ML20079F441

From kanterella
Jump to navigation Jump to search
Provides Info Re Qualifications & Experience of Personnel Operating Plant During Current Strike,In Response to Chairman Palladino Request
ML20079F441
Person / Time
Site: 05000000, Salem
Issue date: 05/14/1982
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
Shared Package
ML20079F227 List:
References
FOIA-83-363, TASK-PII, TASK-SE SECY-82-195, NUDOCS 8205270663
Download: ML20079F441 (4)


Text

__

t' May 14,1982 SECY-82-195 l

1 For:

The Commissioners Fron:

William J. Dircks Executive Director for Operations Sub.iect:

00ALIFICATIONS OF PERSONNEL OPERATING THE SALEM PLANT DURING THE CURRENT STRIKE Puroose:

To provide information requested by Chairman Palladino.

Issue:

Operation of Salem Nuclear Plant under strike conditions.

Discussion: In response to'a request by Chairman Palladino, the staff has conducted a review of the qualifications and experience of the personnel ocerating the Salem Plant during the current strike.

This review has covered qualifications prior to licensing, status of licenses and recent operating experience.

In general, the plant is now being operated by the normal shift supervisory personnel, augmented slightly by plant staff. Of the 26 persons perforndng licensed duties on shift, 23 are regularly assigned to the plant and have been operating the olant on shift over the past several years.

These shift personnel are augmented by 2 training instructors and 1 staff engineer.

All personnel have been participating on a regular basis in the operator requalification program and hold valid Reactor or Senior Reactor Operator Licenses.

Minimum staffing required by technical specifications has been satisifi,ed.

Working hours for operating personnel have been extended, and plant management intends to rotate personnel to meet requirements on maximum hours worked per day or week, time off and number of days worked, to minimize fatigue.

All personnel performing licensed duties are licensed on both units, with two exceptions, who are licensed only on Unit No.1.

Personnel are rotated between units, where licenses oermit, to meet operational requirements. The average XA Copy Hos Been Sent to PD.R.

Contact:

D. Reckham, NRR X24868 f.2 o C.2. 70 G6.5 M

]

a 2-sitift operational experience level of licensed personnel exceeds 21s years at the Salem Plant.

This does not include pre-licensing power plant experience, which exceeds 5 years on average.

A detailed summary of education, plant operational experience, and licensing examination grades is attached as Enclosure 1.

f, s

William J. Dircks Executive Director for Operations

Enclosure:

Oualifications of Salem Operators DISTRIBUTION:

Commissioners OGC OPE SECY OCA OIA

ENCLOSURE 1 00ALIFICATIONS OF SALEM OPERATORS - NON-STRIKING Experience Test Scores Formal Nonnal perator (Salem Plant Avg /Section Education Operator SSS/SS/SR0/E0 Quali No.

Ooerations)

Min.

(vrs.)

Yes/No RO/Ocera/NCO Unit 1

5 88.9/81 12 Yes SS/SRO Bott-2 4+

83.5/75.5 12 Yes SS/SRO Bott 3

5+

83.9/80.4 12 Yes SSS/SR0 Bott 4

5+

85.3/80.1 12 Yes Operg/SS/SR0 Bott-

'S 3+

87.2/83.3 12 Yes SS/SRO Bott -

6 3+

89.9/82.7 13.5 Yes SS/SRO Bott 7

5 84.7/71 12 Yes SSS/SR0 Bott-8 Min. 5 yr/USN 83.8/76 16 Yes Operg. Eng/SR0 Bott 9,'

5 Navy 1.5 (SU) 84.4/77 16 Yes NC0/SRO Bott 10 1.5 89/78 12 Yes NC0/R0 Bott-11 2

81.9/ 75.5 16 Yes NC0/SRO Bott 12 5

80.8/72.2 13 Yes NC0/SRO Bott-13 Min., 3 yrs. USN 84.6/75.9 16 Yes NC0/SRO Bot!.

14 5

84/71 12 Yes NCO/R0 Bot!

15 5

80.8/73 12 Yes NC0/R0 Bot!

16 3+

85.5/73.5 12 Yes NC0/SRO Bot!

17 4 (Trng. only) 88.4/82 16 No E0/SRO 11 i 18 6 Navy, 3 Trng.

93/84.0 13 No E0/SRO Sot 19 8 Navy, 2 SRO, 4 Training 86/76 13 No E0/SRO

  1. 1 I 20 5

83.9/76 12 Yes E0/R0 Bot 21 Min.,

4 yr. USN 87.6/85.5 16 Yes E0/SRO Bot 22 Min.

82.5/76 16 Yes E0/SRO Bot 23 Minimum & 3 yrs.

Eng. & H.P.

85.1/70.0 15 Yes E0/R0 Bot l

l i

{

. - ~, -

Experience Test Scores Formal Normal parator (Salem Plant Avg /Section Education Operator SSS/SS/SR0/E0 Quali*

No.

Ooerations)

Min.

(yrs.)

Yes/No RO/Ocero/NCO Uniti 24 4 yrs. USN/ min.

83.5/77.0 12 Yes E0/SR0 Both 25 2 yrs. & min.

84.7/77.5 16 Yes E0/SR0 Both 26 2 yrs. & min.

91.5/70.5 16 Yes E0/SR0 Both f

,