Revised Monthly Operating Rept for Apr 1983
ML20079M642
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/30/1983
From: Gabe Taylor
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20079M626 List:
References
NUDOCS 8401270382
Download: ML20079M642 (2)


Text

E REVISED PAGE - JANUARY 13, 1984 Director, Office of Resource Management April Monthly Operating Report

Page 3 May 9, 1983 A'ITACHMD4T II OPERATING DATA REPORT DOCKET NO.

50/395 UNIT V. C. SUMMER I DATE 05/09/83 COMPLEITD BY G. J. TAYlDR TELEPHONE (803) 345-5209 OPERATING STA'IUS

1. Reporting Period:

APRIL 1983 Gross Hours in Reporting Period:

719

2. Currently Authorized Power Level (MWt):

2775 Max. Depend. Capacity-(MWe-Net):

N/A Design Electrical Rating (MWe-Net):

900

3. Power Level to which restricted (If Any)(MWe-Net):

50% of Full Power

4. Reasons for Restrictions (If Any): 'Ibe ' operating license allows operations to 50% Full Power as well as limited intervals of operations above 507, for Power

~

Operations Testing.

'IHIS PON'IH YR 'IO DATE CUMULATIVE

5. Number of Hours Reactor Was Critical 0

1800.9 3107 7

6. Reactor Reserve Shutdown Hours 0

0 0

7. Hours Generator on Line 0

1762.1 2523.4

8. Unit Reserve Shutdown Hours 0

0 0

9. Gross Thermal Energy Generated (MWH) 0 2,386,681 3,182,554
10. Gross Electrical Energy Generated (MWH) 0 770,612 986,829
11. Net Electrical Energy Generated (MWH) 0 712,737 903,933
12. Reactor Service Factor N/A N/A N/A
13. Reactor Availability Factor N/A N/A N/A
14. Unit Service Factor N/A N/A N/A
15. Unit Availability Factor N/A N/A N/A

'16. Unit Capacity Factor (Using MDC)

N/A N/A N/A

17. Unit Capacity Factor-(Using Design MWe)

N/A N/A N/A

18. Unit Forced Outage Rate N/A N/A N/A
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Westinghouse Model D-3 Steam Generator Modification - March 17 thru May,1983.

20.-If Shut Down at End of Report Period, Estimated Date of Startup:

05/18/83

21. Units in Test Status (Prior to Comerical Operation):

FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initial Electricity 11-17-82 11-16-82 Comercial Operation 8401270382 840113 PDR ADOCK 05000395 R

PDR-t

REVISED PAGE -- JANUARY 13, 1984 Director, Office of Resource Management-

~

April Monthly Operating Report Page 4 May 9, 1983 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50/395 UNIT V.

C. SUMMER I DATE 05/09/83 COMPLETED BY G.

J.

TAYLOR TELEPHONE (803) 345-5209 (1)

METHOD OF (2)

TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS /

NO.

DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER COMMENTS 7

830317 S

720.0 H

1

7) Reactor Shutdown for D-3 Steam Generator Modification.