ML20079M892

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1983
ML20079M892
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 12/31/1983
From: Grant N, Williams J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PNS-LI-84-20, NUDOCS 8401270459
Download: ML20079M892 (17)


Text

1 AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.

UNir Turkey Point #3 l-16-84 DATE COMPLETED BY '

N W. Gra nt TELEPilONE (305).552-3675 December, 1983' MONTH DAY AVERAGE DAILY FOWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

-(MWe Net)

I 17 2

18 3

19 4

20 5

21 6

22

~

7 23 8

24 9

25 10 26

.II 27

~

'12 2S f

29

~

~

13 14 30

~

15 31 d

16 INSTRUCTIONS On this fonnat. list the ase:. ige daily unit power lesel in MWe Nei for each day in the reporting month. Compute to the nearest whole megawart.

(9/771 l

9401270459 831234 PDR ADOCK 05000250 R

PDR 1 V m.,_

OPERATING DATA REPORT 50-250 DOCKET NO.

DATE 1-16-84 COMPLETED BY NW Grant _.-

TELEPilONE (305)351.-3675 OPERATING STATt'S

1. Unit Name:

Turke_y Point Unit 33 Notes

2. Reporting Period:

Dec om hpr-10R7 Unit 3 remained out of

3. Licensed Thermal Power (MWt):

2.200 srrvice for refueling and

4. Nameplate Rating (Gross MWe):

760 scheduled maintenance.

693 S. Design Electrical Rating (Net MWe):

700

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

666

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-to.Date Omnulative 11.' Hours In Reporting Period 744 8.760 97.065.6

12. Number Of Hours Reactor Was Critical 0

6,505.9 66,306.2 0

0 844.4

13. Reactor Reserve Shutdown Hours
14. Hoi,rs Generator O.i.Line 0

6,416.8 65,921.9

15. Unit Rewrve Shutdown 1(ours 0

0 121_R

16. Gross Thermal Energy Generated (MWII) 0 14.070.680 135".488.592
17. Gross Electrical Energy Generated (MWII) 0 _.

4,584.575 43.210.565

-4.125 4.325.465 40.913.017

18. Net Electrical Energy Generated (MWH)~

0 73.3 67.9

19. Unit Senice Factor 0

73.3 68.0

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 0 75.0 65.1
22. Unit Capacity Factor (Using DER Net) 0 71.3 60.8
23. Unit Forced Outage Rate 0

2.0 5.4

24. Shutdowns Scheduled Os er Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

January 7,1984 (actual)

26. Units In Test Status (Prior to Commercial Operation):

Forecast At hit s ed INITIA L CRITICA LITY

' INITI A L ELECTRICITY COMM ERCI A L OPER ATION (9/77)

y w

g

'~

s UNIT SilVTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-250 UNITNAME Turkev Point Unit #3 DATE. 1-16-84 COMPLETED BY N.W. Grant REPORT MONT)( necc ber, 1983 TELEPHONE (305)552-3H5 e.

5 5

.! E 3

jYi Licensee Eg Cause & Corrective b.

Date i

3

(

255 Event g?

{

Action to jE 5

35:

Report =

mV Prevent Recurrence H

o U

e 6

J0 831001 s

744 C

4 RC FUELXX Unit #3 removed from service for re-fueling and scheduled maintenance.

(continued) t 2

3 4

F Forced Reason:

Method:

Exhibit G -Instructions S Scheduled A Lquipment Failure (Explain) l Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refuchng 3 Automatic Scram.

Event Report (LER) File (NUREG.

D Regulatory Restriction 9-Other (Explain)

Ol6))

li-Operator Training & Ucense Examination F Administrative b O ' *"* " "'

5 G-Operatior at lirror (Fiplain) c _ /,o ao 44ove

,..,J Exhibit 1 Same Source t'8/77 )

Il Oiiv :1 Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO,

n_pr;n UNIT Turkey Pof't Unit #3 n

DATE January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT MONTH December, 1983 Unit 3 remained out of service for refueling and scheduled maintenance:

ftajor safety related maintenance activities included:

The unit was refueled for Cycle 9 Bent control rod drive shafts were replaced PORV's were overhauled A containment spray pump motor was repaired A steam header pressure instrument short circuit was repaired Several component cooling water heat exchanger tubes were plugged Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

G M

.-_._;_- _. ~ _ _

AVEll AGE DAILY UNIT POWER LEVEL i

j a

50-251 DOCKET NO.

