Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
% .
Point Beach Shift Operational Data surnmary September 1994 ,
Unit 1 Unit 2 .
Day Gen XO2 XO4 XOB X27 Net MWe Avg MWe Gen XO2 XO4 XO8 X27 Net MWe Avg MWe 1 12380 502 28 1 5 11845 494 12290 504 41 1 5 11740 489 2 12320 500 29 1 5 11786 491 12220 504 41 1 5 11670 486 4 3 12300 501 29 1 4 11766 490 12240 505 40 1 4 11691 487 4 10770 483 29 1 5 10253 427 12200 503 40 1 5 11652 486 5 12340 500 30 1 5 11805 492 12230 505 41 1 5 11679 487 .
6 12340 502 30 1 4 11804 492 12230 506 40 1 4 11680 487 7 12310 502 29 1 5 11774 491 12220 506 41 1 5 11668 486 8 12330 502 30 1 5 11793 491 12250 507 40 1 5 11698 487 9 12280 501 31 1 5 11743 489 12180 507 39 1 5 11629 485 10 12240 500 27 1 4 11709 488 12150 504 35 1 4 11607 484 11 12250 499 29 1 4 11718 488 12170 504 38 1 4 11624 484 12 12310 501 29 1 5 11774 491 12210 506 40 1 5 11658 486 13 12310 502 29 1 5 11774 491 12210 506 41 1 5 11658 486 14 12290 501 29 1 5 11755 490 12190 506 41 1 5 11638 485 15 12270 501 29 1 5 11735 489 12180 506 39 1 5 11630 485 16 12390 502 29 1 5 11854 494 12140 505 39 1 5 11591 483 17 12380 506 30 1 4 11839 493 12000 503 39 1 4 11453 477 18 12280 494 29 1 5 11752 490 11760 501 40 1 5 11214 467 19 12250 501 29 1 4 11715 488 11660 501 40 1 4 11114 463 20 12260 501 29 1 5 11724 489 11580 502 39 1 5 11033 460 21 12300 501 32 1 7 31760 490 11410 498 38 1 7 10867 453 22 12340 502 37 1 3 11798 492 11370 500 33 1 3 10834 451
, 23 12330 500 38 1 4 11787 491 10680 491 35 1 4 10149 423 24 12350 501 37 1 5 11807 492 230 14 385 1 G -174 -7 25 12510 510 38 1 5 11957 498 0 0 321 1 5 -327 -14 26 11960 487 40 1 4 11429 476 0 0 52 1 4 -56 -2 27 12260 500 79 1 4 11677 487 0 0 4 1 4 -9 0
, 28 12270 500 46 1 4 11719 488 0 0 42 1 4 -47 -2
]
29 12270 499 42 1 5 11724 489 0 0 46 1 5 -51 -2 r
l 30 12260 500 39 1 4 11717 488 0 0 45 1 4 -50 -2 -
l l MONTHLY TOTALS - UNIT 1 MONTHLY TOTALS - UNIT 2 Gross generation: 367450 MWhr Gross generation: 276000 MWhr Total station service: 16164 MWhr Total station service: 13541 MWhr Net generation: 351287 MWhr Net generation: 262460 MWhr Average daily power: 488 MWe Average daily power: 365 MWe 9411230220 941104 6 PDR ADOCK 0500 R
.. . ~, ._m .
OPERATING DATA REPORA DOCKET NO. 50-266 DATE: 10/05/94 .
COMPLETED BY: M. B. Koudelka TELEPHONE: 414-755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .
- 2. REPORTING PERIOD: September - 1994 . .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 . .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 . .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
na
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): na
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
na THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 6,551.0 209,519.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 720.0 5,877.1 171,517.3
- 15. UNIT RESERVE SHUTDOWN. HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,089,561 8,742,192 242,223,962
- 17. GROSS ELECTRICAL ENERGY GENERATED 367,450 2,957,720 81,811,850
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 351,286 2,826,716 77,982,306
- 19. UNIT SERVICE FACTOR 100.0% 89.7% 81.9%
- 20. UNIT AVAILABILITY FACTOR 100.0% 89.7% 82.3%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.6% 89.0% 76.4%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.2% 86.8% 74.9%
- 23. UNIT FORCED QUTAGE RATE 0.0% 0.0% 1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage, 03/11/95, 39 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
__ i--.____.--'__________- _ _ _
POINT BEACH NUCLEAR PLANT Docket No. 50-266 Unit Name Point Beach. Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date October 5.1994 Completed By M. B. Koudelka ',
REPORT MONTH SEPTEMBER - 1994 Telephone No. 414r755-6450 '
hfethod of Shuuing Duratian Licensee Event No. Date hn System Component Cause and Corrective Action Type' (llours) Reason: p,3 cmp Report No. Code
- Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA
'F: Forced 2 Reason:
' Method:
S: Scheduled A - Equipment Failure (explain) ' Exhibit G - Instructions 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram D - Regulatory Restriction LER file (NUREG-0161) 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) ' Exhibit 1 - Same Source G - Operational Error (explain)
H - Other (explain) t.
