s OPERATING DATA REPORT i

DOCKET NO. 50-348 DATE l.Q.-Z 8.l COMPLETED BY u_ c linirston, III TELEPHONE (20s1899-5156 OPERATING STATUS f

Notes

1. Unit Name: J seph M. Farley - Unit 1
1) Cumulative data since
2. Reporting Pened. October. 1983 12-1-77, date of connaercial 2652
3. Licensed Thennal Power (MWt):

operation.

860

4. Nameplate Rating (Gross MWe):

829

5. Desaga Electrical Rating (Net MWe):

844.6

6. Maximum Dependable Capacity (Gross MWe):

803.6

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe):

N/A

10. Reasons For Restrictions.If Any:

N/A This Month Yr to.Date

" Cur'nulative

11. Hours In Reporting Period 745 7,296 51.864
12. Number Of Hours Resctor Was Critical 723.5 5,511.7 33,659.2 11.1 36.2 3,650.7
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 684.9 5.371.2 32.639.4 0.0 0.0 oo
15. Unit Reserve Shutdown Hours
16. Grom Thermal Energy Generated (MWH) 1.789.981 13,729,161 82,219,210
17. Gross Electrical Energy Generated (MWH) 567.630 4.332.748 26.103.332
18. Net Electrica! Energy Generated (MWH) 537.068 4,081,870 24.522.090 91 9 73.6 62.9
19. Unit Service Factor 91.9 73.6 62.9
20. Unit Availability Factor 89.7 69.6 58.8
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 87.0 67.5 57.0 8.1 1.6 15.9
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each 6:

Refnpl ing /mn inc onnni o nurnge. Fahrunry IQR4 60 en 70 anye N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved 8/6/77 8/9/77 iNITIA L CRITICA LITY INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/7)

DR 831110 R

DOCK 0500034g i

PDR pn;7,

-.. ~.. -. -

pocyr 30, 50-348 1

UNIT DAE II/6/83 C OSfP!.E H D S Y

.G. Hairston, III ELEPHONE (205)899-5156 AIONT11 Oct ber. 1983 DAY AVERACE DA!LY POWER LEVEL

  • DAY' AVERAGE DAILY POWER LEVEL (hiWe-Net)

(5tWe Net) 0 803 37 2

700 13 472 795 39 795 3

794 4'

791 20 789 794 3

21, 797 800 22 6

~

795 801 23 7

g 798 24 802 9

799 25 803 807 10 798 3

13 804 27 704 4

842 796 3

(2 808 640 3

13 842 14 0

30 808 727 3g 35 16 670 I

INSTRUCUONS On tiiis formst. list the averste daily unit puweilevelin MWe-Net for each d:y in the reportin5 munth. Campure to

, the neare:t whole me;swatt.

(9(77)

DOCKET No.10-348 UNITS 1101 DOWNS AND POWER REDUCTIONS UNIT NAME J.M.Farlev tinit I DA1E 11/6/83 COMPLETED BY LL}lairston. III REPORT MONTIl October. 1983 TEl.EPilONE f.ZD3)899-5156 3

h'8 Cause & Courective I

) 5 acEh jp "g

th cusee Eg Action to No.

Date k

Eg 2

Event p

go jE E gy, e Repost a u

Psevent Recurrence mo o

1 26 005 831013 F

26.4 A

1 NA HD llTEXCH Unit taken off line to repair turbine j

gland exhaust condenser.

006 831016 F

33.7 A

3 NA IA INSTRU With one overtemperature delta temperature channel in test a spike on a second channel caused a reactor trip.

A subsequent reactor trip occurred dua to LoLo S/G 1evel caused by operator error.

NOTE: Event numbers reflect a revision to this page in the January -

June reports. Events for Januar!'-

t June 1983 were incorrectly numbered.

4 1

2 3

4 F: linted Reasim:

Method:

Exhibit G. Instructi..as

}

S: Stheduled A Equipment Failure (Explain) 1 Manual for Preparatimi ni Dan s Il4taintenance of Test 24tanual Scram.

Entry Sheets foi 1.i cnsee i

C Refueling 3 Automatic Scram.

Etent Repost (l.ER) F;1e iNilREG-D llegulainey Restsiction 4 Other(Emplain) 01611 E Opesator Training A license Examination F Administsative 5

G Ope:Jtismal Enor (Explain) thlobit 1 - Same Source l'lf 77) 11 Othes (E splain)

50-348 DOCKET NO.

