MONTHYEARML20210R8051999-08-10010 August 1999 Startup Test Rept for Cycle 7 ML20210K3631999-07-30030 July 1999 Marked-up & Revised TS Bases Page B 3/4 5-2 Re ECCS ML20196G3671999-06-23023 June 1999 Proposed Tech Specs Increasing AOT for Crac from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on- Line Implementation of Design Enhancements During Current Operating Cycle ML20198E7411998-12-16016 December 1998 Proposed Tech Specs Pages Re LAR-98-15,involving Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements Manual ML20198E7831998-12-16016 December 1998 Proposed Tech Specs Pages to LAR 98-09,re Editorial & Administrative Changes to TS ML20155J1821998-11-0404 November 1998 Proposed Tech Specs 4.5.2b.1,removing Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water ML20249B4181998-06-17017 June 1998 Proposed Tech Specs 3.7.6 Re Control Room Emergency Makeup Air & Filtration Subsystem ML20247R7021998-05-20020 May 1998 Proposed Tech Specs Re Rev of Refueling Water Storage Tank low-low Level Setpoint ML20217E8871998-04-22022 April 1998 Proposed Tech Specs Re Surveillance Intervals to Accommodate 24-month Fuel Cycle,Per GL 91-04 ML20217F9651998-04-21021 April 1998 Proposed Tech Specs Page 3/4 5-5 Re Venting of Operating Chemical Vol & Control Sys Centrifugal Charging Pump ML20216C5921998-04-0808 April 1998 Proposed Tech Specs Changing Surveillance Intervals to Accommodate 24-month Fuel Cycle Per GL 91-04 ML20217Q2981998-04-0303 April 1998 Proposed Tech Specs Pages Re LAR 98-02,proposing Changes to TS to Accommodate Fuel Cycles of Up to 24 Months ML20217M3771998-03-27027 March 1998 Proposed Tech Specs 3.7.6 Re Control Room Emergency Makeup Air & Filtration Subsystem ML20217F0961998-03-23023 March 1998 Proposed Tech Specs Pages,Incorporating New Spec 3.0.5 Administrative Controls,Currently Approved for Use in NUREG-1431 ML20217Q1031998-03-0505 March 1998 Proposed Tech Specs Incorporating Programmatic Controls for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20217N8211998-03-0202 March 1998 Proposed Tech Specs 4.5.2B.1,excluding Prescriptive Requirement to Vent Operating CVCS CCP Casing ML20217N7321998-03-0202 March 1998 Proposed Tech Specs Pages,Revising Frequency for Performance of Specific Surveillances & Deleting Requirements for Accelerated Testing When Number of Valid Test Failures Associated W/Edgs Is Met or Exceeded ML20217Q1111998-02-25025 February 1998 Rev 18 to Odcm ML20211F4401997-09-26026 September 1997 Cycle 6 Startup Test Rept for Seabrook Station,Unit 1 ML20211E9981997-09-26026 September 1997 Proposed Tech Specs 3.7.6,separating Requirements for CR HVAC Sys Re Operation of CR Emergency Makeup Air & Filtration Sys Subsystem & CR Air Conditioning Subsystem ML20195J1451997-07-23023 July 1997 Rev 15 to Seabrook Station Operating Experience Manual (Ssoe) ML20148G0011997-05-29029 May 1997 Proposed Tech Specs Replacing Term Zircaloy W/Terminology That Identifies NRC Approved Westinghouse Fuel Assembly Design Consisting of Assemblies W/Either ZIRLO or Zircaloy- 4 Fuel Cladding Matl ML20148K1251997-05-0707 May 1997 Rev 6 to Part I, Seabrook Station Pump & Valve IST Program Plan ML20135C3541997-02-26026 February 1997 Proposed Tech Specs,Providing Retyped Page of Proposed Changes Re Design Features Fuel Assembly Reconstitution ML20134Q3451997-02-18018 February 1997 Proposed Tech Specs 5.3.1 Re Fuel Assemblies ML20134L8681997-02-12012 February 1997 Proposed Tech Specs 6.0 Re Administrative Controls ML20138J3351996-12-19019 December 1996 Rev 16 to Offsite Dose Calculation Manual ML20129B8361996-10-17017 October 1996 Proposed Tech Specs,Consisting of Change Request 96-02, Proposing Changes That Involve Relocation of Four TS Re