s OPERATING DATA REPORT i
DOCKET NO. 50-348 DATE l.Q.-Z 8.l COMPLETED BY u_ c linirston, III TELEPHONE (20s1899-5156 OPERATING STATUS f
Notes
- 1. Unit Name: J seph M. Farley - Unit 1 1) Cumulative data since
- 2. Reporting Pened. October. 1983 12-1-77, date of connaercial
- 3. Licensed Thennal Power (MWt):
2652 operation.
- 4. Nameplate Rating (Gross MWe):
860 .
- 5. Desaga Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe): 844.6
- 7. Maximum Dependable Capacity (Net MWe): 803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe): N/A
- 10. Reasons For Restrictions.If Any: N/A This Month Yr to.Date " Cur'nulative 745 7,296 51.864
- 11. Hours In Reporting Period
- 12. Number Of Hours Resctor Was Critical 723.5 5,511.7 33,659.2
- 13. Reactor Reserve Shutdown Hours 11.1 36.2 3,650.7
- 14. Hours Generator On.Line 684.9 5.371.2 32.639.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 oo 1.789.981 13,729,161 82,219,210
- 16. Grom Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 567.630 4.332.748 26.103.332 537.068 4,081,870 24.522.090
- 18. Net Electrica! Energy Generated (MWH)
- 19. Unit Service Factor 91 9 73.6 62.9
- 20. Unit Availability Factor 91.9 73.6 62.9
- 21. Unit Capacity Factor (Using MDC Net) 89.7 69.6 58.8
- 22. Unit Capacity Factor (Using DER Net) 87.0 67.5 57.0
- 23. Unit Forced Outage Rate 8.1 1.6 15.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each 6: ,
Refnpl ing /mn inc onnni o nurnge. Fahrunry IQR4 60 en 70 anye
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved iNITIA L CRITICA LITY 8/6/77 8/9/77 INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/7)
DR 831110 R DOCK 0500034g i PDR pn;7,
pocyr 30, 50-348 1
UNIT DAE II/6/83
.G. Hairston, III C OSfP!.E H D S Y ELEPHONE (205)899-5156 AIONT11 Oct ber. 1983 DAY AVERACE DA!LY POWER LEVEL
- DAY' AVERAGE DAILY POWER LEVEL (hiWe-Net) (5tWe Net) 803 37 0 -
700 13 472 2
795 39 795 3
791 794 4' 20 789 794 3 21, 800 22 797 6
~
801 23 795 7
g 798 24 802 799 25 803 9
798 807 10 3 804 27 704 4
13 796 842 (2 3 640 808 13 3 0 842 14 30 727 3g 808
. 35 16 670 I
INSTRUCUONS On tiiis formst. list the averste daily unit puweilevelin MWe-Net for each d:y in the reportin5 munth. Campure to
, the neare:t whole me;swatt.
(9(77)
DOCKET No.10-348 UNITS 1101 DOWNS AND POWER REDUCTIONS UNIT NAME J.M.Farlev tinit I DA1E 11/6/83 ,
COMPLETED BY LL}lairston. III REPORT MONTIl October. 1983 TEl.EPilONE f.ZD3)899-5156
. 3 -
I jp "g th cusee Eg Cause & Courective h'8 No. Date k Eg ;; )2E gy, 5 eacEh Event p mo go Action to Psevent Recurrence
>- jE & 1 2 Repost a -
u o
6 831013 F 26.4 A NA HD llTEXCH Unit taken off line to repair turbine 005 1 j
gland exhaust condenser.
006 831016 F 33.7 A 3 NA IA INSTRU With one overtemperature delta temperature channel in test a spike on a second channel caused a reactor trip.
. A subsequent reactor trip occurred dua to LoLo S/G 1evel caused by operator error.
NOTE: Event numbers reflect a revision
- to this page in the January -
t June reports. Events for Januar!'-
- June 1983 were incorrectly ,
numbered. !
4 1 2 3 4 F: linted Reasim: Method: Exhibit G. Instructi..as S: Stheduled A Equipment Failure (Explain) 1 Manual for Preparatimi ni Dan s
} 24tanual Scram. Entry Sheets foi 1.i cnsee Il4taintenance of Test Etent Repost (l.ER) F;1e iNilREG-i C Refueling 3 Automatic Scram.
D llegulainey Restsiction 4 Other(Emplain) 01611 E Opesator Training A license Examination F Administsative 5 .