UNIT Turkey Point #4 l-16-84 DATE N.W. Gr' ant COMPLETED BY -

TELEPilONE (105).552-3675 i

l MONm Derember, 1983

.I DAY AVERAGE DAILY POWER LEVEL pay AVER AGE DAILY POWER LEVEL IMWe Net)

-(MWe Net) 683 if 683 683 682 2

18 4

680 3

612 39 680 375 20 4

5 21 678

)

677 679 6

22 678 7

N 23 684 682 g

24 687 691 9

25 687 697 30 26 685 695 2,

686 692 12 23 13 687 688 29 684 000 14 30 15 685 33 691 E

7 16 1

INSTRUCTIONS On this format. list the aserage daily unit power lesel in MWe Nei for cach day in the reporting inonth. Compute io the nestest whole twgawaii.

(9/77) t

. _. -=

OPERATLNG DATA REPORT

~

DOCKET NO.. fig -251. ___

DATE 1 1A-R4 COMPLETED IlY N.t!. G.3nt TELEPilONE.{-305)552 3675 OPERATING STATUS

1. Unit Name:

Turkey Point #4 Notes Unit 4 operated at December,1983 essentially full power except

2. Reporting Period:

2200 for brief outage to conduct

3. Licensed Thermal Power (MWI):

/bu Unit 3 safeguard Test.

4. Nameplate Rating (G.ross MWe):

693

5. Design Electrical Rating (Net MWe):

700

6. Maximum Dependable Capacity (Gross MWe):

666

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report,Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-t o-Date Cumulatise 11.' Hours in Reporting Period 744 8760 40.793

12. Number Of Hours Reactor Was Critical 737.1 4783.3 64,638.6
13. Resetor Reserve Shutdown !!ours 0-0' 166.6
14. Hours Generator On.Line 733.7 4572.1 62,468.1 U

U M'2

15. Unit Reserve Shutdown Qours
16. Gross Thermal Energy Generated (MWil) 1.614.?95 9.828,497

'l31,746.741

17. Gross Electrical Energy Generated (MWil) 524.580 3.145.790 41.921.302 500,158 2,978,886 39,704,059 i
18. Net Electrical Energy Generated (MWH)-

98.6

19. Unit Service Factor 52.2 68.8 98.6 52.2 68.8
20. Unit Availability Factor IUU.V bl./

b/.6

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 97.0 49.1 63.1
23. Unit Forced Outage Rate 0

10.8 4.4

24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each):

2 Refuelino. March 1984, 2 ranths

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Ferecast Achined j

INITI A L CRITICALITY

' INITIA L ELECTRICITY COMMERCIAL OPERATION 4

i (9/77) i

_m

...-4

,_.,,,,_,,_m.,m._._,._,,__,

DOCKETNO. 50-251 UNITSilUTDOWNS AND POWER REDUCTIONS UNITNAME Iyrkey Point Unit #4 DATE l-16-84 COMPLERD BY N W rn nt REPORT MONTif December, 1983 TEl,EPHOMB05_f ansi EE9 v75 w.

E c

.{g 3

jY5 Licensee gw,

{1, Cause & Corrective k

Dat e c.

E=

{

.s s 5 Event u?

c?

Action to S

j@

s jg Repori =

NC Prevent Recurrence 6

20 831203 S

10.1 H

1 ZZ ZZZZZZ Unit #4 removed ?from service to conduct integrated safeguards test for Unit #3 t

(

e I

2 3

4 f Forced Reason:

Method:

Exhibit G Instructions

% Scheduled A Lquipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report tLER) File (NUREG-D Regulatory Restriction g-Other (Explain) 0161) li-Operator Training & License Examination F Administrative G-Operational lirror ( F splain) s- _ / o a 4 4 ove.,..,/

Exlubit I Same Source l'8/77)

II-Ot her ( E xplain)

r-DUI@lARY OF OPERATING EXPERIENCE DOCKET NO.

50-251 UI{IT Turkey Pdint Unit #4 DATE January 16, 1984 COMPLETED BY N.W. Grant (305) 552-3675 TELEPHONE REPORT liONTH December,1983 Unit 4 operated at essentially fuil power except for a brief outage to con-duct the Unit 3 integrated safeguards test.

Major safety related maintenance activities included replacing a 120-140 VDC static inverter transformer.

Inspections and requirements of ID Bullentins and NUREG-0737 are continuing.

Florida Power & Light Company commitments to NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

=

O m

e r

eser - e

~

AVEllAGE D AILY UNIT POWER LEVEL

~

DOCKET NO.