PBF-0028t>
(03 90) i'
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ = . . _
POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 -
AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 MONTH SEPTEMBER - 1994 DATE October 5.1994 COMPLETED BY M. B. Koudelka TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 494 11 488 21 490 2 491 12 491 22 492 3 490 13 491 23 491 4 427 14 490 24 492 5 492 15 489 25 498 6 492 16 494 26 476 7 491 17 493 27 487 8 491 18 490 28 488 9 489 19 488 29 489 10 488 20 489 30 488 t
l l
_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ ~
, . 'l DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE October 5, 1994 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 488 MWe net for the report period.
Licensee Event Report 50-266/94-008-00, Containment Integrity Requirements Not Satisfied During Valve Testing, was submitted.
Safety-related maintenance included:
- 1. CO2 electrical control board pre-wiring for new 2A06 panel.
- 2. 1C075 turbine IOPS main trip panel relay 01-B replacement.
- 3. 1CC-V-22 and 1CC-V-23 P11A&B component cooling pump casing vent valve replacements.
- 4. ICS-466AA and 1CS-476AA HX-1A&B steam generator feedwater check valves heat tracing installation.
- 5. G02 emergency diesel generator relay STLO2 readjustment and
.PT fuse replacements.
- 6. G04 emergency diesel generator starting air motor rebuilts.
- 7. 1N42 and 1N46 power range channel adjustments.
- 8. 1P2C charging pump bonnet and diaphragm replacement.
- 9. 1P11A component cooling pump bolts were tightened.
- 10. 1SI-151R-08 safety injection / containment spray full flow test line common header pipe support addition.
. . . . . . . . 0692 2 7 06676 2 0 7 2 7 4 7 3 2 2 5 6 6 2 1 1 E 083 5 0 , 4,9,8 8 88 V 3, 5 2 2 3 9 7 0 I , , 5 6 3 a . . T 4 0 8 9, 2, 4, k A 97 6 l L 1 1 1 1 2 8 _
e . .
U 4 87 d M 2 u 0 : U o 8 . . S C K 4 N 6 O
. - . . S B 5 A 5 E %%%%% 7 1 7 R 3 06 55 6 2 0 0
3 4 M
4 E E 00050.96 .
1 7 05 03 1 3 7 7 7 5 0 3
7 9
1
- 9 1 . . V T 5 8 8 , , , 999 9 0 / : 4 I A 5
, 3, 3, 83 0 ,
5 5 Y G D 8 4 0 2 0 B
. / :
O 6 6 6 5
, 2, 1 ,
2 O 0 D E T T 933 : R N 1 E N . . R ) E T O O R H B -
T E H P A C M E : L P . . E E A E K E P E R Y E T C T M L P O A O E .
. T F E D D C T S O S A %%%%%
L 0005 09 09 002 3 0 N D 7 0 5 O : E E 06 04 02 0,4,7 7 7 5 3 0I P T C H 2 5 5 , 7 7 7 T U A N T 7 5 5 1 62 A T D I N 2 7 6 R R
. S O 8 2 2 U A R M D T E S ) S T
.E . 7 S D T T A I N F E H N H A
.Oa .
