Forwards long-range Planning Program semi-annual Update of Integrated Schedule ABC Project Listing
ML20078G993
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/07/1994
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C-94-2567, C000-94-2567, NUDOCS 9411160294
Download: ML20078G993 (22)


Text

. .. l GPU Nuclear Corporation bp . U ear ne Upper Pond Road Parsippany, New Jersey 07054 201-316-7000 1

l TELEX 136-482 l

Writers Direct Dial Nurnber l

Noveniber 7,1994 C000-94-2567 1

C311-94-2141 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 1

Gentlemen:

Subject:

Three Mile Island Nuclear Station, Unit No. 1 (THI-1)

Docket No. 50-289 Operating License No. DPR-50 Long Range Planning Program (LRPP)

Semi-Annual Update of Integrated Schedule "ABC" Project Listing Pursuant to License DPR-50 Condition No. 2.c.9, GPU Nuclear (GPUN)

Corporation hereby submits the required semi-annual update of projects listed in each category (A, B, and C) as defined by the LRPP integrated schedule.

The attachments to this letter include: 1) the ABC project listing; and, 2) a summary of changes since the last submittal forwarded by GPUN Letter No.

C311-94-2051, dated May 6, 1994. An abstract of the attachments follows:

1. Attachment A - A new project listing of Category A, B, and C projects annotated by an asterisk (*) to identify new projects and by a double asterisk (**) to identify changes in Budget Authorization (B/A) number assignments. Completed projects have been removed from the schedule listing. Remaining projects are ongoing or are scheduled consistent with cycle / year commitments. Any changes in schedule are reflected on Attachments A and B.

150C3:

t 9411160294 941107 PDR ADOCK 03000289 R PDR ,

GPU Nuclear Corporation is a subsdary of General Pubhc UtAties Corporation i i k

1 I

C000-94-2567 C311-94-2141 Page 2 l I

2. Attachment B - A summary listing of Category A and B projects which have been completed, deferred, changed in scope, or otherwise changed with explanations, as appropriate. The listing also' contains Category C project completions. Changes to the Category C scope or schedule do not impact the Category A and B schedules.

Pursuant to the LRPP 'for THI-1, GPU Nuclear will assume that the NRC is in agreement with the above Category A and B changes, unless we are notified otherwise within 15 days of receipt.

Sinc ly, o l' R. L. Long

(?

Vice President an rector Services Division l

GMG/ pip l

l 8

cc: Administrator, Region 1 THI-1 Senior Project Manager TMI Senior Resident Inspector

e e 1

i l ATTACHMENT A THI-1 PROJECT LISTING l INTEGRATED SCHEDULE l SEMI-ANNUAL UPDATE i 1

(NOVEMBER,1994) l l

l 1

l 1

. . s _ - .

1 TM i - 1 PROJECT L i ST I PI G LEGEND .


NRC I NTEGRATED SCHEDULE

  • NEW PROJECTS -------------------------------------------- ,
    • BA NUMBER CHANGE CATECORY 'A' PROJECTS t SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCR1PTlON CYCLE / CLASSIFlCATION NUMBER YEARS 1 412662
  • TMI SECURITY (LVl/DBX) ENHANCEMENTS 10 NRR UPCRADE VEHICLE BARRIER SYSTEM (VBS)

AT TMl TO MEET NRC REGULATIONS 10 CFR 73 t

i I

TM i - 1 PROJECT L iST I NG LEGEND .


NRC 1 NTEGRATED SCHEDULE

  • NEW PROJECTS -------------------------------------------- ,
    • BA NUMBER CHANGE CATEGORY 'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCR I PT ION CYCLE / CLASSIFICATION NUMBER YEARS 2 123321 REACTOR BLDG TENDON SURVElLLANCE PROG 10 NRR
1. UPG'D PROC TO RG 1.35R3. 2. PROVIDE CNTRACTOR AND PLT SPRT FOR SURV PROGRAM.