St. Lucie #1 uggy DATE 1-16-84 N.W. G'ra nt COMPLETED BY -

TELEPilONE ~(305) 552-3575 December, 1983 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

-(MWe-Net )

I

((

~

2 18

~

3 19 4

20 5

~

21 6

22 7

23 8

24 9

25

~

~

10 26 11 27

~

12 28

~~

13 20 I4 30

~

~

15 31 16

~

INSTRUCTIONS On this format. list the aser.sge daily unit power lesel in MWe Nei for each day in the reporting in.inth. Conipuie io the nearest whole megawatt.

(9/77)

y 50-335 UNIT SifUTDOWNS AND POWER REDUCTIONS DOCKET NO.

dt. Lucie unit # 1 UNIT NAME DATE 1-16 e REPORT MONTH December. 1983 COMPLETED BY N kf Pira n t TELEPHONE (305) 552-3675 l

i 1

.i g 3

Y' Licensee jg Cause & Corrective o

M.

Date i

3=

4 2s5 Event gy g3 Action to f

E j ;lij g Report :

v> U L

H g

Prevent Recurrence 6

3 830226 S

744 C

4 RC FUELXX Unit #1 remained out of service for refueling and scheduled maintenance.

I 2

3 4

f Forced Reason:

Method:

Exhibit G - Instructions N Sched uled A Lyuipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scrarn.

Entry Sheets for Licensee C.Refuehng 3 Automatic Scram.

Event Report iLER) File (NUREG -

D Regulatory Restriction

%Other IExplain) 0161) lioperator Training & License Examination F Administrative p

5 C. Operational Error (F splain) 4_

/.o,co 4xove.,..cJ E xlubit I - Same Source 08/77) li-Ot her ( E xplain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-11s UNIT St. Luc.ie Unit'1 DATE January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305)552-3675 REPORT !!ONTH December,1983 St. Lucie Unit I remained out of service for a refueling and maintenance outage.

Major safety related maintenance included repairing a diesel generator lube oil soakback pump.

Inspections and requirements of IE Bulletin and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implemenation are continuing.

Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of NUREG-0737 Ites II.K.3.3, there were no challenges to PORV or safety valves during the report month.

See correspondence between FPL and NRC for information concerning the thermal shield.

4 as W-T

AVER AGE DAILY UNIT POWER LEVEL

~

DOCKET NO.

UNIT St. Lucie #2 1-16-84 DATE COMPLETED BY '

N_W. Grant.

TELEPilONE (305L 552-3675 l

MONm December, 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Net)

. (ywe. Net )

812 528 I

l,e 811 813 2

18 3

810 19 812 809 815 4

20 5

R02 21

_816 807 815 6

22 7

809 23 815 790 764 8

24 9

779

- 25 817 815 816 to 26 818 ii 815 37 809 12 2S 818 017 13 814 29 814 817 14 30 i

814 818 15 3i 793 16 INSTRUCTIONS On this format, list the aser. ige daily unit power leselin MWe-Nei for cach day in the reporting anonth. Compute o

- the nearest whole megawaii.

(9/77) 7 r

..,-rr,,,

,,-..-,yr--,c.-w.

,..-.--,.-p

,,.,,y,,

wy.m_,,%,,r,

,--,---ry.-

,*v.wm,w-c.-

sw,+r-e'-w--w*

OPERATING DATA REPORT

~

'"Eli W%-

COMPLETED BY N.W. Grant TELEPliONE (305) 552-3675 OPERATING STATUS Notes Unit I remained out of

'ini + #1 n5"c4n55m E iqRj S

Ce for Mueling and

1. Unit Name:

c+

2. Reporting Period:

scheduled maintenance.

3. Licensed Thermal Power (MWt):

2700

4. Nameplate Rating (Gross MWe):

890 830

5. Design Electrical Rating (Net MWe):

867

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Iteins Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-to-Date Cumul,itive 11; Hours In Reporting Period 744 8,760 61,608

12. Number Of Hours Reactor Was Critical 0

1,366.9 44,466.1 0

0 zuo.3

13. Reactor Reserve Shutdown llours g
y a p ; ;; 7
  • '~~~*~

' ~ ' ' ' ~ "

14. Hours Generator On-Line 0

0 M

15. Unit Reserve Shutdown 1(ours
16. Gross Thermal Energy Generated (MWH) 0 3,352,422 108,667,938
17. Gross Electrical Energy Generated (MWil) 0 1,160,280 35,373.875

- 3038 _,

1,070,082 33,334,Z/3

18. Net Electrical Energy Generated (MWH),

0 lb.4 7'O. 7

19. Unit Service Factor
20. Unit Availability Factor 0

15.4 70.8

21. Unit Capacity Factor (Using MDC Net) 0 14.9-68.6
22. Unit Capacity Factor (Using DER Net) 0 14.7 66.8 0

1*1 4.6

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Eachl:
25. If Shut Down At End Of Report Period, Estimated Date of Startup:

SpM ng, 198a

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achineti INITIA L CRITICA LITY INITIA L ELECTRICITY COMM ERCIA L OPER ATION P)/771

OPERATING DATA REPORT DOCKET NO.