G Ope:Jtismal Enor (Explain) thlobit 1 - Same Source ,
l'lf 77) 11 Othes (E splain)
DOCKET NO. 50-348 UNIT SilUTDOWNS AND POWER REIM)CTIONS UNIT NAhlE _ J.M.Farley-Unit 1 DATE 2/02/8'l COkfrLETED IlY W G.Hairston.III REPORT kf0NTil T AWAuv TELErilONE .(205) 899-5156
, 3
- ,$g };; E' k Licensee E-r, h,, Cause & Cursective No. Date k T. g ,y5 Event gg pu Actiam to H -jE & Repint
- v> U Pieven Recussence gigg _ g 6
001 830114 S 411.5 C 3 NA NA NA Unit was shut down for Cycle 4 - Cycle 5 refueling outage. While ramping down for the schedul.ed outage, the reactor tripped prematurely due to low i
steam generator level.
,i
)
i 4
1 i
i 1 2 3 4 i I:: I:osted Reasim: klethod: Enliibit G. Instruction
! S: Scheduled A Equipment Failuse(Explain) 1 klanuit for Preparation of D.it i ll klaintenance o( Teet 2 !.:anual Scram. Entry Sheets for I.icen c j C-Refueling 3 Automatic Scram. Eveni ReposI (l.1:RI I ilc INUHliG-
- D-Regulatoiy Hestrictism 4 Oslies (Emple.in) 0161)
E Operator Training A license Examination F- Administeative 5 1 G Opciational Enus (linplain) lishibis I S.ime Soue.
(9/17) 11 Othes (l!xplain) i
DOCKETNO. 50-348 UNIT SIIU1 DOWNS AND POWER REDUC 110NS J.M.Farley-Unit 1, UNIT NAME DA1E 3/02/83
- COMPLETEI) BY 1 G.Hairston.III REPORT MONTil FEBRUARY TELEPllONE (205) 899-5156
-_ "h E
- jg "g j Fh Licensee [v,, Cause & Corrective No. Date {
H 3g ;;
5
.;; 5 5 Egc Event Report #
p mu j{a., Action to Pacvent Recurrence i
fI 2 !
O o
6 1
001 830201 S 672 C 3 NA NA NA The Unit 1 Cycle 4 - Cycle 5 refueling outage continued from
, 1/31/83. ,
t i
1 l
i j
1 1 2 3 4 i: Eosted Reason: Method: Exhibit G . Inst ruction S. Scheduled A Equipment Failure (Esplain) 1 -Manual for Preparation of D.it -
- Il-Maintenance of Test 2-Mannal Scram. Entry Sheets for I.iten -
. C Refueling 3 Autonutic Sciam. Evenn Repost (1.ER)1 1. INUMEG-
) D llegulatiny Hest iction 4-Other (Explaisi) 0161)
E Ope ator Tsaining & license Examination F Administsative 5 G Opciational Leror (Explain) INinbis I Same Sour.
- 19f77) 11 Olhes (E xplain)
< /;
UNIT Sil01 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J.M.Farlev-Unit 1.
DAIE _s/02/83 COMPl.ETED IlY leLf..Haira r nn ; T T I REPORT MONTil MARCH TEl.EPilONE _12.05) 899-5156
~ ,5 3 [ 1. ice:Isce E r, gg Cause & Con receive No. Date k 5g g 2g& Event g? gui Action si, H
f5 5 jgg Repos * ,
mo g Psevent Recurrence _
6 +-
) '
1 001 830201 S 713.6 C 3 NA NA NA The Unit 1 Cycle 4 - Cycle 5' refueling outage continued from 2/28/83. ,
i 1 i <
l .,
+ * *
) .
s .. s 1
+
s s s
. s' '
, ya r ~%.
, s
- c. ~
s ,-
g y 3 4
_', .-.i
)
F: foued Reawn: Metheml: Exhible G-Instroccio, 'N '
{ .
4 S: kheiluled 4 A Fquipment Failure (Ex;laiti) 1. Manual for Prepnation of D.o . '
15 Maintenance o(Test 2 Manual Scram. Entiy Sheets for I.icco -
C-Reincling . 3 Automatic Scram. Event Reping (I.ERI I i'. t NURI G-D llegulatomy Resiniction 4 Other (Emplain) 0161)
~,
s x s E-Operator Tsaining & Ilicense Examination .l, F- Ausinist eative 5
' .5
~
. G Opciational 1.s tor (Explain) Eshihis I . sanie Si.co- , s
('l/17) ll Othes (Esphhi) , '. s. s
,.\ue-ew (
b
. T
f)OCKET NO. 50-348 UNIT SIIU1 DOWNS AND POWER REDUCTIONS J.M.Farley-Unit 1 UNIT NAhlE DATE 51.02/83 COhlrEETED BY _LG . Hairs t on - III REPORT hlONTil APRTT. yp gqq,g g
- E E
.! E "g j $} Licensee E t. j% Cause & Corrective No. Date k li g ;:; jgm Event y? a.1 Action to F
$5 5 jigg 6
Report # ,
in U fu Pievent Recuricuce i
f 002 830413 S 38.3 B 1 NA NA NA Turbine overspeed trip test; j maintenance outage.