UNIT SilUTDOWNS AND POWER REIM)CTIONS UNIT NAhlE _ J.M.Farley-Unit 1 DATE 2/02/8'l COkfrLETED IlY W G.Hairston.III REPORT kf0NTil T AWAuv TELErilONE.(205) 899-5156 3

,$g

}

E' k Licensee E-r, h,,

Cause & Cursective No.

Date k

T. g

,y5 Event gg pu Actiam to

-jE gigg Repint

  • g v> U Pieven Recussence H

6 001 830114 S

411.5 C

3 NA NA NA Unit was shut down for Cycle 4 - Cycle 5 refueling outage. While ramping down for the schedul.ed outage, the reactor tripped prematurely due to low i

steam generator level.

,i

)

i 4

1 i

i 1

2 3

4 i

I:: I:osted Reasim:

klethod:

Enliibit G. Instruction S: Scheduled A Equipment Failuse(Explain) 1 klanuit for Preparation of D.it i ll klaintenance o( Teet 2 !.:anual Scram.

Entry Sheets for I.icen c j

C-Refueling 3 Automatic Scram.

Eveni ReposI (l.1:RI I ilc INUHliG-D-Regulatoiy Hestrictism 4 Oslies (Emple.in) 0161)

E Operator Training A license Examination F-Administeative 5

1 G Opciational Enus (linplain) lishibis I S.ime Soue.

(9/17) 11 Othes (l!xplain) i

DOCKETNO.

50-348 UNIT SIIU1 DOWNS AND POWER REDUC 110NS UNIT NAME J.M.Farley-Unit 1, DA1E 3/02/83 COMPLETEI) BY 1 G.Hairston.III REPORT MONTil FEBRUARY TELEPllONE (205) 899-5156

-_ "h E

jg "g

j Fh Licensee

[v,,

j{a.,

Cause & Corrective No.

Date

{

3g

.;; 5 5 Event p

Action to fI 5

Egc Report #

O Pacvent Recurrence mu H

o 2

i 6

1 001 830201 S

672 C

3 NA NA NA The Unit 1 Cycle 4 - Cycle 5 refueling outage continued from 1/31/83.

t i

1 l

i j

1 1

2 3

4 i: Eosted Reason:

Method:

Exhibit G. Inst ruction S. Scheduled A Equipment Failure (Esplain) 1 -Manual for Preparation of D.it -

Il-Maintenance of Test 2-Mannal Scram.

Entry Sheets for I.iten -

C Refueling 3 Autonutic Sciam.

Evenn Repost (1.ER)1 1. INUMEG-

)

D llegulatiny Hest iction 4-Other (Explaisi) 0161)

E Ope ator Tsaining & license Examination F Administsative 5

G Opciational Leror (Explain)

INinbis I Same Sour.

19f77) 11 Olhes (E xplain)

/;

DOCKET NO. 50-348 UNIT Sil01 DOWNS AND POWER REDUCTIONS UNIT NAME J.M.Farlev-Unit 1.

DAIE _s/02/83 COMPl.ETED IlY leLf..Haira r nn ; T T I REPORT MONTil MARCH TEl.EPilONE _12.05) 899-5156

,5 3

[

1. ice:Isce E r, gg Cause & Con receive

~

No.

Date k

5g g

2g&

Event g?

gui Action si, mo Psevent Recurrence f5 5

jgg Repos

  • g H

1 6

+- '

)

001 830201 S

713.6 C

3 NA NA NA The Unit 1 Cycle 4 - Cycle 5' refueling outage continued from 2/28/83.

i 1 i

l

+

)

- s..

s 1

+

s s

s s'

ya r

~%.

s c.

~

s

)

g y

3 4

. -. i

{

F: foued Reawn:

Metheml:

Exhible G-Instroccio,

'N 4

S: kheiluled 4 A Fquipment Failure (Ex;laiti)

1. Manual for Prepnation of D.o.

15 Maintenance o(Test 2 Manual Scram.

Entiy Sheets for I.icco -

C-Reincling.

3 Automatic Scram.

Event Reping (I.ERI I i'. t NURI G-D llegulatomy Resiniction 4 Other (Emplain) 0161)

E-Operator Tsaining & Ilicense Examination

.l,

~,

x s

s F-Ausinist eative 5

.5

('l/17)

G Opciational 1.s tor (Explain)

Eshihis I. sanie Si.co-

~

, s ll Othes (Esphhi),

'. s.

s

,.\\ue-ew

(

b T

f)OCKET NO.