G T O L U ,
E C O : E T R
. . . . . . . R ) T A N H E A D 0 T W D N 2 M D I 9 03 ,
E T 0 T E T D I 5 5 S E P A E N 0 8 M N Y M T T U 4 E ( T I S R 7 : T '
( T E O - 9 ) I Y S U P 4 E : ( N S E Q E T W) A ) H E R N 5. 8. : MES L ) H ) ) T ,
R _
A4 8 WG F : A H W TT N D A L9 1 3 ) S MN I ) C W M E E O O S T P9 5 2 ES I Y I MD ( NN M I A A 1 1 5 WOTT , N T ( E R _
D R MREA DA I TD CR 6 E D _
A - GNR E RS D AE D E P E G E : : T( ( TF CR ERT MD T T _
N L r) ) E Y CI U TE A X T A I C eTENY Y T I ( SO SANR GG E R L _
T UbWW( TTI R AH R REE NN N O U A N mMM I I C T ,
DW U E G N I I P C R e( GCCA S S O N ON E RS S R E L E H t S NAAP EN I RWEHE Y G OU UE( E R A _
P C PRS I PP A RO ROON GG T( TV C O A eE OTAAC I E TD I N RY C AO F _
E S WRACC HT P CTLWYE G ARRR O S B OG( R N CC AU OG NR RFOO D R P EEI I I GE HND REE O TTE E D O T : LLL HR NRS OTE NTYC CG L N T S ND LG ABB R WT I U NLE CTAAAU E C U I OANCAAU S TS E R HEA AI FF TD A T OI MI I D D C OE RR VOS CLFL U E T F A P RRTRN NC TR OU R T LI A I YY OH A T E E ATE E O P OE AE ARC EB TT C D S P H RCP P LR EHS RVMTI CAI I D S N N
- T EEE S E O R EER R CRI LCCE W A G EG ELD DE VF FRN EEE TVI AACS O N MNDTE G E NO ES HL CRAP P RN D4 D I AI EA MMN LS I RGE TEEE VAAOW T9 E T NTS LNUU A N RO R LS ACC FO U/T A R NPGMMH RO S E TS S S E D H0R R TOE E I I I C ES RB CRTS S TTTTTTES3 O E I PCMSXX WA UMAU I OOTI I I I I UN / P P NE I AEAAFAOEA OU E ONRRE NN NNNH OF0E O URLNDMMI NPRN H NRHUG GNUUUUUS NI 1 R A
1 2 3 4 56 7 8 90 1 2 3 4 5 6 7 89 01 2 3 4 5 T 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 A D
[l ll l!ll (l l
POINT BEACH NUCLEAR PLANT Docket No. 50-301 Unit Name Point Beach, Unit 2 -
UNIT SHUTDOWNS AND POWER REDUCTIONS Date October 5.1994 Completed By M. B. Koudelka -
REPORT MONTH SEPTEMBER - 1994 Telephone No. 414/755-6480 -
Method of -
Shumng Duranon Down Licensee Event System Compcment Cause an! Corrective Acton ,
No. Date Type' Olours) Reason 2 Reactor s Report No. Code
- Code' To Prevent Recurrence 2 9/24/94 S 165,5 C 1 NA NA NA Scheduled refucimg and maintenance outage (U2R20). Major work items include amptector upgrades, RIIR pump rotor replacement,4-rotor linut switch upgrades, main feedwater check valve replacements, reactor heat shield. SI-854A&B internals replacement, Gai-tronics upgrade, G04 emergency diesel generator tie-in work, reactor coolant pump seal water flow transminer replacement, safeguards sequence omtng relay replacements, control rod dnve mechanism control current uming modificanon, degraded gnd voltage relay work, steam generator blowdown heat exchanger replacement, and containment service water pipe supports as part of continued Bulletin 79-14 upgrades.
'F: Forced 2 Reason: 3 Method: ' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdowm Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (explain) ' Exhibit 1 - Same Source G - Operational Error (explain)
H - Other (explain)
PBF4x)28b (03-@)
POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301- ,
AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 2 MONTH SEPTEMBER - 1994 DATE October 5,1994 i COMPLETED BY M. B. Koudelka l
TELEPHONE 414-755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY r ALLY POWER LEVEL POWER LEVEL POWET LEVEL DAY MWe NET DAY MWe NET DAY M M NET 1 489 11 484 21 453 2 486 12 486 22 451 3 487 13 486 23 423 4 486 14 485 24 -7 6
5 487 15 485 25 -14 6 487 16 483 26 -2 7 486 17 477 27 0 8 487 18 467 28 -2 9 485 19 463 29 -2 10 484 20 460 30 -2
+
p % 4 i
DOCKET No. 50-301 UNIT NAME Point Beach Unit 2 DATE October 5, 1994 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 2 operated at an average of 365 MWe net for the report period. The unit was shutdown for a refueling and maintenance outage on September 24, 1994.
Safety-related maintenance included:
- 1. 2CS-466AA HX-1A steam generator feedwater check valve pressure seal and hinge pin gasket replacements.
- 2. 2P158-M safety injection pump motor meggared and main power cables connected for new diesel project.
- 3. 2SI-841A-0, 2SI-878A-0, 2SI-878B-0, 2SI-878C-O and 2SI-878D-O P15A&B safety injection pump and accumulator operators 4-rotor limit switch installations.
- 4. 2SW-2907 HX-15A-D containment recirculation heat exchanger emergency flow control valve packing adjustment.
)
l 1
l 4