ML20079R874
| ML20079R874 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 01/26/1984 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NCR-2684, NUDOCS 8402030013 | |
| Download: ML20079R874 (2) | |
Text
_ _.
J k'
. ~
~"
~
TF-NNESSEE'VAELEY AUTHORITY
... 3 CHATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II
'11 + $ 31 M0' M nuary 26, 1984
-BLRD-50-438/84-05 s U.S. Nuclear Regulatory Comission
. Region II Attn:- Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Geergia 30303-
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNIT 1 - LENGTH OF INCOM MONITORING SYSTEM PIPING AND GAUGE - BLRD-50-438/84 FIRST INTERTM REPORT The subject deficiency was initially reported to NRC-0IE Inspector C. A. Julian on December 30, 1983 in accordance with 10 CFR 50.55(e) as NCR 2684. Enclosed is our first interim report. We expect to submit our next report by July 9,1984.
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY h$
gL.M. Mills, Manager f
Nuclear Licensing Enclosure.
cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement t
U.S. Nuclear Regulatory Comission l
Washington, D.C.
20555 i
Records Center (Enclosure)
[
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia' 30339 8402030013 8
{DRADOCK05 k
PDR bFFICIAL COPY t.
2)
It An Equal 3pportunity Employer
f ENCLOSURE-BELLEFONTE NUCLEAR PLANT UNIT 1
-LENGTH OF INCORE MONITORING SYSTEM PIPING AND GAUGE BLRD-50-438/84-05 1
NCR 2684 10 CFR 50.55(e)
FIRST INTERIM REPORT Description of Deficiency All incore monitoring system. piping for unit 1 was cut approximately 1-1/2 inches too long as a result of an error in establishing the length of the gauge used to measure each pipe. The cause of this deficiency was misinterpretation of lengths of the certified chain. The first foot is graduated in tenths of a foot and site engineering and QC persormel interpreted this as inches which resulted in this deficiency.
Interim Progress TVA has submitted a sequence control chart (SCC) to Babcock and Wilcox (B&W) for concurrr.nce of the method to be used in remeasuring all of unit 1 incore piping. Final dimensions will be submitted to TVA's Division of Engineering Design (EN DES) and B&W for their determination of resolution.
Further action will be taken as a result of recommendations made by EN DES and B&W.
l I
l L
l l
l
-