ML20079C822
| ML20079C822 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/13/1991 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20079C823 | List: |
| References | |
| NUDOCS 9106260158 | |
| Download: ML20079C822 (8) | |
Text
_-
[pa as ow%,
l'
'n UNITED STATES
?,
r, /'
i
%,, \\ ~p!
NUCLEAR REGULATORY COMMISSION
\\..p.J WASMCRW, D C. M&
- ..+
PUBLIC S,ER,VJCE, EL,ECTRJ,C, f, GA,S,,00pPAtQ ffl.l09.E,L[p],A, E,L,E,CJ,RJ C_ COMP ANY D ElliARV A [0p,E R,, App, LJ pp,T, [pp[p!q
.A,TLpp,TJ C, CJ,T,Y, E LECTRI C COMP ANY DOCKET t10. 50-272 SALEM tlUCLEAR GEt: ERAT 1tiG STAT 10tl,,UplT NO. 1 Al1Ef:Df EllT, T0,[,A,CJ LJ T,Y, OP E R ATJ pp, LJ CEF,SE, Amendment flo. 126 License flo. DPR-70 1.
The t!uclear Regulatory Contission (the Commission or the NRC) has found that:
A..
The application for amendment filed by the Public Service Electric &
Gas Company, Philadelphia Electric Company,(Delmarva Power and Light Company and Atlantic City Electric Company the licensees) dated February 13, 1991 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendnent will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Patt 51 of the Commission's regulations and all applicable requirements have been l
satisfied.
l 2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 0.C.(2) of Facility Operating License tio. DPR-70 is hereby amended to read as follows:
91062601sa 910613 DR ADOCK 0500 2_
\\
\\
.p.
(2) Te,chn,ic,a,1, Specifications and Environrrental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendroent flo.126, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and sh'11 be iniplen.cnted within 60 eays of the date of issuance.
FOR THE ttVCLEAR REGULATORY COMMISS10tl
/dati Tx? B A Walter P. Butler, Director Project Directorate 1-2 Division of Reactor Projects - 1/11
Attachment:
Changes to the Technical Specifications Date of Issuance: June 13. 1991
_.___m__.____.._.______._-
. ~. _ _ _. _ _ _ - _ - -
4 1
1 4
ATTAttil1Elli TO L ICENSE AtiE.tJ.EF..E.l4T..N.O. 1%
l FACILITY OPERAT1f G 1.lCEIEE tto. OPR-70 DOCKET 110.,. 50..272 Pevise Appendix A as follows:
R en.o v e._.P.. ale I n sert _P.aJc.e.
3/4 6-11 3/4 6-11 1
?
Y e
?
i V
-h l
f'
_.,........ _. _.... _ _,.... - - -.,, - -, -.,, - - _. -.. - _ _. - ~ ~ - - - -. - -, - ~ - -. - - - - - - - -, - - - - - -
.... - -.. -. ~. -
.. ~
e CONTAINMENT SYSTEMS i
CONTAINMENT COOLJNG SYSTEM LIMITINO CONDITION FOR OPERATION 3.6.2.3 Five containment cooling fans shall be OPERABLE.
l hPPLICABILITY: HODES 1, 2 and 3.
ACTION:
a.
With one or two of the above required containmenc cooling f ans inoperable, restor.J the inoperable cooling fan (s) to OPERABLE statun within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With three or more of the above required containment cooling fans l
inoperable, and both containment spray systems OPERABLE, restore at least three cooling fans to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or l
be in at least HOT STANDBY WITHIN the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the remaining l
inoperable cooling fans to OPERABLE status within 7 days of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.2.3 Each containment cooling fan shall be demonstrated OPERABLE:
l l
SALEM - UNIT 1 3/4 6-11 Amendment No. 126, l
l l
j cs arovy'o, J
ii UNITED MATES 2
3,,
i NUCLEAR REGULATORY COMMISSION
- d f
W?.sHINoToN, D.C. 20%5 e
,i n,
g PUBLIC SERVICE,ELECTpJp,), PAS,,CppP,ApY
,Pp] L, ape,L,Pp] A,{ L ECTR I C_ COMP ANY DELMARVAPOWERppp,,LJppJ,ppMfpp!
ATLANTIC CITY ELECTRIC COMPANY DOCKETN0.,5p-31,1 E0kEU.UUfb500.9.Efff$13ff..SJhl)9b_SU).TN0.2 Al?END!'ENT TO FACJJ.JJy,pPEppJJpp,,ypfy,SE Amendment 110. 105 License No. DPR-75 1.
The Puclear Regulatory Consission (the Commission or the NRC) has found that:
A.
The application for amendment filed by the Public Service Electric &
Gas Company, Philadelphia Electric Company,(Delmarva Power and Light Company and Atlantic City Electric Company the licensees) dated February 13, 1991 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1; B.
The facility will oper.ste in conformity with the application, the provisions of the Act, and the rules and regulations of the Connis sion; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted l
in compliance with the Commission's regulations set forth in 10 CFR
[
Chapter 1; I
D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifica-tions as indicateo in the attachment to this license amendment, and paragraph 2.C.(?) of Facility Operating License No. DPR-75 is hereby l
amended to read as follows:
L
e 2
(2) Lechnj,ca,1,SpecificationsandEnvironmentalProtectionPlan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 105, are hereby incorporated in the license.
The licensee shall o the Technical Specifications. perate the facility in accordance with 3.
This liter.se amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/ s.[
Walter R. Butler, Director project Directorate 1-2 Division of Reactor Projects - 1/11
..ttachment:
Changes to_the Technical Specifications Date of issuance: June 13, 1991 i
i l
1 l
4 4
ATT ACHf4E tit,,1,0, LJ,C FilSE,,AliE t:DI1,E f;T, tiO,., J 0,5_
FAEILITY CPEPATit!G LICEf15E t10. OPR-75 0CCKET f;0. E0-311 Fevise At r< dix A as follows:
Perove Page Insert Page 3/4 6-12 3/4 6-12
.. -.. - - =.
. ~
CONTAINMENT SYSTEM 1 CONTAINMENT COOLING SYSTEM LIMITING CONDITION FOR OFERATION 3.6.2.3 Five containment cooling fans shall be OPERABLE.
l APPLICABIklIX: MODES 1, 2 ano 3.
691.19E 8 With one or two of the above required containment cooling fans a.
inoperable, restore the inoperable cooling fan (s) to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.
With three or more of the above required containment cooling fano l
inoperable, and both containment spray systems OPERABLE, restore at least three cooling fans to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or l
be in at least HOT STANDBY WITHIN the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the remaining inoperable cooling fans to OPERABLE status within 7 days of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS
............c..................................................................
4.6.2.3 Each containment cooling fan shall be demonstrated OPERABLE:
SALEM - UNIT 2 3/4 6-12 Amendment No.105
.