Instrumentation Requirements Contained in TS Section 3/4.3 & Relocation of Selected Requirements ML20129B7761996-10-16016 October 1996 Proposed Tech Specs,Consisting of Change Request 96-06, Proposing Four Changes Re EDG Requirements Contained in TS 3/4.8.1, AC Sources ML20113B2031996-06-20020 June 1996 Proposed Tech Specs Re Svc Water Cooling Tower Loop Electrical Supply ML20117K3111996-06-0404 June 1996 Proposed Tech Specs Re Containment Leakage Testing Modifying Implementing Performance Based Program at Seabrook Station IAW 10CFR50,App J,Option B & Reg Guide 1.163 Requirements ML20115J7481996-03-26026 March 1996 Procedure for Ultrasonic Examination of Centrifugally Cast Stainless Steel Piping Using Low Frequency SAFT-UT System ML20138J3621996-03-21021 March 1996 Process Control Program ML20100G8351996-02-16016 February 1996 Startup Test Rept,Cycle 5. W/ ML20094D5341995-10-30030 October 1995 Proposed Tech Spec 3.4.6.2, RCS Operational Leakage Pressure Isolation Valve Table ML20092M1071995-09-22022 September 1995 Proposed TS 3.3.2,Table 3.3-3, ESFAS Instrumentation, Correcting Action Ref for Functional Unit 8.b Re Automatic Switchover to Containment Sump/Rwst Level low-low ML20092K2201995-09-20020 September 1995 Proposed Tech Specs,Changing Plant TS Bases Section 3/4.9.1 for Refueling B Concentration ML20098A4721995-09-20020 September 1995 Proposed Tech Specs,Relocating Functional Unit 6.b, FW Isolation-Low RCS Tavg Coincident W/Rt from TS Requirements Manual Licensee Controlled Document ML20092F9171995-09-12012 September 1995 Proposed Tech Specs Bases Section Clarifying What Specifically Constitutes Operable Pressurizer Safety Valve in Mode 5 ML20092A6331995-09-0505 September 1995 Proposed Tech Specs,Revising Main Steam Safety Valve Setpoints & Max Allowable Power Range Neutron Flux High Setpoints W/Inoperable Main Steam Safety Valves ML20091S1601995-08-28028 August 1995 Proposed Tech Specs Re Positive Moderator Temp Coefficient ML20086R2111995-07-24024 July 1995 Proposed Tech Specs,Relocating Table 3.4-1, RCS PIVs from TS 3.4.6.2, RCS Operational Leakage to Techical Requirements Manual ML20085L1161995-06-16016 June 1995 Proposed Tech Specs Re Increased Requirements for Core Reactivity Control Available from Borated Water Sources ML20084U5521995-06-0707 June 1995 Proposed Tech Specs,Consisting of Amend Request 95-02, Revising Footnote to SR 4.4.7 & Table 3.4-2 to Increase Temp Limit at Which Rc O Levels Determined by Sampling from 180 Degrees F to 250 Degrees F ML20084N9561995-05-31031 May 1995 Proposed Tech Specs Re Operation of Core W/Positive Moderator Temp Coefficient ML20083K7351995-04-19019 April 1995 Rev 74 to Emergency Response Manual (Sser) ML20082L5211995-04-16016 April 1995 Proposed Tech Specs,Revising TS 3.9.4 That Addresses Containment Bldg Penetrations to Allow Use of Alternate Containment Bldg Penetration Closure Methodologies for Postulated Accident Scenarios During Core Alterations ML20081J6021995-03-22022 March 1995 Revised Table A.3-1, Radioactive Liquid Waste Sampling & Analysis Program, to ODCM ML20078E0491995-01-25025 January 1995 Proposed Tech Specs Re Changing of Surveillance Requirement 4.6.1.2.a from Specific Schedule for Performance of Containment ILRTs ML20079B2491994-12-27027 December 1994 Proposed Changes to Part a of ODCM 1999-08-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217Q1111998-02-25025 February 1998 Rev 18 to Odcm ML20195J1451997-07-23023 July 1997 Rev 15 to Seabrook Station Operating Experience Manual (Ssoe) ML20148K1251997-05-0707 May 1997 Rev 6 to Part I, Seabrook Station Pump & Valve IST Program Plan ML20138J3351996-12-19019 December 1996 Rev 16 to Offsite Dose Calculation Manual ML20115J7481996-03-26026 