1 AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
UNir Turkey Point #3 l-16-84 DATE COMPLETED BY '
N W. Gra nt TELEPilONE (305).552-3675 December, 1983' MONTH DAY AVERAGE DAILY FOWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
-(MWe Net)
I 17 2
18 3
19 4
20 5
21 6
22
~
7 23 8
24 9
25 10 26
.II 27
~
'12 2S f
29
~
~
13 14 30
~
15 31 d
16 INSTRUCTIONS On this fonnat. list the ase:. ige daily unit power lesel in MWe Nei for each day in the reporting month. Compute to the nearest whole megawart.
(9/771 l
9401270459 831234 PDR ADOCK 05000250 R
PDR 1 V m.,_
OPERATING DATA REPORT 50-250 DOCKET NO.
DATE 1-16-84 COMPLETED BY NW Grant _.-
TELEPilONE (305)351.-3675 OPERATING STATt'S
- 1. Unit Name:
Turke_y Point Unit 33 Notes
- 2. Reporting Period:
Dec om hpr-10R7 Unit 3 remained out of
- 3. Licensed Thermal Power (MWt):
2.200 srrvice for refueling and
- 4. Nameplate Rating (Gross MWe):
760 scheduled maintenance.
693 S. Design Electrical Rating (Net MWe):
700
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
666
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to.Date Omnulative 11.' Hours In Reporting Period 744 8.760 97.065.6
- 12. Number Of Hours Reactor Was Critical 0
6,505.9 66,306.2 0
0 844.4
- 13. Reactor Reserve Shutdown Hours
- 14. Hoi,rs Generator O.i.Line 0
6,416.8 65,921.9
- 15. Unit Rewrve Shutdown 1(ours 0
0 121_R
- 16. Gross Thermal Energy Generated (MWII) 0 14.070.680 135".488.592
- 17. Gross Electrical Energy Generated (MWII) 0 _.
4,584.575 43.210.565
-4.125 4.325.465 40.913.017
- 18. Net Electrical Energy Generated (MWH)~
0 73.3 67.9
- 19. Unit Senice Factor 0
73.3 68.0
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 0 75.0 65.1
- 22. Unit Capacity Factor (Using DER Net) 0 71.3 60.8
- 23. Unit Forced Outage Rate 0
2.0 5.4
- 24. Shutdowns Scheduled Os er Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
January 7,1984 (actual)
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast At hit s ed INITIA L CRITICA LITY
' INITI A L ELECTRICITY COMM ERCI A L OPER ATION (9/77)
y w
g
'~
s UNIT SilVTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-250 UNITNAME Turkev Point Unit #3 DATE. 1-16-84 COMPLETED BY N.W. Grant REPORT MONT)( necc ber, 1983 TELEPHONE (305)552-3H5 e.
5 5
.! E 3
jYi Licensee Eg Cause & Corrective b.
Date i
3
(
255 Event g?
{
Action to jE 5
35:
Report =
mV Prevent Recurrence H
o U
e 6
J0 831001 s
744 C
4 RC FUELXX Unit #3 removed from service for re-fueling and scheduled maintenance.
(continued) t 2
3 4
F Forced Reason:
Method:
Exhibit G -Instructions S Scheduled A Lquipment Failure (Explain) l Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refuchng 3 Automatic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 9-Other (Explain)
Ol6))
li-Operator Training & Ucense Examination F Administrative b O ' *"* " "'
5 G-Operatior at lirror (Fiplain) c _ /,o ao 44ove
,..,J Exhibit 1 Same Source t'8/77 )
Il Oiiv :1 Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO,
- n_pr;n UNIT Turkey Pof't Unit #3 n
DATE January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT MONTH December, 1983 Unit 3 remained out of service for refueling and scheduled maintenance:
ftajor safety related maintenance activities included:
The unit was refueled for Cycle 9 Bent control rod drive shafts were replaced PORV's were overhauled A containment spray pump motor was repaired A steam header pressure instrument short circuit was repaired Several component cooling water heat exchanger tubes were plugged Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
G M
.-_._;_- _. ~ _ _
AVEll AGE DAILY UNIT POWER LEVEL i
j a
50-251 DOCKET NO.
