

Please address any questions that you or your staff may have concerning this matter to this office.

Very truly yours, ,jr

[ E Douglas Swart Nuclear Licensing Administrator cc: RIII Inspector - Braidwood Director of Inspection and Enforcement US Nuclear Regulatory Commission Washington, DC 20555 7064N

. . , . - , - -