ML20079M892

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1983
ML20079M892
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 12/31/1983
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PNS-LI-84-20, NUDOCS 8401270459
Download: ML20079M892 (17)


Text

  • 1 AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.  !

UNir Turkey Point #3 DATE l-16-84 COMPLETED BY ' N W. Gra nt TELEPilONE (305).552-3675 MONTH December, 1983' .

DAY AVERAGE DAILY FOWER LEVEL -

DAY AVER AGE DAILY POWER LEVEL (MWe Net) -(MWe Net)

I 17 2 18 .

3 19 4 20 -

5 21 6 -

22

~

7 23 --

8 24 9 25 10 26

~

.II -

27

'12 2S

- ~ ~

f 13 29 14 30

~

15 31 d

16 INSTRUCTIONS On this fonnat. list the ase:. ige daily unit power lesel in MWe Nei for each day in the reporting month. Compute to the nearest whole megawart.

(9/771 l

9401270459 831234 PDR ADOCK 05000250 R PDR 1 V

, _ . - , _ , - _ , m.,_ ,. __ _ , _ _ _ _ _ _ _ _ . ___ _ _ , , . _ . _ _ _ _ _ _ , , , , _ _ _ _ _ , . .

OPERATING DATA REPORT DOCKET NO. 50-250 DATE 1-16-84 COMPLETED BY NW Grant _.-

TELEPilONE (305)351.-3675 OPERATING STATt'S Turke_y Point Unit 33 Notes

1. Unit Name:

Dec om hpr-

2. Reporting Period: 10R7 Unit 3 remained out of
3. Licensed Thermal Power (MWt): 2.200 srrvice for refueling and
4. Nameplate Rating (Gross MWe): 760 scheduled maintenance.

S. Design Electrical Rating (Net MWe): 693

6. Maximum Dependable Capacity (Gross MWe): 700 .
7. Maximum Dependable Capacity (Net MWe): 666
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:  ;

This Month Yr.-to.Date Omnulative 11.' Hours In Reporting Period 744 8.760 97.065.6

12. Number Of Hours Reactor Was Critical 0 6,505.9 66,306.2
13. Reactor Reserve Shutdown Hours 0 0 844.4
14. Hoi,rs Generator O.i.Line 0 6,416.8 65,921.9 0 0 121_R
15. Unit Rewrve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWII) 0 14.070.680 135".488.592 -
17. Gross Electrical Energy Generated (MWII) 0 _. 4,584.575 43.210.565
18. Net Electrical Energy Generated (MWH)~ -4.125 4.325.465 40.913.017
19. Unit Senice Factor 0 73.3 67.9
20. Unit Availability Factor 0 73.3 68.0
21. Unit Capacity Factor (Using MDC Net) 0 75.0 65.1
22. Unit Capacity Factor (Using DER Net) 0 71.3 60.8
23. Unit Forced Outage Rate 0 2.0 5.4
24. Shutdowns Scheduled Os er Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup: January 7,1984 (actual)
26. Units In Test Status (Prior to Commercial Operation): Forecast At hit s ed INITIA L CRITICA LITY __

' INITI A L ELECTRICITY COMM ERCI A L OPER ATION _ __

(9/77)

y w g .

  • '~ s UNIT SilVTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 .

UNITNAME Turkev Point Unit #3 DATE. 1-16-84 COMPLETED BY N.W. Grant REPORT MONT)( n ecc ber, 1983 TELEPHONE (305)552-3H5 e.

. - 5 5

-, .! E 3 jYi Licensee Eg  % Cause & Corrective

b. Date H

i 3 ( 255 Event g? { Action to jE 5 35:

e Report = mV o U

Prevent Recurrence 6

J0 831001 s 744 C 4 RC FUELXX Unit #3 removed from service for re-fueling and scheduled maintenance.

(continued) t 2 3 4

  • F Forced Reason: Method: Exhibit G -Instructions S Scheduled A Lquipment Failure (Explain) l Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refuchng 3 Automatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction 9-Other (Explain) Ol6))

li-Operator Training & Ucense Examination

. F Administrative b O ' *"* " "' 5 G-Operatior at lirror (Fiplain) c _ /,o ao 44ove ,..,J Exhibit 1 Same Source t'8/77 ) Il Oiiv :1 Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO, ;n_pr;n _

UNIT Turkey Pof't n Unit #3 DATE January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT MONTH December, 1983 Unit 3 remained out of service for refueling and scheduled maintenance:

ftajor safety related maintenance activities included:

The unit was refueled for Cycle 9 Bent control rod drive shafts were replaced PORV's were overhauled A containment spray pump motor was repaired A steam header pressure instrument short circuit was repaired Several component cooling water heat exchanger tubes were plugged Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

G M

.-_._;_- _ . ~ _ _

AVEll AGE DAILY UNIT POWER LEVEL

- i j . .

a DOCKET NO. 50-251 UNIT Turkey Point #4 DATE l-16-84 COMPLETED BY - N.W . Gr' ant TELEPilONE (105).552-3675 i  :

MONm Derember, 1983 -

l

, .I DAY AVERAGE DAILY POWER LEVEL pay AVER AGE DAILY POWER LEVEL IMWe Net) -(MWe Net) 683 683

if

! 683 682 4

2 18 -

3 612 39 680 4 375 20 680  !