March 1996 Procedure for Ultrasonic Examination of Centrifugally Cast Stainless Steel Piping Using Low Frequency SAFT-UT System ML20138J3621996-03-21021 March 1996 Process Control Program ML20083K7351995-04-19019 April 1995 Rev 74 to Emergency Response Manual (Sser) ML20081J6021995-03-22022 March 1995 Revised Table A.3-1, Radioactive Liquid Waste Sampling & Analysis Program, to ODCM ML20079B2491994-12-27027 December 1994 Proposed Changes to Part a of ODCM ML20078M1161994-11-16016 November 1994 Rev 1 to IST Reference ML20065Q7571993-09-24024 September 1993 Station Offsite Dose Calculation Manual, Rev 13 ML20062L1901993-09-15015 September 1993 Public Version of Rev 6 to State of Me Ingestion Pathway Plan for Seabrook Station ML20127P4721993-01-25025 January 1993 Rev 5 to New Hampshire Traffic Mgt Manual ML20101B2601992-05-15015 May 1992 Rev 0 to Turbine Overspeed Protection Maint & Testing Program,Seabrook Unit 1 Nuclear Power Station ML20090B0331991-12-18018 December 1991 Rev 10 to Odcm ML20086J2241991-10-31031 October 1991 Rev 4 to New Hampshire Radiological Emergency Response Plan, Traffic Mgt Manual ML20085K1961991-10-31031 October 1991 Commonwealth of Massachusetts Public Alert & Notification Sys Conversion Proposal, Consisting of Rev 0 to Site Svc Procedures 91337,91336 & 91338.W/18 Oversize Drawings ML20079M4551991-10-31031 October 1991 Rev 4 to Maine Ingestion Pathway Plan,Reflecting Changes to Div of Health Engineering (Dhe) Procedure 2.01 Contained in App D of Plan.Rev Consists of Changes to Dhe Personnel Call Lists & to Method of Notification ML20090B0371991-10-24024 October 1991 Rev 9 to Odcm ML20090B0411991-07-0808 July 1991 Rev 8 to Odcm ML20077H0371991-06-26026 June 1991 Plan for Massachusetts Communities,App M, 'New Hampshire Yankee Offsite Emergency Resource Manual.' ML20079C6681991-05-13013 May 1991 Program Description for Reverification of Pullman-Higgins Field Weld Records ML20073H9871991-04-29029 April 1991 Rev 0 to Procedure for Review of Radiographic Records ML20073E1201991-04-26026 April 1991 Rev 0 to 83A5643, Procedure for Review of Drawings. Purchase Order 76945 & Consulting Svcs Agreement Encl ML20073E1041991-04-26026 April 1991 Rev 0 to 83A5642, Procedure for Review of Radiographs ML20073E1451991-02-28028 February 1991 Revised Seabrook Station Special Conditions for Security Clearance for Unescorted Access. Safety Handbook Encl ML20082L7781991-02-28028 February 1991 Rev 7 to Station Odcm ML20065M9071990-12-0404 December 1990 Rev 57 to Production Emergency Response Manual,Including Rev 14 to Er 5.2 & Rev 1 to Er 5.8 ML20062C8551990-10-26026 October 1990 Revised Draft Odcm ML20055G3031990-06-14014 June 1990 Rev 3 to State of Me Ingestion Pathway Plan (Mipp) for Seabrook Station ML20062C8591990-01-31031 January 1990 ODCM Atmospheric Diffusion & Deposition Factors ML19353B2181989-12-0606 December 1989 Rev 0 to Seabrook Station Evacuation Time Study Handbook. ML19332D0051989-08-17017 August 1989 Rev 18 to Operations Mgt Manual (Opmm). ML20247R2101989-06-21021 June 1989 Field Change 1 to Rev 2 to Startup Test Procedure 1-ST-22, Natural Circulation Test. Related Info Encl ML20247N4011989-03-20020 March 1989 Rev 2 to Startup Test Procedure 1-ST-22, Natural Circulation Test ML20151T6441988-07-22022 July 1988 Environ Qualification Testing of Coaxial Instrument Cables (RG 58) ML20151T6211988-07-21021 July 1988 Test Rept for Environ Qualification Testing of Coaxial Instrument Cables (RG 58) ML20151T5911988-06-22022 June 1988 Rev 1 to Test Procedure for Environ Qualification Testing of Coaxial Instrument Cables (RG 58) ML20151B9181988-05-25025 May 1988 Test Procedure for Environ Qualification Testing of Coaxial Instrument Cables (RG 58) for New Hampshire Yankee ML20247M2791988-02-24024 February 1988 Rev 3 to Station Operating Procedure Rs 0722, New Fuel Receipt & Insp ML20247M2901988-02-24024 February 1988 Rev 3 to Station Operating Procedure Rs 0723, New Fuel Shipment ML20149F9351987-10-31031 October 1987 Rev 1 to YAEC-1546, Seabrook Metpac:Computer Software Package Which Evaluates Consequences of Offsite Radioactive Release Written for Seabrook Nuclear Power Station, User Manual ML20149F9591987-10-31031 October 1987 YAEC-1619, HP-41CX Calculator Eprom Sys:Dose Projection Software Package Which Evaluates Consequences of Offsite Radioactive for Seabrook Nuclear Power Station at Seabrook,Nh, Users Manual ML20234E0561987-09-18018 September 1987 Rev 0 to Emergency Plan Implementing Procedures for Massachusetts Communities,Including IP 1.1, New Hampshire Yankee Offsite Response Director/Assistant, IP 1.2, Radiological Health Advisor & IP 1.7, Technical Advisor ML20247N3661987-05-14014 May 1987 Rev 2 to Stpd, Seabrook Station Startup Test Program Description ML20211M7181987-02-13013 February 1987 State of Me Ingestion Pathway Plan for Seabrook Station, Seabrook,Nh ML20206U5561986-12-31031 December 1986 Revised Nuclear Incident Advisory Team Handbook ML19327B2681986-10-15015 October 1986 Rev 2 to Detailed Sys Text, Steam Dump Sys. ML20211E5741986-10-14014 October 1986 Rev 0 to General Test Procedure GT-M-106, Containment & Containment Encl Surface Insp. Related Documentation Encl ML20212N5461986-08-31031 August 1986 Comprehensive Vibration Assessment Program for Reactor Internals During Preoperational Testing 1998-02-25
[Table view] |
Text
_.
k Y New Hampshire - -
Ted C. Feigenbaum Y' .hh - Peesident and -
Chief Execu*ive OHicer NYN 91180 October 31, 1991 United States Nuclear Regulatory Commission Washington, D.C. 20555
- Attention: Document Control Desk -
References:
-(a) Facility Operating License No. NPF 86, Docket No. 50 443 (b) Maine Emergency Management Agency Letter #190-911, dated October -
15, 1991, D. D. Brown- to R.11. Strome, Regional Director, FEM A
Subject:
Revision 4 to the Maine Ingestion Pathway Plan Gentlemen:
By letter dated October 15,1991 [ Reference (b)}, the Maine Emergency Management _
Agency transmitted Revision 4 to the Maine Ingestion Pathway Plan for -Scabrook Station (MIPP) to the Federal Emergency Management Agency (FEMA). This letter transmits copies of Revision 4 of the MIPP, pursuant to the requiren,ents of 10CFR50.4(b)(5).
The changes contained in Revision 4, which aro -denoted by vertical- change bars located in the left hand margin, were generated by the annual plan review conducted by the State of Maine.
.lf you should have any questions regarding the above, please contact Mr. James M.
Peschel, Regulatory Compliance Manager. at (603) 474 9521,- extension 3772.
Very truly yours, .
hf 'Ja$W
- Ted C. Fe' nbaum
- Enclosures TCF:J ES/Imb q
i -
9131080226 911031 l '
PDR ADOCK 05000443 -
.F. .PDR-
[ q i
i 1 070078 New Hampshire Yankee Division of Public Service Company of New Hampshire '
P.O. Box 300
- Telephone (603) 474-9521 R
\
. United States Nuclear Regulatory Commission October 31, 1991 Attention: Documcnt Control Desk Page two cc: (w/ Enclosures):
Mr. Thomas T. Martin (2 copies)
Regional Administrator United States Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Noel Dudley NRC Resident Inspector P.O. Box 1149 Seabrook, NH 03874 (w/o Enclosures):
Mr. Gordon Edison, Sr. Project Mgr.
Project Directorate I-3 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Ebe C. McCabe, Chief Emergency Preparedness Section United States Nuclear Regulatory Commission Region 1 475 Allendale Road King cf Prussia, PA 19406
. - _ . . . . ~ . - , . .- .
