ML20079S409

From kanterella
Jump to navigation Jump to search
Motion for Order Requiring Svc of Util Rept Required by IE Bulletin 83-08 Re Safety Circuit Breakers
ML20079S409
Person / Time
Site: Harris 
Issue date: 01/28/1984
From: Eddleman W
EDDLEMAN, W.
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20079S359 List:
References
82-468-01-OL, 82-468-1-OL, IEB-83-08, IEB-83-8, ISSUANCES-OL, NUDOCS 8402030324
Download: ML20079S409 (1)


Text

L 1

Ces i:

T;N UNITED STATES OF AMERICA January 28, 1984 NUCLEAR BEGULATORY COMMISSION

'84 FE8 -2 Pl2 :26 CFFii c,; y g BEFORE THE ATOMIC SAFETY AND LICENSING BOAED

$NdC Glenn O. Bright Dr. James H. Carpenter James L. Kelley, Chairman In the Matter of

)

Docket 50 400 OL CAROLINA POWER AND LIGHT CO. et al.

)

(Shearon Harris Nucleer Power Plant,

)

Units 1 ani 2)

)

AsLBP No. 82-h68-01

)

OL Motion for Order Reauirine Service of'CP&L Report to NRC concerning Harris Safety Circuit Breakers Wells Eddlenan, having filed a contention 161 and a vevised

breakers, contention concerning circuit now shows the Board:

1.

IE Sulletin 83-08, dated 12-28-83 but only received by ne last week, describes (p.1) failures of reactor trip breakers due to under voltage trin attachments (UVTA)s because such attachments provide "only a linited force to trin the breakers".

It goes on to identify nroblems of nisalignment, lubrication, adjustment, l

hardening or contamination of grease, excessive wear etc.

within 90 days 2.

The sane bulletin requires for Westinghouse types DB snd DS breakers (Harris uses DS-416's) a review and a rerort on the design and design nargin (in light of the above-named nroblens) and a review f

of onerating exnerience with similar breakers in a utility's P ants, l

toO Q

as well as a dentailed description of breaker surveillance / test prograns.

28 The above information is necescary to ne to evaluate whether new or further amended contention (s) on circuit breakers at Harris should Ea:

be filed.

Since this is a safety issue, further delay in getting info f

$$o to me (e.g. wa! ting for it to work through the NDC/PDD/LPDR systen l

which can take un to 8-10 weeks) could dela this proceeding.

l The earlier 1 get it, the less delay is lik ly.

,f l

Therefore I a sk the Board to order CD&L to serve one copy of its

)

report recuired by IE Bulletin 83908 on ne when it's sent to NRC. EN

[