6

'.. Attachment 4-  !

ULNRC-3114 i

3 5

b l

PROPOSED TECHNICAL SPECIFICATION CHANGES ,

l i

I SPECIFICATIONS: 3/4.8.1 MARKUP SPECIFICATIONS: 3/4.8.1 RETYPED b

I r

i I

l l

9412200044 941209 PDR ADOCK 05000483 P PDR

. ELECTRICAL POWER SYSTEMS

~

. SURVEILLANCE REOUIREMENTS (Cc, ti.ved)

7) Verifying the rjiesel generator cperates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to an indicated 6600 to 6821 kW*** and during the I remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to an indicated 6000 to 6201 kW.*** The generator voltage i and frequency shall be 4000 320 volts and 60 + 1.2,-3 Hz within 12 seco.nds_after_the start signa _1; the steady-state generator

'Itage ind frequency shall be maintained within 4000 + 320 volts Within 5 d nute: :Rer cesplet- 4 and ing th 60G + 1.2 Hz during 2'-hour this--test [pect'ic:ti:n '.S.1.1.2f.5)b)*;

t::t, p:rf

8) Verifying that the auto-connected loads to each diesel generator e do not exceed 6201 kW; (9) Verifying the diesel generator's capability to:

a) Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a simulated restora-tion of offsite power, b). Transfer its loads to the offsite power source, and c) Be restored to its standby status.

10) Verifying that with the diesel generc'.or operating in a test mode, connected to its bus, a simulated Safety Injection signal overrides the test mode by: (1) returning the diesel generator to standby operation, and (2) automatically energizing the emergency loads

) with offsite power;

11) Verifying that the fuel t sfer pump transfers fuel from each fuel storage tank to fie da nk of each diesel via the installed cross-connection li s ; -end-
12) Verifying that the automatic LOCA and shutdown sequence timer l n s.

l IN V ev ify shj the ptv 4. e m n u. of Spu's ks*L hio 4 9.L.l.Z5.61 N j t,. Aih s m.ade s .4 sk A .y 1,.s n Ws. &iet41 g e.nt raer C+ce l th4 A s*<t a4 g e.nte de r W M ls-em = pt rd e.6 g et*de r Wa n e r ego l h 2. h. e s er u nW 1 sp e e.4.% h.mp r o.49f e h ar t h,ble, d , At n In60s.44 looA d 5580 4 6 t al ncW .

"If S;;;if4 :tien '.S.1.1.21.5)b) i: net ::ti:f:cter 4 1y : m l:ted, it i: net  !

neces:: y te repe:t the preceding 2t-hour t::t. In:t::d the die:e1 gencr; tor Ley be :peret;d at 5201 k',! for I hour er until Oper: ting t p:r:ture 5::

t:bi't::d.
      • This band is meant as guidance to avoid routine overloading of the engine.

Leads in excess of this band for special testing under direct monitoring or momentary variations due to changing bus loads shall not invalidate this test. .

j -

- ~

CALLAWAY - UNIT 1 3/4 8-6 Amendment No. 21

A

, ELECTRICAL POWER SYSTEMS '

+

SURVEILLANCE REQUIREMENTS (Continued)

7) Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to an i indicated 6600 to 6821 kW and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to an indicated 6000 to 6201 kW. The generator voltage and frequency shall be 4000 i 320 volts and 60 + 1.2, 3 Hz within 12 seconds after the start signal; the  !

steady-state generator voltage and frequency shall be maintained within  !

4000 i 320 volts and 60 i 1.2 Hz during this test; j

8) Verifying that the auto-connected loads to each diesel generator do not  !

exceed 6201 kW:

9) Verifying the diesel generator's capability to: f i

a) Synchronize the offsite power source while the generator is loaded i with its emergency loads upon a simulated restoration of offsite power, l b) Transfer its loads to the offsite power source, and c) Be restored to its standby status. ,

10) Verifying that with the diesel generator operating in a test mode, connected to its bus, a simulated Safety injection signal overrides the test l mode by: (1) returning the diesel generator to standby operation, and (2) I automatically energizing the emergency loads with offsite power:
11) Verifying that the fuel transfer pump transfers fuel from each fuel storage tank to the day tank of each diesel via the installed cross-connection #

lines; E

12) Verifying that the automatic LOCA and shutdown sequence timer is

~

OPERABLE with the interval between each load block within i 10% of its  :

design interval; and

13) Verifying the performance of Specification 4.8.1.1.2f.6)b) within 5 i minutes of shutting down the diesel generator after the diesel generator has been operated for greater than or equal to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or until operating temperature has stabilized, at an indicated load of 5580 to 6201 kW.

}

  • * *This band is meant as guidance to avoid routine overloading of the engine. Loads in excess of this band for special testing under direct monitoring or momentary variations due to changing bus loads shall not invalidate this test.

CALLAWAY - UNIT 1 3/4 8-6 Amendment No. 21