DATE: 10/28/91 CONTROLLED DOCUMENT TRANSMITTAL NO: LO10-T-OOO124 PAGE: 1 ATTN: DCC DESK NRC OFFSITE Q f L_
THE ATisu)MED' DOCUMENTS (IDENTIFIED BELOW)
REPREGENT A CHANGE TO YOUR CONTROLLED DOCUMENT FILES. PLEASE CNSURE THAT ALL DOCUMENTS REFERENCED ARE ATTACHED. ACKNOWLEDGE RECEIPT OF THIS TRANSMITTAL BY COMPLETING THE ENDORSEMENT DELOW AND RETURNING THIS TRANSMITTAL TO THE RMD BY ,
11/07/91. THIS WILL INDICATE THAT YOU HAVE RECEIVED THE ATTACHED CONTROLLED DOCUMENTS AND PROCF.SSED THEM IN ACCORDANCE WITH NYRM CHAPTER 3, SECTION 10.
t UNLESS DIRECTED OTHERWISE BELOW. DESTROY SUPERCEDED COPIES. SPOULD YOU WISH TO RETAIN SUPERCEDED COPIES FOR RECORD PURPOSES, STAMP THEM INFORMATION ONLY, SVP PURCH/ ORDER PKG/ DOCUMENT IDENT, SHEET ID ISS/REV GUANTITY ISSUE PRV RETURN MIPP OO4/ COO 1 1 - -
i P
'N
- FOR PLANNING & SCHEDULING USE ONLY *
- WORK COMPLETED (STATUS CODE 16 OR GREATER) REMOVE PACKAGE FROM DDS
-OTHER (EXPLAIN)
! RECEIVED BY; DATE:
RETURN SIGNED TRANSMITTAL TO: RECORDS MANAGEMENT DEPARTMENT 02-93 l SEADROOK STATION
- P. O. BOX 300 l, SEABROOK, NH 03074 i!
NYRM TRANSMITTAL l 3-10B/DDS WORK ORDER NO: 052867 l
l
MAINE EMERGENCY MANAGEMENT AGENCY ,
October 15, 1991 Ltr. #190-91-1 Richard H. Strome, Director Federal Emergency Management Agency Region One 442 John W. McCormack POCH Boston, MA 02109
Dear Mr. Strome:
The Maine Emergency Management Agency has completed Revision 4 to the Maine Ingestion Pathway Plan for Seabrook Station. Revision 4 is hereby formally transmitted to FEMA.
The changes contained in the revision are denoted by a vertical side bar on the left hand margin of each edited page. The changes are the result of the annual review conducted by the State of Maine.
Revision 4 to the Maine Ingestion Pathway Plan for Seabrook Station is li.nited to changes to Division of Health Engineering (DHE) Procedure 2.01 which is contained in Appendix D of the plan. The revision consists of changes to the DHE personnel call lists and to the method of notification of DHE primary call list
- personnel.
If you have questions or require further information, please do not heritate to contact this office.
Since ely, Ren David D. Brown State Director Encl: as cited a
e State House Station 72, Augusta, Maine 04333 - Offices in basement State Office Building (207) 289-4080 1 1-800-452-8733
t CHANGE INSTRUCTIONS MAINE INGESTION PATHWAY PLAN FOR SEABROOK STATION REMOVE INSERT LOEP-1 LOEP-1 Rev. 4 Pages D-1 to D-9 Pages D-1 to D-9 Rev. 4 v
,r s L.)
_ _ . . . _ . _ - . . . - . _ _ _ . . _ . - . .._._ _ . _ . ~ . . . . . . _ . . . _ . _ . . _ . . _ . - - - . _ . _ _ .-. ..__ _._._.
L 4
RMD CONTROL COPY #
i STATE OF MAINE INGESTION PATHWAY PLAN (MIPP)
FOR SEABROOK STATION SEABROOK, NEW HAMPSHIRE O '
APPROVED: L DATEi David D. Brown, Director Maine Emergency Management Agency a.
