SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFICE 7M COLuustA. SOUTH CAROLINA 29218 O. W.OlXON,JR.
January 18, 1984 vicE pmEsiosur NUCLE AR OPERATIONS Mr. Harold R.
Denten, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Technical Specification Change Table 3.8-1 " Containment Penetration Conductor Protective Device Test Setpoint Criteria"
Dear Mr. Denton:
South Carolina Electric and Gas Company (SCE&G) requests a revision to the Virgil C. Summer Nuclear Station Technical Specifications, Table 3.8-1, " Containment Penetration Conductor Protective Device Test Setpoint Criteria," providing for the addition of the breakers as shown en Attachment I which were inadvertently omitted from the Technical Specifications.
These breakers provide the primary and backup penetration protection to the Reactor Building Sump Isolation Valves located in separate mini-containments outside the Reactor Building that function as extensions of containment.
SCE&G has determined that a f.inding of no significant hazards consideration is appropriate in trat additional requirements are being added to the Technical Specifications.
These breakers have been subjected to the same examination and testing program as other breakers identified in Table 3.8-1.
This change has been reviewed and approved by our Plant Safety Review Committee (PSRC) and the Nuclear Safety Review Committee (NSRC).
A check in the amount of Four Thousand Dollars
($4000.00) is enclosed for processing this change.
If there are any questions, please advise.
Very truly
- ours, O. W. Di n,
DOd:OWD/fjc
{5(yC>(
cc:
See Page #2 6
, /()b0 C
Q l C.M CC 8401240557 840118 chedch }hbgC PDR ADOCK 05000395 i'
3 P
6 Mr. Harold R.
Denton Technical Specification Change Table 3.8-1
" Containment Penetration Conductor Protective Device-Test Setpoint Criteria" i
January 18, 1984 Page #2 cc:
V.
C.
Summer T. C.
Nichols, Jr./O. W. Dixon, Jr.
E.
H.
Crews, Jr.
E.
C.
Roberts W. A.
Williams, Jr.
D. A.
Nauman J.
P.
O'Reilly Group Managers O.
S.
Bradham C. A.
Price C. L. Ligon (NSRC)
G.
J.
Braddick D. J.
Richards NRC Resident Inspector J.
B.
Knotts, Jr.
NPCF File 4
I i
l i
1 i
4
_,..,_____...-,..___,-..,m--
.