Advises That LER Will Be Submitted within 30 Days of 911104 Determination of TS Missed Surveillance Re Potential for Leakage Path from Containment Into Annulus Through Containment Spray Check Valves
ML20079P960
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/06/1991
From: Mcmeeken T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9111140252
Download: ML20079P960 (2)


Text

_ -.

Il I

.tur her conge; avwis w:n

' % &irt hsu kar statum e

e lll0u tturm ik try RoaJ lluruto rm!k, N(??svig by5 DUKE POWER November 6, 1991 U.S. Nuclear Regulatory Commission Docuuent Control Desk Washington, DC 20555

Subject:

McGuire Nuclear Station Docket No. 50-369. 370 l

y

Dear Sirs:

On October 4,1991 at 0446, a significant event not ification was made pursuant to 10 CFR 50 Section 72(b)(2)(1) for Unit 1 and 10 CFR 50 Sect. ton 72(b)(1)(ii)(B) for Unit 2.

The call was conservatively mado due to the potential for a leakage path from containment into the annulus through containment spray check valves.

This leakage had the potential to be out side the limits for tho Offsite Daso Assessment and the Control Room Doso Assessinent. Test.ing of theso valves in ihe "as four.d" condition proved the leakage t1 he wit hin the limits. Thorofore, no Licensee Event Report is required to be submit.ted por the above referenced sections of 10 CFR 50.

On November 4, 1991 a meeting van hold to discuss tho opt ions available to address the testing concerns of these check valves.

During this meet ing, t he determination was mado that those check valves woro containment isolation valves and were rnquired to be tested por Technical Specification 4.0.5.

Since this had not been previously recognized, the vnives had not been tested. Thorofore, this is considered a missed surveillance of Technical Specification 4.0.5.

pursuant.

to 10 CFR 50 Section 73(a)(2)(1)(B), a Licensco Event Report will be submitted within 30 days of the November 4,

1991 determination of the Technical Specificat. ion missed surveillance.

If you have any questions, call Terry I'odorven at (704)875 4478.

Very truly yours, frMof T. C. McHecken Vice president McGuire Site LJK/cb1 60 m n m m m m. _

\\o n-wa S

POR w,, -

t

~, -.

-,-r-

..m

,,e

,y-

U.S. Nuclear Regulatory Commission November 6. 1991 i

Page 2

[

ect Mr. S. D. Ebneter Administrator. Region II U.S. Nucioar Regulatory Commission 101 Harlotta St., NW, Sutto 2900 i

Atlanta, CA 30323 INPO Records Center Suito 1500 1100 Circio 75 Parkway Atlanta, GA 30339-Mr. Tim Reed U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation i

i Washington. D.C. 20555 Mr.

P.-.K. Van Doorn NRC Resident Inspector McGuire Nuclear Station I

b 4

l b

, _, -.. - -. ~,... -... -. _.

_