First Interim Deficiency Rept NCR 2494 Re Omitted Shim in Cable Splices.Initially Reported on 831228.Investigation Under Way.Next Rept Will Be Submitted by 840801
ML20079R872
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 01/26/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NCR-2494, NUDOCS 8402030011
Download: ML20079R872 (2)


Text

-

M _. _ : -

][:i

_ r s-s

q. 7ENNESSEENALLEY ' AUTHORITY m.

~

l' CHAT (ANCOGA, TENNESSEE 374of

~

400 Chestnut Street-Tower II.

g gj,3) ; N

January 26, 1984 BLRD-50-438/84-04 BLRD-50-439/84-04 U.S.-~ Nuclear Regulatory Coinnission Region II.

Attn:

Mr.' James P. O'Reilly, R'dional Administrator s.101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'_Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND OMITIED SHIM IN CABLE SPLICES ~

- BLRD-50-438/84-04, BLRD-50-439/84 FIRST INTERIM REPORT The subject deficisney was initially reported to NRC-0IE Inspector C. A. Julian on_ December 28, 1983 in accordance with 10 CFR 50.55(e) as NCR 2494. Enclosed is our first interim report. We expect to submit our next report by August 1,- 1984. Future reports on this NCR will be submitted: with those on NCRs' 2383, 2384, 2385, and 2395 (BLRD-50-438/83-40, BLRD-50-439/83-34).

-If' you have any questions, please get in teuch with R. H. Shell at

. FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY-0 SW

%. M. Mills, Manager l

Nuclear Licensing Enclosure oc :. Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center (Enclosure)-

- Institute of Nuclear Power: Operations 1100 Circle 75 Parkway, Suite 1500' Atlanta, Georgia 30339

"~

8402030011 840126

-PDR ADOCK 05000438 8

PDR OFFICIAL COPY (5 2. ~7

/q An Equal Opportunity Employer

_,,,.... _.... ~.. ~.

J

' ENCLOSURE

.BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 OMITIED SHIM IN CABLE SPLICES BLED-50-438/84-04, BLRD-50-439/84-04 NCR 2494 10 CFR 50.55(e)

FIRST INTERIM REPORT Description of Deficiency While cable 2VE-ECA3-14-A was being spliced, it was noted that the

' splice kit used (Raychem NPKV-2-14) was not installed according to the manufacturers instructions which mquiros an uncoated WCSF-U Raychem sleeve be used as lug and bolt cover sleeve. The WCSF-200-U Raychem sleeve, which'is provided as a shim with the NPKV splice kit, is being used as a lug and bolt cover sleeve with. the shim being omitted.

Without the shim, the two No.14 conductors (2VE-ECA3-14-A) are below the minimum use range of the Raychem breakout body. This deficiency may be onarateristic of all terminations (gmater than 100 in number) made using the Raychem NPKV splice kits.

Interim Progress TVA is in the process of investigating the root cause and the extent of corrective action required. Results of this investigation and proposed corrective action will be provided to the NRC at a later date.