REF. NUREG 135.1;TS 4.4.2.1 3 123328 OTSG TUBE PLUGGING 11R NRR RB BASE:REPL.20 1-600 FRM ECT,15 l-600 FRM PSLR;RMVE 10 TUBES FRM SRVC (20 PLGS);

BACKPLG DEFECTIVE M-3's (REF.TS 4.19) 4 126254 OTSG EDDY CURRENT TESTING 10/11R 11R NRR RB PREP.& PERFORM ECT OF OTSG. APPROX 10%

OF TUBES /OTSG+6% EXPANDED SAMPLE AND 750 PLUCS+500 SLEEVES. (REF TS 4.19) 5 126255 THI INSERVICE INSPECTION - 11R 11R NRR ALL ASME SECTION XI INSPECTIONS; AUGMENTED ISI TO COMPLY WITH 10CFR50.55A 6 128176 ISI CHECK VALVE NON-INTRUSIVE TESTING 11R NRR EVAL OPTIONS FOR NON-INTRUSIVE TEST OF CHECK VALVES TO MEET ASME SEC XI &

GL 89-04 7 128186 PIPE WALL THINNING MONITORING 11R NRR ALL AUGMENTED INSPECTIONS TO DETECT DEGRADA-TION DUE TO FLOW ASSISTED CORR (FAC) PER NRC GL 89-08(90 POINTS) & 10 NON FAC PTS 8 123321 REACTOR BLDG TENDON SURVEILLANCE PROG 12 NRR PROVIDE CONTRACTOR AND PLANT SUPPORT FOR SURVEILLANCE PROGRAM.

REF. NUREG 135.1;TS 4.4.2.1

TM i -1 PROJECT L i ST I NG LEGEND .


NRC I NTEGRATED SCHEDULE

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 9 123ABC OTSG TUBE PLUGGING 12R NRR PLUG :SG TUBES AS NECESSARY. PLAN IN-CLUDES NEW PLUGS AND REPLACEMENT OF EX.

ISTING PLUGS. REF. TS 4.19 10 123334 ILRT 12R NRR INTEGRATED REACTOR BUILDING LEAK RATE TEST PER TS 4.4.1.1 11 126968 ISI INSPECTIONS (12R) 12R NRR ASME SECT XI INSPECTIONS; AUGMENTED iSi TO COMPLY WITH 10CFR50.55A 12 12696C OTSG EDDY CURRENT TESTING 12R NRR ECT OF SAMPLE INSPECTION GROUP. 3%

PER OTSG PER T.S. 4.19 13 128AEK PIPE WALL THINNING MONITORING 12R NRR AUGMENTED INSPECTIONS TO DETECT EROSION /

CORROSION DEGRADATION OF SINGLE AND TWO PHASE SYSTEMS. REF. GL 89-08 14 123ABC OTSG TUBE PL UGGING 13R NRR PLUG OTSG TUBES AS NECESSARY. PLAN IN-CLUDES NEW PLUGS AND REPLACEMENT OF EX-ISTING PLUGS. REF. TS 4.19 15 126LL3 OTSG EDDY CURRENT TESTING - 13R 13R NRR ECT OF SAMPLE INSPECTION GROUP. 3% PER OTSG (REF. TS 4.19)

TM i -1 PROJECT L i ST I NG LEGEND


NRC i NTEGRATED SCHEDULE

  • NEW PROJECTS -------------------------------------------- ,
    • BA NUMBER CHANGE CATEGOPY 'B' DROJECTS SORT BY CATEGORY / CYCLE /DA STATUS AS OF 01Nov94 OBS BA DESCRIPTION CYCLE / CLASSlFICATION NUMBER YEARS 16 126LL6 ISI INSPECTIONS - 13R 13R NRR ASME SECT Xl INSPECTIONS; AUGMENTED ISI TO COMPLY WITH 10CFR50.55A 17 128AEL PIPE WALL THINNING MONITORING 13R NRR AUGMENTED INSPECTIONS TO DETECT EROSION /

CORROS ION DEGRADATION OF S INGLE AND TWO PHASE SYSTEMS, REF GL 89-08 18 128152 MOV PROGRAM 90-95 NRR DEVELOP & IMPLEMENT MOV PROGRAM TO MEET GL 89-10.

REF. MEMO C311-90-3132,C311-89-2117 19 412617 TMI IPE EXTERNAL EVENTS 92-94 NRR PERFORM THE IPE ANALYSIS FOR EXTERNAL EVENTS - REF: LETTER NO. C311-91-2150, LAl 91-9238, 9239 & GL 88-20 SUPPL #4.

20 419266 SIMULATOR MODIFICATIONS - TMI (1994) 94 NRR UPGRADE SIMULATOR CONSISTENT WITH CONTROL ROOM MODIFICATIONS.