UNIT Turkey Point #4 l-16-84 DATE N.W. Gr' ant COMPLETED BY -
TELEPilONE (105).552-3675 i
l MONm Derember, 1983
.I DAY AVERAGE DAILY POWER LEVEL pay AVER AGE DAILY POWER LEVEL IMWe Net)
-(MWe Net) 683 if 683 683 682 2
18 4
680 3
612 39 680 375 20 4
5 21 678
)
677 679 6
22 678 7
N 23 684 682 g
24 687 691 9
25 687 697 30 26 685 695 2,
686 692 12 23 13 687 688 29 684 000 14 30 15 685 33 691 E
7 16 1
INSTRUCTIONS On this format. list the aserage daily unit power lesel in MWe Nei for cach day in the reporting inonth. Compute io the nestest whole twgawaii.
(9/77) t
. _. -=
OPERATLNG DATA REPORT
~
DOCKET NO.. fig -251. ___
DATE 1 1A-R4 COMPLETED IlY N.t!. G.3nt TELEPilONE.{-305)552 3675 OPERATING STATUS
- 1. Unit Name:
Turkey Point #4 Notes Unit 4 operated at December,1983 essentially full power except
- 2. Reporting Period:
2200 for brief outage to conduct
- 3. Licensed Thermal Power (MWI):
/bu Unit 3 safeguard Test.
- 4. Nameplate Rating (G.ross MWe):
693
- 5. Design Electrical Rating (Net MWe):
700
- 6. Maximum Dependable Capacity (Gross MWe):
666
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr.-t o-Date Cumulatise 11.' Hours in Reporting Period 744 8760 40.793
- 12. Number Of Hours Reactor Was Critical 737.1 4783.3 64,638.6
- 13. Resetor Reserve Shutdown !!ours 0-0' 166.6
- 14. Hours Generator On.Line 733.7 4572.1 62,468.1 U
U M'2
- 15. Unit Reserve Shutdown Qours
- 16. Gross Thermal Energy Generated (MWil) 1.614.?95 9.828,497
'l31,746.741
- 17. Gross Electrical Energy Generated (MWil) 524.580 3.145.790 41.921.302 500,158 2,978,886 39,704,059 i
- 18. Net Electrical Energy Generated (MWH)-
98.6
- 19. Unit Service Factor 52.2 68.8 98.6 52.2 68.8
- 20. Unit Availability Factor IUU.V bl./
b/.6
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 97.0 49.1 63.1
- 23. Unit Forced Outage Rate 0
10.8 4.4
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):
2 Refuelino. March 1984, 2 ranths
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Ferecast Achined j
INITI A L CRITICALITY
' INITIA L ELECTRICITY COMMERCIAL OPERATION 4
i (9/77) i
_m
...-4
,_.,,,,_,,_m.,m._._,._,,__,
DOCKETNO. 50-251 UNITSilUTDOWNS AND POWER REDUCTIONS UNITNAME Iyrkey Point Unit #4 DATE l-16-84 COMPLERD BY N W rn nt REPORT MONTif December, 1983 TEl,EPHOMB05_f ansi EE9 v75 w.
E c
.{g 3
jY5 Licensee gw,
{1, Cause & Corrective k
Dat e c.
E=
{
.s s 5 Event u?
c?
Action to S
j@
s jg Repori =
NC Prevent Recurrence 6
20 831203 S
10.1 H
1 ZZ ZZZZZZ Unit #4 removed ?from service to conduct integrated safeguards test for Unit #3 t
(
e I
2 3
4 f Forced Reason:
Method:
Exhibit G Instructions
% Scheduled A Lquipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report tLER) File (NUREG-D Regulatory Restriction g-Other (Explain) 0161) li-Operator Training & License Examination F Administrative G-Operational lirror ( F splain) s- _ / o a 4 4 ove.,..,/
Exlubit I Same Source l'8/77)
II-Ot her ( E xplain)
r-DUI@lARY OF OPERATING EXPERIENCE DOCKET NO.
50-251 UI{IT Turkey Pdint Unit #4 DATE January 16, 1984 COMPLETED BY N.W. Grant (305) 552-3675 TELEPHONE REPORT liONTH December,1983 Unit 4 operated at essentially fuil power except for a brief outage to con-duct the Unit 3 integrated safeguards test.
Major safety related maintenance activities included replacing a 120-140 VDC static inverter transformer.
Inspections and requirements of ID Bullentins and NUREG-0737 are continuing.
Florida Power & Light Company commitments to NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
=
O m
e r
eser - e
~
AVEllAGE D AILY UNIT POWER LEVEL
~
DOCKET NO.