5 21 678 677 679

) 6 22

, 7 N 23 678 g 684 24 682 9

687 691 25 687 697 30 26

. 685 695

,, 2, 686 692 12 23 687 688 13 29 684 000 14 30 15 685 33 691 16 E 7 1

INSTRUCTIONS On this format. list the aserage daily unit power lesel in MWe Nei for cach day in the reporting inonth. Compute io the nestest whole twgawaii.

(9/77) t

. _. -= . - - _ - - . . _ _ - - . _ - _ _ - . ... - - - . _ _ _ .

~

OPERATLNG DATA REPORT DOCKET NO. . fig -251. ___

DATE 1 1A-R4 '

COMPLETED IlY N .t! . G .3nt TELEPilONE .{-305)552 3675 OPERATING STATUS Turkey Point #4 Notes Unit 4 operated at

1. Unit Name:
2. Reporting Period:

December,1983 essentially full power except

3. Licensed Thermal Power (MWI):

2200 for brief outage to conduct

4. Nameplate Rating (G.ross MWe):

/bu Unit 3 safeguard Test.

5. Design Electrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 700 .
7. Maximum Dependable Capacity (Net MWe): 666
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-t o-Date Cumulatise 11.' Hours in Reporting Period 744 8760 40.793

12. Number Of Hours Reactor Was Critical 737.1 4783.3 64,638.6
13. Resetor Reserve Shutdown !!ours 0- 0' 166.6
14. Hours Generator On.Line 733.7 4572.1 62,468.1 U U M'2
15. Unit Reserve Shutdown Qours
16. Gross Thermal Energy Generated (MWil) 1.614.?95 9.828,497 'l31,746.741
17. Gross Electrical Energy Generated (MWil) 524.580 __. 3.145.790 41.921.302 i
18. Net Electrical Energy Generated (MWH)- 500,158 2,978,886 39,704,059
19. Unit Service Factor 98.6 '

52.2 68.8

20. Unit Availability Factor 98.6 52.2 68.8
21. Unit Capacity Factor (Using MDC Net)

IUU.V bl./ b/.6

22. Unit Capacity Factor (Using DER Net) 97.0 .

49.1 63.1

23. Unit Forced Outage Rate 0 10.8 4.4
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):

2 Refuelino. March 1984, 2 ranths

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Ferecast Achined j INITI A L CRITICALITY

' INITIA L ELECTRICITY COMMERCIAL OPERATION _

4 .

i (9/77) i

. _m _

...-4 _ , . _ , , . . . ,_.,,,,_,,_m.,m._._,._,,__, _ _ . . . _ . _ , _ . , . _ , , . . . . . _ . _ _ _ . , _ . . . . . _ - . - . _ . . . . _ .__

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-251 .

UNITNAME Iyrkey Point Unit #4 DATE l-16-84 REPORT MONTif December, 1983 COMPLERD BY N W rn nt TEl,EPHOMB05_f ansi EE9 v75 w.

' -_ E c

, .{g 3 jY5 Licensee gw, {1, Cause & Corrective k Dat e c. E= { .s s 5 Event u? c? Action to S j@ s jg Repori = NC  !' Prevent Recurrence 6

20 831203 S 10.1 H 1 ZZ ZZZZZZ Unit #4 removed ?from service to conduct integrated safeguards test for Unit #3 t

(

e I 2 3 4 f Forced Reason: Method: Exhibit G Instructions

% Scheduled A Lquipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report tLER) File (NUREG-D Regulatory Restriction g-Other (Explain) 0161) li-Operator Training & License Examination

, F Administrative ,

G-Operational lirror ( F splain) s- _ / o a 4 4 ove.,.. ,/ Exlubit I Same Source l'8/77) II-Ot her ( E xplain)

r-DUI@lARY OF OPERATING EXPERIENCE DOCKET NO. 50-251 UI{IT Turkey Pdint Unit #4 DATE ,

January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT liONTH December,1983 Unit 4 operated at essentially fuil power except for a brief outage to con-duct the Unit 3 integrated safeguards test.

Major safety related maintenance activities included replacing a 120-140 VDC static inverter transformer.

Inspections and requirements of ID Bullentins and NUREG-0737 are continuing.