REVISION: 4
-! EFFECTIVE DATE: '10/25/91 s
J i,
'MIPP -Rev, 4 --
10 u
4 LIST OF EFFECTIVE PAGES 4 Pane Rev.
Cover 3 1-v 3 LOEP-1 3 1-1 and 1-2 3 2-1 to 2-4 3 3-1 to 3-13 3 4-1 to 4-24 3 5-1 to 5-4 3 6-1 and 6-2 3 7-1 and 7-2 3 8-1 to 8-13 3 Appendices A-1 to A-7 3 B-1 to B-51 3 C-1 to C-11 3-D-1 to D-9 4 D-10 to D-72 3 E-1 to E-23 3 F-1 to F-61 3 Attachments Attachment 1 3 Attachment 2 3 Attachment 3 3 Ch LOEP-1 MIPP Rev. 4
j
- O I
APPENDIK D L
DIVISION CF HEALTH TROINEERING . i PROCEDUREli O
d
- TBIS DOCUMENT CON 1AINS-PROCEDURES.TO'BE USED' BY DRE PERSONNEL TO RESPOND TO A RADIOLOGICAL ACCIDENT
,1 i -
l O D-1 . MIPP -Rev. 4 d
t i .. +
-nu .,.' , -. ., . , , .,r.. , 5. , s - - , , , , .. . .~.+,, , . * , _ .o.n: 5,, c
DIVISION OF HEALTH ENGINEERING PROCEDURES CONTENTS AND REVISION STATUS Number Rev. Procedure Title Pace l 2.01 4 Radiological Monitoring Team Notification D-3 2.05S 2 Personnel Dosimetry D-10 2.06S 2 Decontamination of Emergency Workers, D-20 Equipment anc Vehicles 2.11S 4 Ingestion Pathway Environmental Sample D-36 Collection 2.12S 1 Air Sampling Procedure D-66
+
b U D-2 MIPP Rev. 4
d Proc. 2.01 Date 9/91 Rev. 4 RADIOLOGICAL MONITORING TEAM NOTIFICATION
- 1. Obiective To provide a system for prompt notification of personnel in the event of a radiological accident.
- 2. , Discussion In the event of an accident involving a nuclear power plant or radioactive material, the Divialon of Health Engineering (DHE) is notified by the State Police. The State Police will notify DHE primary call list personnel (Attachment 1) by initiating an all call via pager.
A designated Radiological Health Coordinator (RHC) will report to the State Emergency Operations Center (EOC) located in the basement of the State Office Building at an Alert or higher ECL. From there, the RHC will initiate the notification of monitoring team members and laboratory personnel at a Site Area Emergency or higher ECL.
- 3. Notifica!19,3 Procedure A. Initial Notification Requirements:
Rad.
Specialist Mon. Team Lab l Nuclear Power Plant: Unusual Event X Alert X Site Area X X X i
[\._)\ General X X X Portsmouth Naval Shipyard X Rad. Materials Incident B. Notification of personnel will follow the order of the call lists (Attachments 1, 2 and 3). The following format should be used (see Attachment 4):
- 1. State your name.
- 2. Ask to speak to person called.
- 3. State the type of accident and request that personnel report to the following locations
- a. Radiological Health Specialists - State EOC
- h. Monitoring Teams - First report to State EOC
- All others to DHE, 157 Capitol Street,
- c. Lab Personnel-- Public Health Lab.
l l
l \,_/ D-3 MIPP Rev. 4
9 l .
' Proc. 2.01 Date 9/91 Rev. 4 i
- 4. Ask for confirmation that you are understood and request an
. estimated response time.
L
- 5. Record time notified on the call list.
t D-4 MIPP' Rev. 4 l
t
,._ . _ . . _ _ . . . . . . . _ , - , - . _ . . . _ ,4_ ,_ . . . . . . . . , , _ . , _ . - -
3 Proc. 2.01 O Date 9/91 Rev. 4
- 4. Ask for confirmation that you are understood and request an estimated response time.
- 5. Record time notified on the call list.
