i OPERATIONS NARRATIVE l

COOPER NUCLEAR STATION January 1995 Cooper Nuclear Station shut down May 25,1994 to address Emergency Diesel Generator testing deficiencies, and remained shut down for the entire month of January,1995.

Cooper attained a unit capacity factor of 0.0 percent (MDC Net) for the month of January.

i l

9502170040 950210

{DR ADOCK 05000298 PDR l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

050-0298 UNIT NAME Cooper Nuclear Station DATE February 10.1995 COMPLETED BY E. A. Kemes Krause REPORT MONTH January 1995 TELEPHONE (4021 825-5829 Method Licensee Cause & Corrective Duration Of Event System

  • Component' Action to 94 o.

Date Type' (Hours)

Reason 8 Shutting Report Code Code Prevent Recurrence Down Reactor 8 94-5 5/25/94 F

744 H

1 94-009 EK 27 EDG 1 and EDG 2 declared inoperable due to insufficient UV relay testing.

1 1 F: Forced 2 Reason:

3 Method.

4 Extntxt G - Instructions for S: Scheduled A - Equipment Failure (Explaird 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets for Ucensee Event 1

C - Refueling 3 - Automatic Scram Report (LER) File (NUREG4161)

D - Regulatory Restnction 4 - Contmued i

E - Operator Traming & License Examination 5 - Reduced Load 5 Estutxt I - Same Source F - Admirnstrative 6 - Other 1

G - Operational Error (Explain)

H - Other (Explam)

a AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-0298 UNIT CNS DATE February 10. 1995 TELEPHONE (402) 825-5829 MONTH January 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

14 0

15 0

16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

e, OPERATING DATA REPORT 4

DOCKET NO.

050-0298 UNIT CNS DATE February 10. 1995 OPERATING STATUS TELEPHONE (402) 825-5829 1.

Unit Name:

Coooer Nuclear Station Notes 2.

Reporting Period:

Januarv 1995 3.

Licensed Thermal Power (MWt):

2381 4.

Nameplate Rating (Gross MWe):

836 5.

Design Electrical Rating (Net MWe):

778 6.

Maximum Dependable Capacity (Gross MWe):

787 7.

Maximum Dependable Capacity (Net MWe):

764 8.

If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

f 9.

Power Level To Which Restricted, if Any (Net MWe):

10.

Reasons For Restriction, if Any:

This Month Yr.-to Date Cumulatrve 11.

Hours in Reporting Period 744.0 744.0 180.481.0 12.

Number of Hours Reactor Was Critical O.0 0.0 133.190.2 13.

Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.

Hours Generator On-Line 0.0 0.0 131.279.3 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 0.0 0.0 271.311.244.0 17.

Gross Electric Energy Generated (MWH) 0.0 0.0 88.118.345.0 l

18.

Net Electric Energy Generated (MWH) 0.Q.

0.0 85.098.438.0 19.

Unit Service Factor O.0 0.0 72.7 20.

Unit Availability Factor 0.0 0.0 72.7 21.

Unit Capacity Factor (Using MDC Net) 0.0 0.0 61.7 22.

Unit Capacity Factor (Using DER Net) 0.0 0.0 60.6 23.

Unit Forced Outage Rate 100.0 100.0 8.5 24.

Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None.

25.

If Shut Down At End of Report Period. Estimated Date of Startup: Februarv 8.1995 26.

Units in lest Status (Prior to Commercial Operation):

Forecast Achieved l

lNITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l