St. Lucie #1 uggy DATE 1-16-84 N.W. G'ra nt COMPLETED BY -
TELEPilONE ~(305) 552-3575 December, 1983 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
-(MWe-Net )
I
((
~
2 18
~
3 19 4
20 5
~
21 6
22 7
23 8
24 9
25
~
~
10 26 11 27
~
12 28
~~
13 20 I4 30
~
~
15 31 16
~
INSTRUCTIONS On this format. list the aser.sge daily unit power lesel in MWe Nei for each day in the reporting in.inth. Conipuie io the nearest whole megawatt.
(9/77)
y 50-335 UNIT SifUTDOWNS AND POWER REDUCTIONS DOCKET NO.
dt. Lucie unit # 1 UNIT NAME DATE 1-16 e REPORT MONTH December. 1983 COMPLETED BY N kf Pira n t TELEPHONE (305) 552-3675 l
i 1
.i g 3
Y' Licensee jg Cause & Corrective o
M.
Date i
3=
4 2s5 Event gy g3 Action to f
E j ;lij g Report :
v> U L
H g
Prevent Recurrence 6
3 830226 S
744 C
4 RC FUELXX Unit #1 remained out of service for refueling and scheduled maintenance.
I 2
3 4
f Forced Reason:
Method:
Exhibit G - Instructions N Sched uled A Lyuipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scrarn.
Entry Sheets for Licensee C.Refuehng 3 Automatic Scram.
Event Report iLER) File (NUREG -
D Regulatory Restriction
%Other IExplain) 0161) lioperator Training & License Examination F Administrative p
5 C. Operational Error (F splain) 4_
/.o,co 4xove.,..cJ E xlubit I - Same Source 08/77) li-Ot her ( E xplain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-11s UNIT St. Luc.ie Unit'1 DATE January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305)552-3675 REPORT !!ONTH December,1983 St. Lucie Unit I remained out of service for a refueling and maintenance outage.
Major safety related maintenance included repairing a diesel generator lube oil soakback pump.
Inspections and requirements of IE Bulletin and NUREG-0737 are continuing.
Florida Power & Light Company commitments for NUREG-0737 implemenation are continuing.
Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of NUREG-0737 Ites II.K.3.3, there were no challenges to PORV or safety valves during the report month.
See correspondence between FPL and NRC for information concerning the thermal shield.
4 as W-T
AVER AGE DAILY UNIT POWER LEVEL
~
DOCKET NO.
UNIT St. Lucie #2 1-16-84 DATE COMPLETED BY '
N_W. Grant.
TELEPilONE (305L 552-3675 l
MONm December, 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)
. (ywe. Net )
812 528 I
l,e 811 813 2
18 3
810 19 812 809 815 4
20 5
R02 21
_816 807 815 6
22 7
809 23 815 790 764 8
24 9
779
- 25 817 815 816 to 26 818 ii 815 37 809 12 2S 818 017 13 814 29 814 817 14 30 i
814 818 15 3i 793 16 INSTRUCTIONS On this format, list the aser. ige daily unit power leselin MWe-Nei for cach day in the reporting anonth. Compute o
- the nearest whole megawaii.
(9/77) 7 r
..,-rr,,,
,,-..-,yr--,c.-w.
,..-.--,.-p
,,.,,y,,
wy.m_,,%,,r,
,--,---ry.-
,*v.wm,w-c.-
sw,+r-e'-w--w*
OPERATING DATA REPORT
~
'"Eli W%-
COMPLETED BY N.W. Grant TELEPliONE (305) 552-3675 OPERATING STATUS Notes Unit I remained out of
'ini + #1 n5"c4n55m E iqRj S
Ce for Mueling and
- 1. Unit Name:
c+
- 2. Reporting Period:
scheduled maintenance.
- 3. Licensed Thermal Power (MWt):
2700
- 4. Nameplate Rating (Gross MWe):
890 830
- 5. Design Electrical Rating (Net MWe):
867
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Iteins Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to-Date Cumul,itive 11; Hours In Reporting Period 744 8,760 61,608
- 12. Number Of Hours Reactor Was Critical 0
1,366.9 44,466.1 0
0 zuo.3
- 13. Reactor Reserve Shutdown llours g
- y a p ; ;; 7
- '~~~*~
' ~ ' ' ' ~ "
- 14. Hours Generator On-Line 0
0 M
- 15. Unit Reserve Shutdown 1(ours
- 16. Gross Thermal Energy Generated (MWH) 0 3,352,422 108,667,938
- 17. Gross Electrical Energy Generated (MWil) 0 1,160,280 35,373.875
- 3038 _,
1,070,082 33,334,Z/3
- 18. Net Electrical Energy Generated (MWH),
0 lb.4 7'O. 7
- 19. Unit Service Factor
- 20. Unit Availability Factor 0
15.4 70.8
- 21. Unit Capacity Factor (Using MDC Net) 0 14.9-68.6
- 22. Unit Capacity Factor (Using DER Net) 0 14.7 66.8 0
1*1 4.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Eachl:
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
SpM ng, 198a
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achineti INITIA L CRITICA LITY INITIA L ELECTRICITY COMM ERCIA L OPER ATION P)/771
OPERATING DATA REPORT DOCKET NO.