Florida Power & Light Company commitments to NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

=

O m e r - -

  • ~

AVEllAGE D AILY UNIT POWER LEVEL

~

DOCKET NO.

uggy St. Lucie #1 DATE 1-16-84 COMPLETED BY - N.W. G'ra nt

. TELEPilONE ~(305) 552-3575 MONTH December, 1983 -

DAY AVERAGE DAILY POWER LEVEL '

DAY AVER AGE DAILY POWER LEVEL (MWe Net) -(MWe-Net )

~

I ((

2 18 .

~

3 19 4 -

20

~

5 21 6 22 7 23 8 24

~

9 25

~

10 26

~

11 27 12 28

- ~~

13 20

~

I4 -

30

~

15 31

~

16 INSTRUCTIONS On this format. list the aser.sge daily unit power lesel in MWe Nei for each day in the reporting in.inth. Conipuie io the nearest whole megawatt.

(9/77)

y - -- -

DOCKET NO.

50-335 ,

UNIT SifUTDOWNS AND POWER REDUCTIONS dt. Lucie unit # 1 UNIT NAME DATE 1-16 e December. 1983 COMPLETED BY N kf Pira n t REPORT MONTH TELEPHONE (305) 552-3675 l

i 1 _

, .i g 3 Y' Licensee jg o Cause & Corrective M. Date i

H 3= 4 2s5 Event gy g3L Action to f E j ;lij g Report : v> U g Prevent Recurrence 6

3 830226 S 744 C 4 RC FUELXX Unit #1 remained out of service for

< refueling and scheduled maintenance.

I 2 3 4

  • f Forced Reason: Method: Exhibit G - Instructions N Sched uled '

A Lyuipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scrarn. Entry Sheets for Licensee C.Refuehng 3 Automatic Scram. Event Report iLER) File (NUREG -

D Regulatory Restriction %Other IExplain) 0161) lioperator Training & License Examination

. F Administrative p ,

5 C. Operational Error (F splain) 4_ /.o ,co 4xove.,..cJ E xlubit I - Same Source 08/77) li-Ot her ( E xplain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-11s UNIT St. Luc.ie Unit'1 DATE January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305)552-3675 REPORT !!ONTH December ,1983 St. Lucie Unit I remained out of service for a refueling and maintenance outage. -

Major safety related maintenance included repairing a diesel generator lube oil soakback pump.

Inspections and requirements of IE Bulletin and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implemenation are continuing. Refer to correspondence between FPL and NRC for additional information. .

In accordance with requirements of NUREG-0737 Ites II.K.3.3, there were no challenges to PORV or safety valves during the report month.

See correspondence between FPL and NRC for information concerning the thermal shield.

4

__as W-T

AVER AGE DAILY UNIT POWER LEVEL

' ~

DOCKET NO.

UNIT St. Lucie #2 _

DATE 1-16-84 COMPLETED BY ' N_W. Grant .

. TELEPilONE (305L 552-3675 l

MONm December, 1983 .

DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net) . (ywe. Net )

812 . -

528 I l ,e 811 813 2 18 ,

3 810 19 812 809 815 4 20 5 R02 21 _816 6 807 22 815 7 809 23 - - 815 8 790 24 764 9 779 - 25 817 815 816 to 26 815 818 ii 37 809 818 12 2S 13 814 29 017 814 817 14 30 i 15 814 3i 818 793 -

16 INSTRUCTIONS On this format, list the aser. ige daily unit power leselin MWe-Nei for cach day in the reporting anonth. Compute o

- the nearest whole megawaii.

(9/77) 7

,-- r ..,.,-,....-% ..,-rr,,, ,,-..-,yr--,c.-w. , ,..-.--,.-p . ,,.,,y,, wy.m_,,%,,r, ,--,---ry.- ,*v.wm,w-c.- -

sw,+r-e'-w--w*

~

OPERATING DATA REPORT COMPLETED BY

'"Eli W%- N.W. Grant TELEPliONE (305) 552-3675 OPERATING STATUS

1. Unit Name: c+ ' 'ini + #1 Notes Unit I remained out of n5"c4n55m E iqRj S Ce for Mueling and
2. Reporting Period:

2700 scheduled maintenance.