Rn.uo DATE 1 16.84 COMPLETED BY N.W. ru nt TELEPilONE (305)S52-3675 OPERATING STATUS

1. Unit Name:

St. Lucie Unit #2 Notes Unit 2 operated at December,1983 essentiallf full power except

2. Reporting Period:

2500 for a brief power reduction

3. Licensed Thermal Power (MWi):
4. Nameplate Rating (Gross MWe):

Yg

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 832 786
7. Maximum Dependable Capacity (Net MWe).
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report. Give Reasons:
9. Power Lesel To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Eto-Date Cuomlatise 11; Hours In Reporting Period 744 3505 3505

12. Number Of Hours Reactor Was Critical 744 3227 3227
13. Reactor Reserve Shutdown Hours 0

0' 0

700 3130*O 3130 4

14. Hours Generator Un-Line U

U

_- - y

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWil)

I'N'hY9 I'bN'!bb

17. Gross Electrical Energy Generated (MWil) 2,397,586 2,397,586 595,247
18. Net Electrical Energy Generated (MWH)'

100.0 89.3 89.3

19. Unit Service Factor 100.0 89.T 89.3-
20. Unit Availability Factor 101.6 6/.T 87.0
21. Unit Capacity Factor (Using MDC Net) 9 9 *>

SS T 85.1

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

10.7 10.7

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Dor.n At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior 1o Commercial Operation):

Forecast A risined INITIA L CRITICA LITY

' INITIA L ELECTRICITY COMM ERCIAL OPER AllON These columns contain data from date of commercial operation only.

eum

m

  • ~ ~ ~.

'~

UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.

50-189 UNIT NAME St. Lucie Unit 2 DATE l-16-84 COMPLETED BY N.W. Grant REf0RTMONm December,1983 TELEPHONE (305) 552-3675 "i

e'a 3-=

=

c.

a

.2 _:-

E

,.s 4 Licensee Cause & Corrective ce c

-o o

N" -

DJ' e i

55 5

.5 s 5 Event

?7 83 Action to

$5 jgg Report e G.' O V

Prevent Recurrence 6

,12 831216 F

0.0 B

5 CH FILTER Power reduced to clean main feedwater pump strainers.

l 3

4 f Forced Reason:

Method:

Exhibit G Instructions S Scheduled A Lquipment Failure (Explain)

1. Manual for Preparation of Data B. Maintenance of Test
2. Manual Scram.

Entry Sheets for Licensee C. Refueling

3. Automatic Scram.

Event Repor (LER) File (NUREG-D. Regulatory Restrietion SO her (Explain) 0161) li-Operator Training & License Examination F.Adtninistrative 5

G.Operatmnal 1:rror ( F splain) s _ /.o ao 44cyc.i..cl Exhibit 1 - Same Source t'8/77) 110 her(Explain) k a

v--

SUEMARY OF OPERATING EXPERIENCE DOCKET NO.

50-389 UNIT St. Lucie Unit #2 DATE January 16, 1984 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REVORT MONTH necpmhar. 1983 Unit 2 operated at essiantially full p5wer except for a brief power reduction to clean main feed pump strainers.

Major safety related maintenance included adjusting charging pump accumul ato rs.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company Commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or -safety valves during the report month.

i l

o

i FLORIDA POWER & LIGHT COMPANY January 16. 1984 PNS-LI-84-20 Director, Office of Resource fianagement U. S. Nuclear Regulatcry Commission Washington, D. C. 20555

Dear Sir:

Attached are the December 1983 Operating Status Reports and Operating Summary, Reports for Turkey Point Units NO. 3 and 4 and St. Lucie Units No. I and 2.

Very truly yours, J. W. Williams, Jr.

Vice President Nuclear Energy Department JWM/NWG/cas Attachment cc:

J.P. O'Reilly, Region II 4

m I/

h' PEOPLE.. SERVING PEOPLE

__