Documents 910620 Telcon Agreement to Defer Installation of Facility Steam Generator Overfill Protection Sys Until Cycle 7,in Ref to Generic Ltr 89-19 Re Safety Implications of Control Sys in LWR Nuclear Power Plants
ML20079D386
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/09/1991
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-19, TAC-74994, TAC-74995, NUDOCS 9107120199
Download: ML20079D386 (2)


Text

..

r% :

,,pn,wwn, Southem Califomia Edison Company F') PARKE' R $TREET IRVINE, C All7 ORNIA 92710 I

TME N NE F. R, N ANDY -

$1ANAGEft. Nt)CLE Af4 LICE NSING (714)4S4 4504 U.

S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.

C. 20555 Gentlemen:

Subject:

Docket No. 50-362 Generic Letter 89-19: Safety Implications of Control Systems in LWR Nuclear Power Plants (TAC Nos. 74994 and

74995)

San Onofre Nuclear Generating Station Unit 3-

References:

1.

October 22, 1990 letter from F. R. Nandy (SCE) to the Document Control Desk (NRC),

Subject:

Same as above for San Onofre

-Units 2 and 3, 2.

' August 30, 1990 letter from John T.

Larkins (NRC) to Mr. Harold

.B.

Ray (SCE),

Subject:

Southern California Edison-Company's Response to Generic Lettar 89-19 Regarding Safety Implications of Control Systems in_ LWR Nuclear Power Plants This letter documents a revision to the schedule for installing a-Steam Generator Overf111 Protection System (SGOPS) at San Onofre Unit 3.

By reference 1, in response to Generic Letter 89-19 and reference 2, Southern California Edison (SCE) committed to install 1 a SGOPS during the San Onofre Unit-3 Cycle 6 and Unit 2.

Cycle 7 refueling outages.

However, it is our understanding-that.

the:NRC is still evaluating the safety benefits of installing the SGOPS-in some Combustion Engineering plants.

Based on the status of this NRC evaluation, and-in accordance with the provisions of the Integrated Implementation Schedule, SCE requested a schedule change for Unit 3 in a June-20, 1991 telephone conversation with our NRC Project Manager.

It was agreed that installation of SGOPS at San Onofre Unit 3 shall be deferred to the Cycle 7 refueling outage.

1h}

9107120199 910709 PDR =ADOCK 05000362 P

PDR L

g

_. ~..

~_._.. _.- _.

14 je. -

-Document! Control' Desk i If yoti havo any questions!on.this subject, please let me-know.

F Subscribed-on this-day of L

a

,, 1991.

Respectfully submitted, SOUTHERN CALIFORNIA. EDISON COMPANY By:.Ch#

N i

F. R. Nandy. _

Manager,-Nucleardicensing s

State of California County of-Orange-I bll4 O.

Sk On Llw 9% / Tlf before me,

/

personally 1oppeared: -- @ A B. /i/n,vm personally known to-.me'to be--the person-whose namedis subscribed to the lwithin instrument:-anduacknowledged to me-that he axecuted the l-

.same in-his authorized capacity, and that by-his signature on the

-instrumentithe-person,-Jor theientity upon' behalf-of which the person acted, executed-the instrument.

-WITNESS my hand-and official seal. f Signature-d

/"-Af F

f W.%

NOTARY PUBLIC I

' STATE OF CALIFORNIA I

he

- County of Orange d

[

c \\urtwesntomsoorsars.une:Jv -

)

% W D. @ W j

My App <wntrnent Exp. 716-H

}-

-).we.-so=_,--,- - - __

u

cc:

-J.

B.

Martin, Regional Administrator, NRC Region V l

C. Caldwell,=NRC Senior Resident-Inspector,-San-Onofre Units 1, 2, and 3'

-bec: (See attached sheet)