r% :
,,pn,wwn, Southem Califomia Edison Company F') PARKE' R $TREET IRVINE, C All7 ORNIA 92710 I
TME N NE F. R, N ANDY -
$1ANAGEft. Nt)CLE Af4 LICE NSING (714)4S4 4504 U.
S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.
C. 20555 Gentlemen:
Subject:
Docket No. 50-362 Generic Letter 89-19: Safety Implications of Control Systems in LWR Nuclear Power Plants (TAC Nos. 74994 and
- 74995)
San Onofre Nuclear Generating Station Unit 3-
References:
1.
October 22, 1990 letter from F. R. Nandy (SCE) to the Document Control Desk (NRC),
Subject:
Same as above for San Onofre
-Units 2 and 3, 2.
' August 30, 1990 letter from John T.
Larkins (NRC) to Mr. Harold
.B.
Ray (SCE),
Subject:
Southern California Edison-Company's Response to Generic Lettar 89-19 Regarding Safety Implications of Control Systems in_ LWR Nuclear Power Plants This letter documents a revision to the schedule for installing a-Steam Generator Overf111 Protection System (SGOPS) at San Onofre Unit 3.
By reference 1, in response to Generic Letter 89-19 and reference 2, Southern California Edison (SCE) committed to install 1 a SGOPS during the San Onofre Unit-3 Cycle 6 and Unit 2.
Cycle 7 refueling outages.
However, it is our understanding-that.
the:NRC is still evaluating the safety benefits of installing the SGOPS-in some Combustion Engineering plants.
Based on the status of this NRC evaluation, and-in accordance with the provisions of the Integrated Implementation Schedule, SCE requested a schedule change for Unit 3 in a June-20, 1991 telephone conversation with our NRC Project Manager.
It was agreed that installation of SGOPS at San Onofre Unit 3 shall be deferred to the Cycle 7 refueling outage.
1h}
9107120199 910709 PDR =ADOCK 05000362 P
PDR L
g
_. ~..
~_._.. _.- _.
14 je. -
-Document! Control' Desk i If yoti havo any questions!on.this subject, please let me-know.
F Subscribed-on this-day of L
a
,, 1991.
Respectfully submitted, SOUTHERN CALIFORNIA. EDISON COMPANY By:.Ch#
N i
F. R. Nandy. _
Manager,-Nucleardicensing s
State of California County of-Orange-I bll4 O.
Sk On Llw 9% / Tlf before me,
/
personally 1oppeared: -- @ A B. /i/n,vm personally known to-.me'to be--the person-whose namedis subscribed to the lwithin instrument:-anduacknowledged to me-that he axecuted the l-
.same in-his authorized capacity, and that by-his signature on the
-instrumentithe-person,-Jor theientity upon' behalf-of which the person acted, executed-the instrument.
-WITNESS my hand-and official seal. f Signature-d
/"-Af F
f W.%
NOTARY PUBLIC I
' STATE OF CALIFORNIA I
he
- County of Orange d
[
c \\urtwesntomsoorsars.une:Jv -
)
% W D. @ W j
My App <wntrnent Exp. 716-H
}-
-).we.-so=_,--,- - - __
u
- cc:
-J.
B.
Martin, Regional Administrator, NRC Region V l
C. Caldwell,=NRC Senior Resident-Inspector,-San-Onofre Units 1, 2, and 3'
-bec: (See attached sheet)