ML20078R875
| ML20078R875 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/02/1983 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20078R864 | List: |
| References | |
| NUDOCS 8311150334 | |
| Download: ML20078R875 (1) | |
Text
_
o 50-348 J
DOCKET NO.
UNIT 51101 DOWNS AND POWER AEllUCTIONS UNIT NAME _ J.M.Farlav-Unit 1 f) ATE 2/D2/8'l ~
COMPLETEI) BY hkG.Hairston_III REPORT MONTil T AMURV TEl.ErilOrlE _.GQ5) 899-5156 1
i 6
1 mico q
gW U
3 U
l_icensee E.r, gg Cause & Convective t
[i Eg 5
1 =j'3 y,
132,
E.
W=
Event u?
aj Action to j$
$g Report #
ju d'0 Prevens Recussence 1
- K W 6
.a.
1 ouco gu I
o[
001 830114 S
411.5 C
3 NA NA NA Unit was shut down for Cycle 4 - Cycle 10-5 refueling outage. While rairping E$O down for the schedul,ed outage, the reactor tripped prematurely due to low steam generator level.
I i
i l
i v
f I
2 3
4 1
I:: l'osted Reason:
klethod:
Exhibit G letstenction :
A D uipment Failure (Explain)
I Manual for Preparation of I).a '
/
S: Solieduled i
I Il Maintenance of Test 2 M.mnal Sciam.
Entey Sliects for I.icen er I C-Refueling 3 Ansomatic Scrani.
Event Repint (l.ER)I it. INilREG.
0 Regulatiny Rest ictiem 4 Oaher (Explain) 0161) j E-Ope ator Tealning A license Examination I: Administsative 5
G Opeutional En sor (lixplain)
Estiibit I S,une Sinn.
l l'7/77) 1101hcs (limplain) l i
l 1
-