50-348 UNIT SIIU1 DOWNS AND POWER REDUCTIONS UNIT NAhlE J.M.Farley-Unit 1 DATE 51.02/83 COhlrEETED BY _LG. Hairs t on - III REPORT hlONTil APRTT.

yp gqq,g g E

E

.! E "g

j $}

Licensee E t.

j%

Cause & Corrective No.

Date k

li g jgm Event y?

a.1 Action to

$5 5

jigg Report #

fu in U Pievent Recuricuce F

6 i

f 002 830413 S

38.3 B

1 NA NA NA Turbine overspeed trip test; j

maintenance outage.

1 1

i i

2 3

4 I

I:: I orted Reason:

hiethext:

Exhibit G. Instruction:

1 S: Scheduled A l'quipment Failure (Explain) 1.hlanual for Pseparation of D.it '

Il41aintenance of Test 24l.mual Scram.

Entry Sheets for I.itro.

i C-Ilefueling 3 Automatic Scram.

Event Report (i.ER)I a. 'NUREG-l D llegulatosy Restriction 4 Other (Explaio) 0161)

I? operator Training A license Examination F. Administ rative 5

G Opciational Eeror (Explain)

E sInhit I - Same Soon.

l l'7/17) 11 Othes (E xpliin)

1 DOCKET NO.59-348 UNIT S1101 DOWNS AND POWER REI}UCI10NS UNIT N AhlE J.M.Farlev-Unit 1 I)A1E._6/_02/8.3 COMPLETED BY

.W.G.Hairston. III REPORT MONTil MAY TEl.EPilONE _(205) 899-5156 w.

E E

E-

E' U Licensee E-r E'q, Cause & Conective No.

Date

[

5!

3$d Event y

f'8 Action to

[Z E

j;gg Repost #

g vs O u

l'acvent Hecurrence F-6 003 830525 F

o B

4 83-024/03L-0 CB VALVEX Unit was reduced to 35% during resolution of RCS unidentified leakage in excess of 1 GPM.

i 4

i i

4 4

i i

1 2

3 4

F: F.uted Reason:

Method:

Exhibit G. Instruction.

S: Scheduled A Equipment Failure (Explain)

1. Manual for Preparition of I).ii.

llahintenance of Test 24fanual Scram.

Entry Sheets for 1.icen n j

C.Hefueling

3. Automatic Scians.

Esent Repost (l.ER)I

  • 1NUMEG.

D Hegniatoiy Resteiction 4.Dehen (Explain) 0161)

E.Opceator Tsaining & 1.icense Exaspination F. Administ sative 5

G Opciational Essor (Emplain)

Esinbit I Same Sinn.

i 19/77) 11 Othes (E xplain)

I)OCKET No. 50-348 UNIT SIIU1 DOWNS ANI) POWER REIM)C110NS UNIT NAhlE.LEFarlev-Unit 1.

DATE Zl06/83 4

COhll'LETEI) ny IL.C.Hai r me nn TII REPORT &lONTil JUNE TELEPilONE.4205) 800-515A i

jg

[

Licensee Eg e.,

Cause & Conective No.

Date h

5g g

2 g ac Event gy gu3 Action to v> U Prevent Recurrence F

yI 5

gg Report

  • g 6

004 830615 F

29.3 A

NA NA UD llTEXCH Unit taken off line to repair turbine gland steam exhaust condenser following failure of the condenser fan.

j l

i i

i I

2 3

4 i

l~: I:o.ced Reason:

hiethod:

Exhibit G. Instruction.

S: Scheduled A Equipment Failure (Explain) l-klanual for Preparatiem of Dat -

/

11 klaintenance of Test 2 htannal Scram.

Entiy Sheets for I.itesi ~ l C.RcIncling

3. Antomatic Scram.

Esent Repost (1.1:Ril & INilRI:G.

j D Itegulaemy Restsiction 4 Other (Explain) 0161) j E-Operator Tsaining A license Examination F. Administ salive 5

j G Opciational Lisor (linplain) lisinbit I-Same Som.

19/H) 11 Olhes (E xplain)

}

6 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS OCTOBER, 1983 During the month of October, there were two (2) unit shutdowns.

On October 13, 1983 a manual shutdown was initiated for repair of-the turbine gland exhaust condenser.

An automatic shutdown occurred on October 16, 1983.

The following safety-related maintenance was performed in the month of October:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Removed waste evaporator condensate tank manway cover.

3.

Overhauled #9 river water pump.

4.

Replaced numerous waste evaporator filters.

5.

