ML20079N609
| ML20079N609 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 02/24/1983 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8303040352 | |
| Download: ML20079N609 (2) | |
Text
..
S' 7
TENNESSEE VALLEY AUTHORITY-CH ATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower II February 24, 1983 BLRD-50-438/83-16 BLRD-50-439/83-12 f.d?:
r,,.
U.S. Nuclear Rcgulatory Conunission 5
yp Region II co Attn: Mr. James P. O'Reilly, Regional Administrator l3 101 Marietta Street, Suite 3100
[,'
- %~,
Atlanta, Georgia 30303 r
Dear Mr. O'Reilly:
l cc.
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - SNUBBER INTERFERENCE FROM REAR BRACKETS BY ITT GRINNELL - BLRD-50-438/83-16, BLRD-50-439/83 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on January 26, 1983 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8304. Enclosed is our first interim report. We expect to i
submit our next report by July 22, 1983 We consider 10 CFR Part 21 to be applicable to this deficiency.
l l
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY
. M. Mills, Manager Nuclear Licensing Enclosure oc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555
, gtzpgl AI, CO w.
8303040352 830224 gd---[ ef PDR ADOCK 05000438
/
S PDR An Equal Opportunity Employer
_J
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 SNUBBER INTERFERENCE FROM REAR BRACKETS BY ITT GRINNELL BLRD-50-438/83-16, BLRD-50-439/83-12 NCR BLN BLP 8304 10 CFR 50.55(e)
FIRST INTERIM REPORT s
Description of Deficiency TVA purchased welded rear brackets from ITT Grinnell, Providence, Rhode Island for use in seismic category I piping systems snubber assemblies at Bellefonte. Welded rear brackets on ITT Grinnell figure 306 and 307 snubbers produced and shipped before April 1980 may produce an interference with the snubber restricting the pivot movement to less than the + 5 degrees listed in ITT Grinnell's load capacity data sheets.
Interim Progress TVA will perform a review to determine if any snubbers with welded rear brackets are deficient. TVA is working with the vendor, ITT Grinnell, in determining procedures for corrective action to be taken l
if deficiencies exist.