1 1
i i 2 3 4 I
I:: I orted Reason: hiethext: Exhibit G. Instruction:
1 S: Scheduled A l'quipment Failure (Explain) 1.hlanual for Pseparation of D.it '
- Il41aintenance of Test 24l.mual Scram. Entry Sheets for I.itro .
i C-Ilefueling 3 Automatic Scram. Event Report (i.ER)I a. 'NUREG-l D llegulatosy Restriction 4 Other (Explaio) 0161)
- I? operator Training A license Examination F. Administ rative 5 G Opciational Eeror (Explain) E sInhit I - Same Soon.
l l'7/17) 11 Othes (E xpliin)
1 DOCKET NO.59-348 UNIT S1101 DOWNS AND POWER REI}UCI10NS J.M.Farlev-Unit 1 UNIT N AhlE
- I)A1E ._6/_02/8.3 COMPLETED BY .W.G.Hairston. III REPORT MONTil MAY TEl.EPilONE _(205) 899-5156 w.
_ E E E- E' U Licensee E-r E'q, Cause & Conective No. Date
[ 5! 3$d Event y f'8u Action to F-
[Z E j;gg Repost # ,
vs O g l'acvent Hecurrence 6
003 830525 F o B 4 83-024/03L-0 CB VALVEX Unit was reduced to 35% during resolution of RCS unidentified leakage in excess of 1 GPM.
i 4
i i
4 4
i i 1 2 3 4
! F: F.uted Reason: Method: Exhibit G . Instruction .
S: Scheduled A Equipment Failure (Explain) 1. Manual for Preparition of I).ii .
j llahintenance of Test 24fanual Scram. Entry Sheets for 1.icen n C.Hefueling 3. Automatic Scians. Esent Repost (l.ER)I
- 1NUMEG. -
D Hegniatoiy Resteiction 4.Dehen (Explain) 0161)
E.Opceator Tsaining & 1.icense Exaspination F. Administ sative 5 G Opciational Essor (Emplain) Esinbit I Same Sinn.
i 19/77) 11 Othes (E xplain)
I)OCKET No. 50-348 UNIT SIIU1 DOWNS ANI) POWER REIM)C110NS UNIT NAhlE .LEFarlev-Unit 1.
4 DATE Zl06/83 COhll'LETEI) ny IL.C.Hai r me nn TII i
REPORT &lONTil JUNE TELEPilONE .4205) 800-515A
- jg [ Licensee Eg e., Cause & Conective No. Date h 5g g 2 g ac Event gy gu3 Action to F yI 5 gg Report
- _
v> U g Prevent Recurrence 6
004 830615 F 29.3 A NA NA UD llTEXCH Unit taken off line to repair turbine gland steam exhaust condenser following failure of the condenser fan.
j l
i i
i I 2 3 4 i l~: I:o.ced Reason: hiethod: Exhibit G. Instruction.
S: Scheduled A Equipment Failure (Explain) l-klanual for Preparatiem of Dat - /
11 klaintenance of Test 2 htannal Scram. Entiy Sheets for I.itesi ~ l C.RcIncling 3. Antomatic Scram. Esent Repost (1.1:Ril & INilRI:G.
j D Itegulaemy Restsiction 4 Other (Explain) 0161) j E-Operator Tsaining A license Examination F. Administ salive 5 j G Opciational Lisor (linplain) lisinbit I- Same Som.
19/H) 11 Olhes (E xplain)
}
6 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS OCTOBER, 1983 During the month of October, there were two (2) unit shutdowns.
On October 13, 1983 a manual shutdown was initiated for repair of-the turbine gland exhaust condenser. An automatic shutdown occurred on October 16, 1983. '
The following safety-related maintenance was performed in the month of October:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Removed waste evaporator condensate tank manway cover.
- 3. Overhauled #9 river water pump.
- 4. Replaced numerous waste evaporator filters.
- 5. Repaired refueling water purification pump.
t
I
.t 6 s OPERATING DATA REPORT DOCKET NO. 5C-348
~
DATE 10-7-83 COMPLETED BY TL C Hnirston, III TELEPHONE (209899-5156 OPERATING STATUS
~
!. Unit Name: Joseph M. Farley - Unit 1 1 Cumulative data since
- 2. Reporting Penod. October. 1983 12-1-77, date of commercial !
