Responds to 830615 Request for Addl Info Re Status of Vendor Repair or Redesign or Provisions for Obtaining Other Qualified Resistance Temp Detectors & Proposed Schedule for Installation.Installation Scheduled for Oct 1984
ML20078M202
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/19/1983
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
References
597, NUDOCS 8310250066
Download: ML20078M202 (2)


Text

s p

VIRGINIA ELucTHIC AND Powna COMPANY RIcnwoxn, VIRGINIA 20261

w. L. stasaur -

Vics Pmmenomwr -

Neca. man opumarrown October 19, 1983 Mr. Harold R. Denton, Director Serial No. 597 Office of Nuclear Reactor Regulation N0/LAJ/JHL:acm Attn:

Mr. James R. Miller, Chief Docket No. 50-339 Operating Reactors Branch No. 3 License No. NPF-7 Division of Licensing U. S. Nuclear Regulatory Cormission Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO. 2 STATUS OF LICENSE CONDITION 2.C(4)(c)

In your letcer dated June 15, 1983, you requested additional information related to the status of vendor repair or redesign or provisions for obtaining other qualified Resistance Temperature Detectors (RTD's) and a proposed schedule for installing qualified RTD's in the North Anna Unit 2 Reactor Coolant System (RCS).

As a result of the further investigations conducted, the previous problems identified with the Weed Instrument Company RTD's during the replacement work conducted at the refueling outage appear to be best identified as anomalies in the results of pre-installation field testing of the devices. These ancmalies have since been resolved betvgen Vepco and the manufacturer. New unit sets of RTD's are being manufactured by Weed Instrument Company with improvements that minimize the potential for recurrence of the anomalous responses previously noted.

In addition, Vepco Station Maintenance personnel will observe testing and receive field installation training at the manufacturer's facility.

Specific devices have been modified in design to accomodate unique physical interference problems identified during the refueling outage.

It ~ is Vepco's current intention to install the Weed Instrument Company RTD's during the forthcoming refueling outages tentatively scheduled for June, 1984 (Unit 1) and for October, 1984 (Unit 2).

Vepco has completed an examination of prototypes of the new RTD's and find them to be satisfactory for their intended use.

0gk 8310250066 831019 PDR ADOCK 05000339 S

PDR

\\9

de> _

Vanonu A ELacresc Ann Powsm COMPMur TO Harold R. Denton Vepco will_ continue to conduct the interim tests required by the stipulations of License Condition 2.C(4)(c).

The information contained herein amends our previous submittal of_May 27, 1983 and the 10 CFR Part 21 report submitted on the same date.

Very uruly yours, i

JA s

W. L. Stewart cc: