Monthly Operating Rept for Aug 1983
ML20078K255
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/08/1983
From: Ballinger P, Thomason P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC
References
CNSS830564, NUDOCS 8310190024
Download: ML20078K255 (5)


Text

.

t OPERATING DATA REPORT DOCKET NO.

050-298 DATE 9-3-83 COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS

1. Unit Name:

Cooper Nuclear Station Notes

2. Reporting Period: August 1983 2381
3. Licensed Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):

778

5. Design Electrical Rating (Net MWe): -
6. Maximum Dependable Capacity (Gross MWe): 787 764
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr..to.Date Cumulative 744.0 5,831.0 80,376.0 I1. Hours In Reporting Period 0.0 2,850.1 64,221.0

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On.Line 0.0 2,840.4 63,212.4
15. Unit Reserve Shutdown Hours 0.0 0. 0_

0.0 l

16. Gross Thermal Energy Generated (MWH) 0.0 6,227,904.0 126,289,206.0 0.0 2,083,668.0 40,015,896.0 l
17. Gross Electrical Energy Generated (MWH) 0.0 2,011,673.0 38,585,133.0
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 0.0 48.7 78.6 0.0 48.7 78.6
20. Unit Availability Factor 0.0 45.2 62.8
21. Unit Capacity Factor (Using MDC Net) 0.0 44.3 61.7
22. Unit Capacity Factor (Using DER Net) 0.0 0.7 3.7

.23. Unit Forced Outage Rate

\\ 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:._

l

'5. If Shut Down At End Of Report Period. Estimated Date of Startup:

September 1, 1983

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION

[F ['

(*D 2

8310190024 830908 PDR ADOCK 05000298 R

PDR y

AVERAGE DAILY UNIT POWER LEVEL 050-298 DOCKET NO.

UNIT Cooper Nuclear Station 9-8-83 DATE

?

COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811

' MONT11 August 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 0

1

,7 0

2 jg o

0 3

39 0

4 0

23 0

0 0

5 21 0

6 22 0

0

. 7 23 0

0 8

24 0

0 9

25 0

0 10 26 O

0 1I 27 0

o 12 73 0

13 29 0

14

' O 0

30 0

0 15 31 16 0

INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) w.

1 050-298 DOCKET NO.

UNIT SilU1 DOWNS AND POWER REDUCTIONS C Per Nuclear Station UNIT N AME DATE 9-8-83 COMPLETED BY P. L.

Brillincer REPORT MONTig August TELEPHONE 402-825-3811 "t.

.$ g 3

Y Licensee

,Eg fe.

Cause & Corrective No.

Date g

3g s-jy5 Event p

g'8 Action to F

y:

5 35c Report #

mV o

Prevent Recurrence o

u 6

83-3 830430 S

744 C

7.

N/A N/A N/A 1983 Refueling and Maintenance I

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for, Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NtlRLG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F Administrative 5

Goperational Error (Explain)

Exhibit I - Same Source (9/77)

Il Other (Explain)

OPERATIONS NARRATIVE Cooper Nuclear Station August 1983 The 1983 Refueling Outage continued through the month of August but is nearing completion. Weld overlay repair of Recire. piping, Core Spray piping, and Reactor Water Cleanup piping is complete. A startup is scheduled for September 1, 1983. An operating cycle through Octcher, 1984 is planned.

4 I

J i

'l

{

i I

b

.,9

~

COOPER NUCLEAR STATION Nebraska Public Power District

" ' " * "A"E, "D'@ "!,""M*^ " '

CNSS830564 September 8, 1983 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operation Status Report for August 1983 Docket No. 50-298 Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for August 1983. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown data, and a Narrative Summary of Operating Experience.

Should you have any comments or require additional information regarding this report, please contact me.

Sincerely, P. V. Thomason Division Manager of Nuclear Operations PVT:lb Enclosure cc:

G. D. Watson w/ enc.

A. C. Gehr w/ene.

J. T. Collins w/ enc.

I I

!