s OPERATING DATA REPORT i
DOCKET NO. 50-348 DATE l.Q.-Z 8.l COMPLETED BY u_ c linirston, III TELEPHONE (20s1899-5156 OPERATING STATUS f
Notes
- 1. Unit Name: J seph M. Farley - Unit 1
- 1) Cumulative data since
- 2. Reporting Pened. October. 1983 12-1-77, date of connaercial 2652
- 3. Licensed Thennal Power (MWt):
operation.
860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Desaga Electrical Rating (Net MWe):
844.6
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
N/A This Month Yr to.Date
" Cur'nulative
- 11. Hours In Reporting Period 745 7,296 51.864
- 12. Number Of Hours Resctor Was Critical 723.5 5,511.7 33,659.2 11.1 36.2 3,650.7
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 684.9 5.371.2 32.639.4 0.0 0.0 oo
- 15. Unit Reserve Shutdown Hours
- 16. Grom Thermal Energy Generated (MWH) 1.789.981 13,729,161 82,219,210
- 17. Gross Electrical Energy Generated (MWH) 567.630 4.332.748 26.103.332
- 18. Net Electrica! Energy Generated (MWH) 537.068 4,081,870 24.522.090 91 9 73.6 62.9
- 19. Unit Service Factor 91.9 73.6 62.9
- 20. Unit Availability Factor 89.7 69.6 58.8
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 87.0 67.5 57.0 8.1 1.6 15.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each 6:
Refnpl ing /mn inc onnni o nurnge. Fahrunry IQR4 60 en 70 anye N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved 8/6/77 8/9/77 iNITIA L CRITICA LITY INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/7)
DR 831110 R
DOCK 0500034g i
PDR pn;7,
-.. ~.. -. -
pocyr 30, 50-348 1
UNIT DAE II/6/83 C OSfP!.E H D S Y
.G. Hairston, III ELEPHONE (205)899-5156 AIONT11 Oct ber. 1983 DAY AVERACE DA!LY POWER LEVEL
- DAY' AVERAGE DAILY POWER LEVEL (hiWe-Net)
(5tWe Net) 0 803 37 2
700 13 472 795 39 795 3
794 4'
791 20 789 794 3
21, 797 800 22 6
~
795 801 23 7
g 798 24 802 9
799 25 803 807 10 798 3
13 804 27 704 4
842 796 3
(2 808 640 3
13 842 14 0
30 808 727 3g 35 16 670 I
INSTRUCUONS On tiiis formst. list the averste daily unit puweilevelin MWe-Net for each d:y in the reportin5 munth. Campure to
, the neare:t whole me;swatt.
(9(77)
DOCKET No.10-348 UNITS 1101 DOWNS AND POWER REDUCTIONS UNIT NAME J.M.Farlev tinit I DA1E 11/6/83 COMPLETED BY LL}lairston. III REPORT MONTIl October. 1983 TEl.EPilONE f.ZD3)899-5156 3
h'8 Cause & Courective I
) 5 acEh jp "g
th cusee Eg Action to No.
Date k
Eg 2
Event p
go jE E gy, e Repost a u
Psevent Recurrence mo o
1 26 005 831013 F
26.4 A
1 NA HD llTEXCH Unit taken off line to repair turbine j
gland exhaust condenser.
006 831016 F
33.7 A
3 NA IA INSTRU With one overtemperature delta temperature channel in test a spike on a second channel caused a reactor trip.
A subsequent reactor trip occurred dua to LoLo S/G 1evel caused by operator error.
NOTE: Event numbers reflect a revision to this page in the January -
June reports. Events for Januar!'-
t June 1983 were incorrectly numbered.
4 1
2 3
4 F: linted Reasim:
Method:
Exhibit G. Instructi..as
}
S: Stheduled A Equipment Failure (Explain) 1 Manual for Preparatimi ni Dan s Il4taintenance of Test 24tanual Scram.
Entry Sheets foi 1.i cnsee i
C Refueling 3 Automatic Scram.
Etent Repost (l.ER) F;1e iNilREG-D llegulainey Restsiction 4 Other(Emplain) 01611 E Opesator Training A license Examination F Administsative 5
G Ope:Jtismal Enor (Explain) thlobit 1 - Same Source l'lf 77) 11 Othes (E splain)
50-348 DOCKET NO.