Repaired refueling water purification pump.

t

I

.t 6

s OPERATING DATA REPORT DOCKET NO. 5C-348 DATE 10-7-83

~

COMPLETED BY TL C Hnirston, III TELEPHONE (209899-5156 OPERATING STATUS

!. Unit Name: Joseph M. Farley - Unit 1

~

1 Cumulative data since

2. Reporting Penod. October. 1983 12-1-77, date of commercial 2652
3. Licensed Thennal Power (MWt):

operation.

860

4. Namepiste Rating (Gross MWe):

829 S. Demga Electrical Rating (Net MWe):

844.6

6. Mamamum Dependable Capacity (Gross MWe):

803.6

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since.Last Report.Give Reasons:

N/A

$/A

9. Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions.lf Any:

This Month Yr to.Dete "CEmulative 745 7,296 51.864

11. Hours la Reporting Period 723.5 5,513.7 33,659.2
12. Number Of Hours Reactor Was Critical 11.1 36.2 3,650.7
13. Reactor Reserve Shutdown Hours 684,9 5.372.2 32.639.4
14. Hours Generator On.Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 1.789.981 13,729,161 82,219,210
16. Gross Thermal Energy Generated (MWH)

___26.103.332 567.630 4.332.748

17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) ~

537.068 4,081,870 24.522.090 91.9 73.6 62.9

19. Unit Service Factor 91.9 73.6 62.9
20. Unit Availability Factor 89.7 69.6 58.8
21. Unit Capacity Factor (Using MDC Net) i 87.0 67.5 57.0
22. Unit Capacity Factor (Using DER Net) 8.1 1.6 15.9
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Dete, and Duration of Each t:

Ref uel i no /mmine enant.o nnemos; Fahrnary 1QRA 60 en 70 Anye N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

Forecast Achieved

26. Units in Test Status (Prior to Commercial Operation):

8/6/77 8/9/77 INITIA L CRITICALITY 8/20/77 8/18/77 INITIAL ELECTRICITY 12/1/77 12/1/77 COMMERCIAL OPERATION 1

5 (4/771

DOC)CET No.

50-348

~

UNIT I

DA77.

11/6/33 COMPLETED BY W. Hairston, III IT.LEPHONE (205)899-5156 October, 1983

gong, DAY - AVERAGE DAILY POWER LEVEL '

DAY' AVERACE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 803 17 472 700 13 2

795 19 795 J

~

794 4'

791 20 794 789 3

33_

797 800 22 6

795 801 23 7

g 798 24 802 799 15-803 9

807 798 26 10 704 804 27 1g 842 796 23 12 808 640 y

33 842 0

30 14 808 727 3g 35 i

670 l

16 l

l INSTRUCTIONS On this formst. list the averste daily vmt power levelin MWe Net for each d:y in the reporting month. Compute o

. the neatest whole me;swatt.

j l

l (9(77) l l

l

DOCKET NO.1Q-348 UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT NAME J.LFarley - hit ]

DATE lifft/83 COMPLETED BY WG.Hairston. III REPORT MONTil. 0ctober. 1983 fEl.EPilONE (2D5)899-5156 "k

.! g

}

E Licensee Eg h

Cause & Coureceive Actiem in No.

Date E

7." g

.2!Eac Event p

pO N

jE I; g a Repuet

  • u in u Prevent Recuesence o

2 R6 i

005 831013 F

26.4 A

1 NA HD HTEXCH Unit taken off line to repair turbine gland exhaust condenser.

i 006 831016 F

33.7 A

3 NA IA INSTRU With one overtempera,ture delta temperature channel in test a spike on j

a second channel caused a reactor trip.

1 A subsequent reactor trip occurred due to Loto S/G 1evel caused by operator error.

1 NOTE: Event numbers reflect a revision I

to this page in the January -

June reports. Events for Januar: '-

June 1983 were incorrectly

numbered, l

l l

1 3

4 F: linted Reasim:

Method:

Exhibit G Insituctiims S: Stheduled A Equipment Failure (Explain) l-Manual for Preparation of D.iis II. Maintenance of Test

2. Manual Scram.

Entry Sheels for f.itensee C Refueling 3 Autinnatic Sceam.

Event Repost (1.ER) F;te INilREG-l D Regulatiny Restsittlem 4 Oeher (Explain) 01611 E.Opesaint Tealning A IJcense Examination l

F Adininisisative 5

l ti Opaatiemal Escur (Explain)

Esinbis 1 Same Source 19f77) ll Olhes (E xpl.dn)

I 4

i