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 890
5. Design Electrical Rating (Net MWe): 830 867 .
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Iteins Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any: ,

This Month Yr.-to-Date Cumul,itive 11; Hours In Reporting Period 744 8,760 61,608

12. Number Of Hours Reactor Was Critical 0 1,366.9 44,466.1
13. Reactor Reserve Shutdown llours 0 0 zuo.3 g ;y a p ; ;; 7
  • *'~~~*~ ' ~ ' ' ' ~ "
14. Hours Generator On-Line 0 0 M
15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWH) 0 3,352,422 108,667,938 .
17. Gross Electrical Energy Generated (MWil) 0 1,160,280 35,373.875

- 3038 _, 1,070,082 33,334,Z/3

18. Net Electrical Energy Generated (MWH),
19. Unit Service Factor 0 lb.4 7'O . 7
20. Unit Availability Factor 0 15.4 70.8
21. Unit Capacity Factor (Using MDC Net) 0 14.9- 68.6
22. Unit Capacity Factor (Using DER Net) 0 14.7 66.8
23. Unit Forced Outage Rate 0 1*1 4.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Eachl:
25. If Shut Down At End Of Report Period, Estimated Date of Startup: SpM ng, 198a
26. Units in Test Status (Prior to Commercial Operation): Forecast Achineti INITIA L CRITICA LITY INITIA L ELECTRICITY COMM ERCIA L OPER ATION P)/771

OPERATING DATA REPORT DOCKET NO. Rn.uo DATE 1 16.84 COMPLETED BY N.W. ru nt TELEPilONE (305)S52-3675 OPERATING STATUS St. Lucie Unit #2 Notes Unit 2 operated at

1. Unit Name:
2. Reporting Period:

December,1983 essentiallf full power except 2500 for a brief power reduction

3. Licensed Thermal Power (MWi):
4. Nameplate Rating (Gross MWe): Y g
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 832 -
7. Maximum Dependable Capacity (Net MWe). 786
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
9. Power Lesel To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Eto-Date Cuomlatise 11; Hours In Reporting Period 744 3505 3505

12. Number Of Hours Reactor Was Critical 744 3227 3227
13. Reactor Reserve Shutdown Hours 0 0' 0
14. Hours Generator Un-Line 700 3130*O 3130 4
15. Unit Reserve Shutdown Hours' U U _- - y
16. Gross Thermal Energy Generated (MWil) I'N'hY9 I'bN'!bb ' '# -
17. Gross Electrical Energy Generated (MWil)
18. Net Electrical Energy Generated (MWH)' 595,247 2,397,586 2,397,586
19. Unit Service Factor 100.0 89.3 89.3
20. Unit Availability Factor 100.0 89.T 89.3-
21. Unit Capacity Factor (Using MDC Net) 101.6 6/.T 87.0
22. Unit Capacity Factor (Using DER Net) 9 9 *> SS T 85.1
23. Unit Forced Outage Rate 0 10.7 10.7
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Dor.n At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior 1o Commercial Operation): Forecast A risined INITIA L CRITICA LITY __

' INITIA L ELECTRICITY _

COMM ERCIAL OPER AllON _

These columns contain data from date of commercial operation only. eum

, m , *~~~.

'~

UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-189 .

UNIT NAME St. Lucie Unit 2 DATE l-16-84 COMPLETED BY N .W. Grant REf0RTMONm December,1983 TELEPHONE (305) 552-3675

. "i -

= c. 3-= a .

ce, e'a

-o .2 _:- E , .s 4 Licensee c o Cause & Corrective N" - DJ' e i 55 5 .5 s 5 Event ?7 83V Action to

$5 $ jgg Report e G.' O Prevent Recurrence 6

,12 831216 F 0.0 B 5 CH FILTER Power reduced to clean main feedwater pump strainers.

l 3 4

  • f Forced Reason: Method: Exhibit G Instructions S Scheduled A Lquipment Failure (Explain) 1. Manual for Preparation of Data B. Maintenance of Test 2. Manual Scram. Entry Sheets for Licensee C. Refueling 3. Automatic Scram. Event Repor (LER) File (NUREG-D. Regulatory Restrietion SO her (Explain) 0161) li-Operator Training & License Examination

, F.Adtninistrative ,

5 G.Operatmnal 1:rror ( F splain) s _ /.o ao 44cyc.i..cl Exhibit 1 - Same Source t'8/77) 110 her(Explain) k a

v--

SUEMARY OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St. Lucie Unit #2 -

DATE January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REVORT MONTH necpmhar. 1983 Unit 2 operated at essiantially full p5wer except for a brief power reduction to clean main feed pump strainers.

Major safety related maintenance included adjusting charging pump accumul ato rs.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company Commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or -safety valves during the report month.

i l

o

, i FLORIDA POWER & LIGHT COMPANY January 16. 1984 PNS-LI-84-20 Director, Office of Resource fianagement U. S. Nuclear Regulatcry Commission Washington, D. C. 20555

Dear Sir:

Attached are the December 1983 Operating Status Reports and Operating Summary, Reports for Turkey Point Units NO. 3 and 4 and St. Lucie Units No. I and 2.

Very truly yours, J. W. Williams, Jr.

Vice President Nuclear Energy Department JWM/NWG/cas Attachment cc: J.P. O'Reilly, Region II m4 I/

& h' PEOPLE. . SERVING PEOPLE

_ . . . , . _ _. _ __