UNIT SilUTDOWNS AND POWER REIM)CTIONS UNIT NAhlE _ J.M.Farley-Unit 1 DATE 2/02/8'l COkfrLETED IlY W G.Hairston.III REPORT kf0NTil T AWAuv TELErilONE.(205) 899-5156 3
,$g
}
E' k Licensee E-r, h,,
Cause & Cursective No.
Date k
T. g
,y5 Event gg pu Actiam to
-jE gigg Repint
- g v> U Pieven Recussence H
6 001 830114 S
411.5 C
3 NA NA NA Unit was shut down for Cycle 4 - Cycle 5 refueling outage. While ramping down for the schedul.ed outage, the reactor tripped prematurely due to low i
steam generator level.
,i
)
i 4
1 i
i 1
2 3
4 i
I:: I:osted Reasim:
klethod:
Enliibit G. Instruction S: Scheduled A Equipment Failuse(Explain) 1 klanuit for Preparation of D.it i ll klaintenance o( Teet 2 !.:anual Scram.
Entry Sheets for I.icen c j
C-Refueling 3 Automatic Scram.
Eveni ReposI (l.1:RI I ilc INUHliG-D-Regulatoiy Hestrictism 4 Oslies (Emple.in) 0161)
E Operator Training A license Examination F-Administeative 5
1 G Opciational Enus (linplain) lishibis I S.ime Soue.
(9/17) 11 Othes (l!xplain) i
DOCKETNO.
50-348 UNIT SIIU1 DOWNS AND POWER REDUC 110NS UNIT NAME J.M.Farley-Unit 1, DA1E 3/02/83 COMPLETEI) BY 1 G.Hairston.III REPORT MONTil FEBRUARY TELEPllONE (205) 899-5156
-_ "h E
jg "g
j Fh Licensee
[v,,
j{a.,
Cause & Corrective No.
Date
{
3g
.;; 5 5 Event p
Action to fI 5
Egc Report #
O Pacvent Recurrence mu H
o 2
i 6
1 001 830201 S
672 C
3 NA NA NA The Unit 1 Cycle 4 - Cycle 5 refueling outage continued from 1/31/83.
t i
1 l
i j
1 1
2 3
4 i: Eosted Reason:
Method:
Exhibit G. Inst ruction S. Scheduled A Equipment Failure (Esplain) 1 -Manual for Preparation of D.it -
Il-Maintenance of Test 2-Mannal Scram.
Entry Sheets for I.iten -
C Refueling 3 Autonutic Sciam.
Evenn Repost (1.ER)1 1. INUMEG-
)
D llegulatiny Hest iction 4-Other (Explaisi) 0161)
E Ope ator Tsaining & license Examination F Administsative 5
G Opciational Leror (Explain)
INinbis I Same Sour.
19f77) 11 Olhes (E xplain)
/;
DOCKET NO. 50-348 UNIT Sil01 DOWNS AND POWER REDUCTIONS UNIT NAME J.M.Farlev-Unit 1.
DAIE _s/02/83 COMPl.ETED IlY leLf..Haira r nn ; T T I REPORT MONTil MARCH TEl.EPilONE _12.05) 899-5156
,5 3
[
- 1. ice:Isce E r, gg Cause & Con receive
~
No.
Date k
5g g
2g&
Event g?
gui Action si, mo Psevent Recurrence f5 5
jgg Repos
- g H
1 6
+- '
)
001 830201 S
713.6 C
3 NA NA NA The Unit 1 Cycle 4 - Cycle 5' refueling outage continued from 2/28/83.
i 1 i
l
+
)
- s..
s 1
+
s s
s s'
ya r
~%.
s c.
~
s
)
g y
3 4
. -. i
{
F: foued Reawn:
Metheml:
Exhible G-Instroccio,
'N 4
S: kheiluled 4 A Fquipment Failure (Ex;laiti)
- 1. Manual for Prepnation of D.o.
15 Maintenance o(Test 2 Manual Scram.
Entiy Sheets for I.icco -
C-Reincling.
3 Automatic Scram.
Event Reping (I.ERI I i'. t NURI G-D llegulatomy Resiniction 4 Other (Emplain) 0161)
E-Operator Tsaining & Ilicense Examination
.l,
~,
x s
s F-Ausinist eative 5
.5
('l/17)
G Opciational 1.s tor (Explain)
Eshihis I. sanie Si.co-
~
, s ll Othes (Esphhi),
'. s.
s
,.\\ue-ew
(
b T
f)OCKET NO.
