RO 50-366/83-01:on 830125 & 0314,Units 2 & 1,respectively, Had Spray/Sprinkler Sys Taken Out of Svc for Mods & Could Not Be Restored to Operable Status within 14 Days Per Tech Specs.Continuous Fire Watches Maintained
ML20079Q102
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/06/1983
From: Nix H
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GM-83-421, RO-50-366-83-01, RO-50-366-83-1, NUDOCS 8305110364
Download: ML20079Q102 (3)


Text

-

Georgia Power Cornpany Post Office Box 433 Banley, Georgia 31513 Telephone 912 367-7781 912 537-9444

(! ^ '.i g p n,,,,

,..., ~....-y

s., -- : -

g, g

Georgia Power

( l,]'[ g Edwin 1. Hatch Nuclear Plant GM-83-421 PLANT E.

I.

HATCH Special Report Docket No.

50-366 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street Atlanta, Georgia 30303 ATTENTION:

Mr. James P.

O'Reilly Pursuant to Section 6.9.2 of Hatch Unit Two Technical Specifications, please find attached Special Report No.

50-366/1983-001, Rev.

1.

4

/

y' M N >[k 2 N

1 (_ __

[ General Manager II. C. ~ Nix

/,,

v HCN/SBT/abb xc:

R.

J.

Kelly G.

F.

Head J.

T.

Beckham, Jr.

P.

D.

Rice K.

M.

Gillespie S.

B.

Tipps R.

D.

Baker Control Room Document Control

. ;{,7 "T 8305110364 830506 DR ADDCK og0003p3 eDR p 2 a-

+4 a

SPECIAL REPORT 50-366/1983-01, Rev. 1 3

LICENSEE

GEORGIA POWER COMPANY FACILITY NAME EDWIN 1.

HATCH DOCKET NUMBER 50-366 Tech. Specs. section(s) which requires report:

Unit 1 Tech. Specs. section 3.1.13.3, ACTION b and Unit 2 Tech. Specs, section 3.7.6.2, ACTION a, required this report due to spray / sprinkler systems for Unit 1 East Cableway and Unit 2 East Cableway not being restored to operable status within 14 days.

Plant conditions at the time of the event (s)-

On. January 25, 1983,. Unit 2 was in steady state operation at 1714 MWt (approximately 70% power)

On March 14, 1983, Unit I was in the run mode, increasing reactor power on a ramp from 1825 MWt (approximately 75% power) to 2082 MWt (approximately 85% power)

Detailed description of the event (s)-

1.

On January 25, 1983:

Unit 2's East Cableway spray / sprinkler system was taken out of service for the performance of modifications on it.

2.

On March 14, 1983:

Unit l's East Cableway spray / sprinkler system was taken out of service for the performance of modifications on it.

Consequences of the eventJs):

Within I

hour of each of the event's (fire zones) event

dates, continuous fire watches were assigned to appropriate areas of the i

plant to inspect the inoperable zones as required per Unit 1 Tech.

Specs, section 3.13.3, ACTION a

and Unit 2 Tech.

Specs, section i

3.7.6.2, ACTION a.

The fire watches remained in effect until affected inoperable zones were returned to operable status.

The health and safety of the public were not affected by these non-repetitive events.

Cause(s) of the event (s)-

1.

The Unit 2 East Cableway spray / sprinkler systom was modified to l

provide protection for an area of the Unit 2 East Cableway that i

I was previously protected by an extension of the Unit 1

l spray / sprinkler system.

l l

2.

The Unit 1 East Cableway spray / sprinkler system was modified to replace non-seismic hangers with seismic

hangers, move 13 sprinkler
heads, and remove the extension of spray / sprinkler system providing coverage in Unit 2 East Cableway.

The sprinkler heads were moved to provide better spray coverage for affected areas under protection.

t I

~. _

Special Report 50-366/1983-01, Rev. 1 Page Two Plans for restoring the sprav/ sprinkler systems to operable status:

1.

The Unit 2 East Cableway spray / sprinkler system was returned to operable status on April 1,

1983.

2.

The Unit 1 East Cableway spray / sprinkler system was returned to operable status on March 30, 1983.

.