E REVISED PAGE - JANUARY 13, 1984 Director, Office of Resource Management April Monthly Operating Report
- Page 3 May 9, 1983 A'ITACHMD4T II OPERATING DATA REPORT DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 05/09/83 COMPLEITD BY G. J. TAYlDR TELEPHONE (803) 345-5209 OPERATING STA'IUS
- 1. Reporting Period:
APRIL 1983 Gross Hours in Reporting Period:
719
- 2. Currently Authorized Power Level (MWt):
2775 Max. Depend. Capacity-(MWe-Net):
N/A Design Electrical Rating (MWe-Net):
900
- 3. Power Level to which restricted (If Any)(MWe-Net):
50% of Full Power
- 4. Reasons for Restrictions (If Any): 'Ibe ' operating license allows operations to 50% Full Power as well as limited intervals of operations above 507, for Power
~
Operations Testing.
'IHIS PON'IH YR 'IO DATE CUMULATIVE
- 5. Number of Hours Reactor Was Critical 0
1800.9 3107 7
- 6. Reactor Reserve Shutdown Hours 0
0 0
- 7. Hours Generator on Line 0
1762.1 2523.4
- 8. Unit Reserve Shutdown Hours 0
0 0
- 9. Gross Thermal Energy Generated (MWH) 0 2,386,681 3,182,554
- 10. Gross Electrical Energy Generated (MWH) 0 770,612 986,829
- 11. Net Electrical Energy Generated (MWH) 0 712,737 903,933
- 12. Reactor Service Factor N/A N/A N/A
- 13. Reactor Availability Factor N/A N/A N/A
- 14. Unit Service Factor N/A N/A N/A
- 15. Unit Availability Factor N/A N/A N/A
'16. Unit Capacity Factor (Using MDC)
N/A N/A N/A
- 17. Unit Capacity Factor-(Using Design MWe)
N/A N/A N/A
- 18. Unit Forced Outage Rate N/A N/A N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Westinghouse Model D-3 Steam Generator Modification - March 17 thru May,1983.
20.-If Shut Down at End of Report Period, Estimated Date of Startup:
05/18/83
- 21. Units in Test Status (Prior to Comerical Operation):
FORECAST ACHIEVED Initial Criticality 10-20-82 10-22-82 Initial Electricity 11-17-82 11-16-82 Comercial Operation 8401270382 840113 PDR ADOCK 05000395 R
PDR-t
REVISED PAGE -- JANUARY 13, 1984 Director, Office of Resource Management-
~
April Monthly Operating Report Page 4 May 9, 1983 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50/395 UNIT V.
C. SUMMER I DATE 05/09/83 COMPLETED BY G.
J.
TAYLOR TELEPHONE (803) 345-5209 (1)
METHOD OF (2)
TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS /
NO.
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER COMMENTS 7
830317 S
720.0 H
1
- 7) Reactor Shutdown for D-3 Steam Generator Modification.