50-348 UNIT SIIU1 DOWNS AND POWER REDUCTIONS UNIT NAhlE J.M.Farley-Unit 1 DATE 51.02/83 COhlrEETED BY _LG. Hairs t on - III REPORT hlONTil APRTT.
yp gqq,g g E
E
.! E "g
j $}
Licensee E t.
j%
Cause & Corrective No.
Date k
li g jgm Event y?
a.1 Action to
$5 5
jigg Report #
fu in U Pievent Recuricuce F
6 i
f 002 830413 S
38.3 B
1 NA NA NA Turbine overspeed trip test; j
maintenance outage.
1 1
i i
2 3
4 I
I:: I orted Reason:
hiethext:
Exhibit G. Instruction:
1 S: Scheduled A l'quipment Failure (Explain) 1.hlanual for Pseparation of D.it '
Il41aintenance of Test 24l.mual Scram.
Entry Sheets for I.itro.
i C-Ilefueling 3 Automatic Scram.
Event Report (i.ER)I a. 'NUREG-l D llegulatosy Restriction 4 Other (Explaio) 0161)
I? operator Training A license Examination F. Administ rative 5
G Opciational Eeror (Explain)
E sInhit I - Same Soon.
l l'7/17) 11 Othes (E xpliin)
1 DOCKET NO.59-348 UNIT S1101 DOWNS AND POWER REI}UCI10NS UNIT N AhlE J.M.Farlev-Unit 1 I)A1E._6/_02/8.3 COMPLETED BY
.W.G.Hairston. III REPORT MONTil MAY TEl.EPilONE _(205) 899-5156 w.
E E
E-
E' U Licensee E-r E'q, Cause & Conective No.
Date
[
5!
3$d Event y
f'8 Action to
[Z E
j;gg Repost #
g vs O u
l'acvent Hecurrence F-6 003 830525 F
o B
4 83-024/03L-0 CB VALVEX Unit was reduced to 35% during resolution of RCS unidentified leakage in excess of 1 GPM.
i 4
i i
4 4
i i
1 2
3 4
F: F.uted Reason:
Method:
Exhibit G. Instruction.
S: Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparition of I).ii.
llahintenance of Test 24fanual Scram.
Entry Sheets for 1.icen n j
C.Hefueling
- 3. Automatic Scians.
Esent Repost (l.ER)I
- 1NUMEG.
D Hegniatoiy Resteiction 4.Dehen (Explain) 0161)
E.Opceator Tsaining & 1.icense Exaspination F. Administ sative 5
G Opciational Essor (Emplain)
Esinbit I Same Sinn.
i 19/77) 11 Othes (E xplain)
I)OCKET No. 50-348 UNIT SIIU1 DOWNS ANI) POWER REIM)C110NS UNIT NAhlE.LEFarlev-Unit 1.
DATE Zl06/83 4
COhll'LETEI) ny IL.C.Hai r me nn TII REPORT &lONTil JUNE TELEPilONE.4205) 800-515A i
jg
[
Licensee Eg e.,
Cause & Conective No.
Date h
5g g
2 g ac Event gy gu3 Action to v> U Prevent Recurrence F
yI 5
gg Report
- g 6
004 830615 F
29.3 A
NA NA UD llTEXCH Unit taken off line to repair turbine gland steam exhaust condenser following failure of the condenser fan.
j l
i i
i I
2 3
4 i
l~: I:o.ced Reason:
hiethod:
Exhibit G. Instruction.
S: Scheduled A Equipment Failure (Explain) l-klanual for Preparatiem of Dat -
/
11 klaintenance of Test 2 htannal Scram.
Entiy Sheets for I.itesi ~ l C.RcIncling
- 3. Antomatic Scram.
Esent Repost (1.1:Ril & INilRI:G.
j D Itegulaemy Restsiction 4 Other (Explain) 0161) j E-Operator Tsaining A license Examination F. Administ salive 5
j G Opciational Lisor (linplain) lisinbit I-Same Som.
19/H) 11 Olhes (E xplain)
}
6 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS OCTOBER, 1983 During the month of October, there were two (2) unit shutdowns.
On October 13, 1983 a manual shutdown was initiated for repair of-the turbine gland exhaust condenser.
An automatic shutdown occurred on October 16, 1983.
The following safety-related maintenance was performed in the month of October:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Removed waste evaporator condensate tank manway cover.
3.
Overhauled #9 river water pump.
4.
Replaced numerous waste evaporator filters.
5.