2652 operation.
- 3. Licensed Thennal Power (MWt):
860 .
- 4. Namepiste Rating (Gross MWe):
829 S. Demga Electrical Rating (Net MWe):
- 6. Mamamum Dependable Capacity (Gross MWe):
844.6
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report.Give Reasons:
N/A
- 9. Power Level To Which Restricted. If Any (Net MWe): $/A
- 10. Reasons For Restrictions.lf Any: N/A This Month Yr to.Dete "CEmulative 745 7,296 51.864
- 11. Hours la Reporting Period 33,659.2 723.5 5,513.7
- 12. Number Of Hours Reactor Was Critical 36.2 3,650.7 11.1
- 13. Reactor Reserve Shutdown Hours 684,9 5.372.2 32.639.4
- 14. Hours Generator On.Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 13,729,161 82,219,210
- 16. Gross Thermal Energy Generated (MWH) 1.789.981
- 17. Gross Electrical Energy Generated (MWH) 567.630 4.332.748 ___26.103.332 537.068 4,081,870 24.522.090
- 18. Net Electrical Energy Generated (MWH) ~
91.9 73.6 62.9
- 19. Unit Service Factor 73.6 62.9 91.9
- 20. Unit Availability Factor 58.8
- 89.7 69.6
- 21. Unit Capacity Factor (Using MDC Net) 57.0 i
87.0 67.5
- 22. Unit Capacity Factor (Using DER Net) 1.6 15.9 8.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration of Each t: .
Ref uel i no /mmine enant.o nnemos; Fahrnary 1QRA 60 en 70 Anye N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Forecast Achieved
- 26. Units in Test Status (Prior to Commercial Operation):
' 8/6/77 8/9/77 INITIA L CRITICALITY 8/20/77 8/18/77 INITIAL ELECTRICITY 12/1/77 12/1/77 COMMERCIAL OPERATION 1
5 (4/771
~
DOC)CET No. 50-348 I )
UNIT DA77. 11/6/33 W . Hairston, III l COMPLETED BY -
IT.LEPHONE (205)899-5156 gong, October, 1983 .
DAY - AVERAGE DAILY POWER LEVEL ' DAY' AVERACE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 0 803 17
. l 700 13 472 2
795 19 795 J ~
791 794 4' 20 789 794 3 33_
800 797 6 .
22 801 795 23 7
798 24 802 g
799 15- 803 9
807 10 798 26 804 27 704 1g 796 842 12 23 y 808 640 33 842 0 30 14 808 727 3g i . 35 l 16 _
670 l
l -
INSTRUCTIONS On this formst. list the averste daily vmt power levelin MWe Net for each d:y in the reporting month. Compute o j
. the neatest whole me;swatt.
l .
l (9(77) l l
l
DOCKET NO.1Q-348 UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT NAME J.LFarley - hit ] *
. DATE lifft/83 COMPLETED BY WG.Hairston. III
' REPORT MONTil . 0ctober. 1983 fEl.EPilONE (2D5)899-5156 "k -
h
- .! g };; E Licensee Eg Cause & Coureceive No. Date E 7." g .2!Eac Event p pO Actiem in N jE & I; g a Repuet
- in u uo Prevent Recuesence 2 R
- 6 i .
F 26.4 A NA HD HTEXCH Unit taken off line to repair turbine
! 005 831013 1 gland exhaust condenser.
i '
006 831016 F 33.7 A 3 NA IA INSTRU With one overtempera,ture delta temperature channel in test a spike on j
a second channel caused a reactor trip.
1 . A subsequent reactor trip occurred due to Loto S/G 1evel caused by operator error.
1 NOTE: Event numbers reflect a revision I to this page in the January -
' June reports. Events for Januar: '-
' June 1983 were incorrectly numbered, l l .
3 4 l 1 F: linted Reasim: Method: Exhibit G Insituctiims S: Stheduled A Equipment Failure (Explain) l-Manual for Preparation of D.iis II. Maintenance of Test 2. Manual Scram. Entry Sheels for f.itensee C Refueling 3 Autinnatic Sceam. Event Repost (1.ER) F;te INilREG-
! 4 Oeher (Explain) 01611 D Regulatiny Restsittlem E.Opesaint Tealning A IJcense Examination F Adininisisative 5 .
l ti Opaatiemal Escur (Explain) Esinbis 1 Same Source l
19f77) ll Olhes (E xpl.dn)
I 4
i _