Rn.uo DATE 1 16.84 COMPLETED BY N.W. ru nt TELEPilONE (305)S52-3675 OPERATING STATUS
- 1. Unit Name:
St. Lucie Unit #2 Notes Unit 2 operated at December,1983 essentiallf full power except
- 2. Reporting Period:
2500 for a brief power reduction
- 3. Licensed Thermal Power (MWi):
- 4. Nameplate Rating (Gross MWe):
Yg
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 832 786
- 7. Maximum Dependable Capacity (Net MWe).
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
- 9. Power Lesel To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Eto-Date Cuomlatise 11; Hours In Reporting Period 744 3505 3505
- 12. Number Of Hours Reactor Was Critical 744 3227 3227
- 13. Reactor Reserve Shutdown Hours 0
0' 0
700 3130*O 3130 4
- 14. Hours Generator Un-Line U
U
_- - y
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWil)
I'N'hY9 I'bN'!bb
- 17. Gross Electrical Energy Generated (MWil) 2,397,586 2,397,586 595,247
- 18. Net Electrical Energy Generated (MWH)'
100.0 89.3 89.3
- 19. Unit Service Factor 100.0 89.T 89.3-
- 20. Unit Availability Factor 101.6 6/.T 87.0
- 21. Unit Capacity Factor (Using MDC Net) 9 9 *>
SS T 85.1
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
10.7 10.7
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Dor.n At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior 1o Commercial Operation):
Forecast A risined INITIA L CRITICA LITY
' INITIA L ELECTRICITY COMM ERCIAL OPER AllON These columns contain data from date of commercial operation only.
eum
m
- ~ ~ ~.
'~
UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.
50-189 UNIT NAME St. Lucie Unit 2 DATE l-16-84 COMPLETED BY N.W. Grant REf0RTMONm December,1983 TELEPHONE (305) 552-3675 "i
e'a 3-=
=
c.
a
.2 _:-
E
,.s 4 Licensee Cause & Corrective ce c
-o o
N" -
DJ' e i
55 5
.5 s 5 Event
?7 83 Action to
$5 jgg Report e G.' O V
Prevent Recurrence 6
,12 831216 F
0.0 B
5 CH FILTER Power reduced to clean main feedwater pump strainers.
l 3
4 f Forced Reason:
Method:
Exhibit G Instructions S Scheduled A Lquipment Failure (Explain)
- 1. Manual for Preparation of Data B. Maintenance of Test
- 2. Manual Scram.
Entry Sheets for Licensee C. Refueling
- 3. Automatic Scram.
Event Repor (LER) File (NUREG-D. Regulatory Restrietion SO her (Explain) 0161) li-Operator Training & License Examination F.Adtninistrative 5
G.Operatmnal 1:rror ( F splain) s _ /.o ao 44cyc.i..cl Exhibit 1 - Same Source t'8/77) 110 her(Explain) k a
v--
SUEMARY OF OPERATING EXPERIENCE DOCKET NO.
50-389 UNIT St. Lucie Unit #2 DATE January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REVORT MONTH necpmhar. 1983 Unit 2 operated at essiantially full p5wer except for a brief power reduction to clean main feed pump strainers.
Major safety related maintenance included adjusting charging pump accumul ato rs.
Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.
Florida Power & Light Company Commitments for NUREG-0737 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or -safety valves during the report month.
i l
o
i FLORIDA POWER & LIGHT COMPANY January 16. 1984 PNS-LI-84-20 Director, Office of Resource fianagement U. S. Nuclear Regulatcry Commission Washington, D. C. 20555
Dear Sir:
Attached are the December 1983 Operating Status Reports and Operating Summary, Reports for Turkey Point Units NO. 3 and 4 and St. Lucie Units No. I and 2.
Very truly yours, J. W. Williams, Jr.
Vice President Nuclear Energy Department JWM/NWG/cas Attachment cc:
J.P. O'Reilly, Region II 4
m I/
h' PEOPLE.. SERVING PEOPLE
__