L 1
Ces i:
T;N UNITED STATES OF AMERICA January 28, 1984 NUCLEAR BEGULATORY COMMISSION
'84 FE8 -2 Pl2 :26 CFFii c,; y g BEFORE THE ATOMIC SAFETY AND LICENSING BOAED
$NdC Glenn O. Bright Dr. James H. Carpenter James L. Kelley, Chairman In the Matter of
)
Docket 50 400 OL CAROLINA POWER AND LIGHT CO. et al.
)
(Shearon Harris Nucleer Power Plant,
)
Units 1 ani 2)
)
AsLBP No. 82-h68-01
)
OL Motion for Order Reauirine Service of'CP&L Report to NRC concerning Harris Safety Circuit Breakers Wells Eddlenan, having filed a contention 161 and a vevised
- breakers, contention concerning circuit now shows the Board:
1.
IE Sulletin 83-08, dated 12-28-83 but only received by ne last week, describes (p.1) failures of reactor trip breakers due to under voltage trin attachments (UVTA)s because such attachments provide "only a linited force to trin the breakers".
It goes on to identify nroblems of nisalignment, lubrication, adjustment, l
hardening or contamination of grease, excessive wear etc.
within 90 days 2.
The sane bulletin requires for Westinghouse types DB snd DS breakers (Harris uses DS-416's) a review and a rerort on the design and design nargin (in light of the above-named nroblens) and a review f
of onerating exnerience with similar breakers in a utility's P ants, l
toO Q
as well as a dentailed description of breaker surveillance / test prograns.
28 The above information is necescary to ne to evaluate whether new or further amended contention (s) on circuit breakers at Harris should Ea:
be filed.
Since this is a safety issue, further delay in getting info f
$$o to me (e.g. wa! ting for it to work through the NDC/PDD/LPDR systen l
which can take un to 8-10 weeks) could dela this proceeding.
l The earlier 1 get it, the less delay is lik ly.
,f l
Therefore I a sk the Board to order CD&L to serve one copy of its
)
report recuired by IE Bulletin 83908 on ne when it's sent to NRC. EN
[