Repaired refueling water purification pump.
t
I
.t 6
s OPERATING DATA REPORT DOCKET NO. 5C-348 DATE 10-7-83
~
COMPLETED BY TL C Hnirston, III TELEPHONE (209899-5156 OPERATING STATUS
!. Unit Name: Joseph M. Farley - Unit 1
~
1 Cumulative data since
- 2. Reporting Penod. October. 1983 12-1-77, date of commercial 2652
- 3. Licensed Thennal Power (MWt):
operation.
860
- 4. Namepiste Rating (Gross MWe):
829 S. Demga Electrical Rating (Net MWe):
844.6
- 6. Mamamum Dependable Capacity (Gross MWe):
803.6
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report.Give Reasons:
N/A
$/A
- 9. Power Level To Which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
This Month Yr to.Dete "CEmulative 745 7,296 51.864
- 11. Hours la Reporting Period 723.5 5,513.7 33,659.2
- 12. Number Of Hours Reactor Was Critical 11.1 36.2 3,650.7
- 13. Reactor Reserve Shutdown Hours 684,9 5.372.2 32.639.4
- 14. Hours Generator On.Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 1.789.981 13,729,161 82,219,210
- 16. Gross Thermal Energy Generated (MWH)
___26.103.332 567.630 4.332.748
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) ~
537.068 4,081,870 24.522.090 91.9 73.6 62.9
- 19. Unit Service Factor 91.9 73.6 62.9
- 20. Unit Availability Factor 89.7 69.6 58.8
- 21. Unit Capacity Factor (Using MDC Net) i 87.0 67.5 57.0
- 22. Unit Capacity Factor (Using DER Net) 8.1 1.6 15.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration of Each t:
Ref uel i no /mmine enant.o nnemos; Fahrnary 1QRA 60 en 70 Anye N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Forecast Achieved
- 26. Units in Test Status (Prior to Commercial Operation):
8/6/77 8/9/77 INITIA L CRITICALITY 8/20/77 8/18/77 INITIAL ELECTRICITY 12/1/77 12/1/77 COMMERCIAL OPERATION 1
5 (4/771
DOC)CET No.
50-348
~
UNIT I
DA77.
11/6/33 COMPLETED BY W. Hairston, III IT.LEPHONE (205)899-5156 October, 1983
- gong, DAY - AVERAGE DAILY POWER LEVEL '
DAY' AVERACE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 803 17 472 700 13 2
795 19 795 J
~
794 4'
791 20 794 789 3
33_
797 800 22 6
795 801 23 7
g 798 24 802 799 15-803 9
807 798 26 10 704 804 27 1g 842 796 23 12 808 640 y
33 842 0
30 14 808 727 3g 35 i
670 l
16 l
l INSTRUCTIONS On this formst. list the averste daily vmt power levelin MWe Net for each d:y in the reporting month. Compute o
. the neatest whole me;swatt.
j l
l (9(77) l l
l
DOCKET NO.1Q-348 UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT NAME J.LFarley - hit ]
DATE lifft/83 COMPLETED BY WG.Hairston. III REPORT MONTil. 0ctober. 1983 fEl.EPilONE (2D5)899-5156 "k
.! g
}
E Licensee Eg h
Cause & Coureceive Actiem in No.
Date E
7." g
.2!Eac Event p
pO N
jE I; g a Repuet
- u in u Prevent Recuesence o
2 R6 i
005 831013 F
26.4 A
1 NA HD HTEXCH Unit taken off line to repair turbine gland exhaust condenser.
i 006 831016 F
33.7 A
3 NA IA INSTRU With one overtempera,ture delta temperature channel in test a spike on j
a second channel caused a reactor trip.
1 A subsequent reactor trip occurred due to Loto S/G 1evel caused by operator error.
1 NOTE: Event numbers reflect a revision I
to this page in the January -
June reports. Events for Januar: '-
June 1983 were incorrectly
- numbered, l
l l
1 3
4 F: linted Reasim:
Method:
Exhibit G Insituctiims S: Stheduled A Equipment Failure (Explain) l-Manual for Preparation of D.iis II. Maintenance of Test
- 2. Manual Scram.
Entry Sheels for f.itensee C Refueling 3 Autinnatic Sceam.
Event Repost (1.ER) F;te INilREG-l D Regulatiny Restsittlem 4 Oeher (Explain) 01611 E.Opesaint Tealning A IJcense Examination l
F Adininisisative 5
l ti Opaatiemal Escur (Explain)
Esinbis 1 Same Source 19f77) ll Olhes (E xpl.dn)
I 4
i