Revised Monthly Operating Rept for Dec 1994 for Cooper Nuclear Station
ML20078P387
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/31/1994
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20078P382 List:
References
NUDOCS 9502170043
Download: ML20078P387 (1)


Text

'.

+

OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT CNS DATE February 10. 1995 OPERATING STATUS TELEPHONE f402) 825-5829

1. Unit Name: Cocoer Nuclear Station Notes
2. Reporting Period: December 1994
3. Licensed Thermal Power (MWt): 2381
4. Nameplate Rating (Gross MWe): 836
5. Design Electrical Rating (Net MWe): 778
6. Maximum Dependable Capacity (Gross MWe): 787
7. Maximum Dependable Capacity (Net MWe): 764
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, if Any (Net MWe):
10. Reasons For Restriction, if Any:

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 744.0 744.0 179.737.0
12. Number of Hours Reactor Was Critical O.0 0.0 133.190.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 0.0 0.0 131.279.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 271.311.244.0
17. Gross Electric Energy Generated (MWH) 0.0 0.0 88.118.345.0
18. Net Electric Energy Generated (MWH) 0.0 0.0 85.098.438.0
19. Unit Service Factor 0.0 0.0 73.0
20. Unit Availability Factor 0.0 0.0 73.0
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 62.0
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 60.9
23. Unit Forced Outage Rate 100.0 100.0 8.5
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None.

25. If Shut Down At End of Report Period. Estimated Date of Startup: Februarv 8.1995
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY l INITIAL ELECTRICITY COMMERCIAL OPERATION 9502170043 PDR 950210 R ADOCK 05000298 PDR