First Interim Deficiency Rept Re Incorrect Performance of Seismic Pipe Support Insp.Initially Reported on 830131.Insp Records for Analyzed Supports Reviewed to Determine Location Recorded within Specs.Next Rept by 830620
ML20079P485
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 02/28/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8303040632
Download: ML20079P485 (2)


Text

_.. -

)

TENNESSEE. VALLEY AUTHORITY 400$e"si,$$ Sir"e"e?YoTre*/f February 28, 1983 g

3 45 BLRD-50-438/83 "

To BLRD-50-439/83 *

?[d?

m

'.M

',5 U.S. Nuclear. Regulatory Comission

(

Region II

,7 Attn: Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 w

Atlanta, Georgia 30303

. I

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - SEISMIC PIPE SUPPORT INSPECTION DEFICIENCIES - BLRD-50-438/83-18, BLRD-50-439/83 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector.

Linda Watson on January 31, 1983 in accordance with 10 CFR 50.55(e) as NCR 2208. Enclosed is our first interim report. We expect to submit our next report by June 20, 1983 If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY P

L. M. Mills, Mf} nager Nuclear Licensing Enclosure cc:

Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 8303040632 830228 PDR ADOCK 05000438 S

PDR g

An Equal Opportunity Employer l

I L

.-~r

.. 1 ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS-1 AND 2 SEISMIC PIPE SUPPORT INSPECTION DEFICIENCIES 4

NCR 2208 10 CFR 50.55(e)

BLRD-50-438/83-18, BLRD-50-439/83-14 FIRST INTERIM REPORT Description of Deficiency Inspections of rigorously analyzed pipe supports were not correctly performed. The support installation locations were not verified against the seismic analysis isometric locations for those cases when the installed location deviated from TVA's Division of Engineering Design's design detail locations. The apparent cause of this deficiency was a misunderstanding of paragraph 7.1.b of BNP-QCP 6.17, which requires the verification of the location deviation.

Interim Progress All completed inspection records for rigorously. analyzed supports are being reviewed to see that the location recorded on the inspection record is within the location specified by the governing analysis document (plus any applicable tolerance).