i f
NJ ;
+-
O D-4 MIPP Rev. 4
_ _ _: _ _ _ . _ _ _ _ _ .______________=________:
Proc.-2.01 rg Date 9/91 I Rev. 4 ATTACHMENT 1 DIVISION OF HEALTH ENGINEERING PRIMARY CALL LIST Name/ Address Home Phone Business Phone Time Contacted Donald Hoxie 622-7445 269-5686 _
18 Greenwood Street Augusta, Maine l W. Clough Toppan 622 6343 289-5698 RFD f3 Bowman Street Box 5700 Farmingdale, Maine Patrick N . tie 622 9472 882-6321 53 Wind- .treet Aug' Maine Robert Schell 933-4413 289-5696 Box 1773 Wilson Pond Road No. Monnmouth, Maine David Breau 622-0260 289-5673 O)
( 8 School Street Augusta, Maine Wallace Hinckley 377-8834 289-5685 e Fire Road X2 Off Route 135 Winthrop, Maine Jay Hyland 621-0543 289-5677 146 Northern Avenue Augusta, Maine Linda Plusquellic 547-3109 289-5677 Middle Road Sidney, Maine r
V D-5 MIPP Rev. 4 1
l J
Proc. 2.01 Date 9/91
{s Rev. 4 ATTACHMENT 2 MONITORING TEAM CALL LIST Name/ Address Home Phone Business Phone Time Contacted Robert Peterson 626-5525 289-5693 PO Bor 5643 Augusta, Maine Ron McDougal 622-5880 289-5691 46 Pearl Street Augusta, Maine Kerwin Keller 622-7712 289-5688 243 Eastern Avenue Augusta, Maine Francis Drake 784-9614 289-5680 302 Central Avenue Lewiston, Maine Jay Hardcastle 626-0068 289-5684 28 High Street Hallowell, Maine O Carlton Gardner 782-2214 289-5682
'\h 48 Gamage Avenue Auburn, Maine Jeff Jenks 685-9086 289-5669 Wayne Village Wayne, Maine Ken Meyer 549-5741 289-5678 PO Box 64 North Whitefield, Maine Steve Zayszly 224-8267 289-5692 PO Box 560 Torrey Hill Road North Turner, Maine 1
(
(N, ) D-6 MIPP Rev. 4
Proc. 2.01 (N Date 9/91 Rev. 4 ATTACHMENT 2 MONITORING TEAM CALL LIST (Continued)
Name/ Address p_ome Phone Business Phone Time Contacted Richard Smith 934-7262 284-6191 P.O. Box 114 Biddiford, Maine Dean Jackson 785-4500 596-4297 Box 544, Common Road Union, Maine Carl Witham 225-2474 289-1826 Route 117 Turner, Maine Edmund "'trpel 495-2187 775-6054 Box 244, Hulin Road Belgrade, Maine Jeffrey Folger 622-3482 289-3826 Middle Road Augusta, Maine Sharron Hinckley 377-8834 289-3826 Loon Cove Road Fire Road X2 Winthrop, Maine Sumner Glar.ier 582-6384 289-5671 RFD 2 Box 184 Stoney Acres Gardiner, Maine Robert Stilwell 549-5544 289-5743 RR 1, Box 1805 Powderhorn Road Jefferson, Maine Scott Davis -247-3293 324-9427 P.O. Box 2 Lake Sherburne Waterboro, Maine Michael Murray 775-3906 774-4581 30 Chamberlain Avenue X 314 l
Portland, Maine
(
\
D-7 MIPP Rev. 4 l
Proc. 2.01
{' Date 9/91 Rev. 4 ATTACHMENT 3 LABORATORY PERSONNEL Name/ Address Home Phone Business Phone Time Contacted Cheryl Baker 445-2956 289-2727 RFD 6, Box 377 Augusta, ME 04330 Dr. Philip V. Haines 923-3391 289-2727 RFD #1 (923-3394)
Vassalboro, ME 04989 (camp)
Jack Krueger 845-2482 289-2727 RFD #1, Box 2310 South Liberty, ME 04949 Thomas Dwyer 622-6202 289-2727 RFD iS, Box 530 Augusta, ME 04330 l Richard French 642-7825 289-2727 RFD #7, Box 507 Augusta, ME 04330
[\-- '
Theresa Zibura RFD 6 445-2817 289-2727 Augusta, ME 04330 Jean Thayer 623-8052 289-2727 Middle Street Hallowell, Maine
\m/ D-8 MIPP Rev. 4
J Proc. 2.01 g-'s.,
j Date 9/91 1 Rev. 4
%J ATTACHMENT 4 SAMPLE NOTIFICATION Hello. My name is Clouch Toppan. May I speak to Dave Breau?
Hello. My name is Clough Toppan from the Division of Health Endinieri.4g.
I am calling to report the occurrence of an Alert at Maine Yankq1_'Mwer Company or Seabrook Station.
The situation at this time is as follows:
There has been a reactor coolant system rupture tc the steam generator.
A steam line radiation monitor is reading 't* gl.
You are to report to the State EOC in the bae. ment of the State Office Building.
Do you understand these instructions? When can you arrive at the EOC7 (Note time individual was notified.)
v i
.D\I
\ .
\/ D-9 MIPP Rev. 4