REF. 10 CFR 55.45 21 41995G SIMULATOR MODIFICATIONS - OUTYEARS 95-99 NRR UPGRADE SIMULATOR CONSISTENT WITH CNTRL ROOM MODS REF. 10 CFR 55.45

. _ _ _ _._m TM i - 1 PROJECT L 1 STI NG q LEGEND .


NRC I NTEGRATED SCHEDULE

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 22 122031 DEMOBILIZATION SOUTH OF THE DIKE 10 GWC DEMOLITION, DISCONNECT ELECTRICAL, DISPOS OF MATERIALS FOR FACILITIES SOUTH OF THE DIKE (SEE BA FOR DETAILS OF FACILITIES) 23 128175 ASSMNT & UPGRD OF UNDRGRND TANKS / PIPING 10 ERR 4

1-ASSESS APPLIC TANK / PIPE SYS. Il-INIT TEST & MONITORING. Ill-UPGRADE AS REQD.

(REF 40 CFR 112) 24 412612 PERM DEMIN SYST/ MISC WASTE EVAP 10 IOE DECON & PREPARE CHEM CLG BLDG FOR PROBABLE INSTALL OF DEMINERAllZER TO BE USED WITH RADWASTE MISC WASTE EVAPORATOR 25 412615 ADDITIONAL PERMANENT MAINT. PLATFORMS 10 FAC INSTALL PLATFORM-DIVER'S PLATFORM 26 412660

  • TP' ROOF REPLACEMENTS - 1994 10 FAC INSTALL NEW ROOFS ON: RIVER WATER PH,1WT BLDG, SEWAGE TREATEMENT BLDG & OTHERS(IF FUNDS REMAIN). FUNDS FROM 418798 & 419738 27 418821 PLANT PRESERVATION BOP - 1994/1995 10 MRC SCAFFOLDING, SURFACE PREPS, PAINT / COAT OF APPROX 30,000 SQ FT IN TB PREVIOUSLY NOT PAINTED / COATED 28 418822 CONTROL TOWER RENOVATIONS - 4TH FLOOR 10 GWC UPGRADE FACIL FOR IkC MAINT & OPS INSIDE UNIT 1 CONTROL TOWER.EL 355' TO BE RENO-VATED & CONSTRUCT INTERMED FLR (365')

TH I - 1 PROJECT L I ST I NG LEGEND


NRC 1 NTEGRATED SCHEDULE .

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 29 419259 EOF /JIC CONSOLIDATION 10 FAC RELOCATE TMI JOINT INFO CENTER TO TMI EOF. MAKE REQUIRED MODS TO EOF TO PERMIT SIMULTANEOUS OPERATION OF JIC AND EOF 30 419742 TMI PAVING 10 FAC TRLR 350 PARKING AREA; NORTH LIBERTY RD, THE MAIN ROAD ONTO TMl; HEllPORT

& MOTORCYCLE AREA 31 995100 MOBILE XFMR ON SITE STORAGE 10 GWC GPU SYSTEM MOBILE GENERATOR STEP UP(GSU)

TO BE STORED AT TMI SITE. OIL SPILL CON-TAINMENT AND ELEC WORK REQUIRED.

32 412AHW ROOF REPLACEMENTS 11 MRC VARIOUS ROOF REPLACEMENTS 33 412648 RADWASTE STORAGE CAPABIL PHASE 2 11 NRR PROCURE EQUIP & CONSTRUCT STORAGE FACILITY FOR LLRW STORAGE lEN 90-09 GL 81-38 34 418750 SERVICE BLDG ADDITION 11 FAC SCOPE NOT DEFINED, $ ALLOCATED FOR 1996.

35 418822 CONTROL TOWER RENOVATIONS - 4TH FLOOR 11 GWC UPGRADE FACIL FOR I&C MAINT & OPS INSIDE UNIT 1 CONTROL TOWER.EL 355' TO BE RENO-VATED & CONSTRUCT INTERMED FLR (365')

TM ! - 1 PROJECT L i ST I NG LEGEND NRC 1 NTEGRATED SCHEDULE

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 36 419707 SAND BLASTING & PAINTING FACILITY 11 GWC DESIGN AND CONSTRUCT FACILITY TO SUPPORT FAB ACTIVITIES FOR PLANT MODS AND MAINT.

TO REPLACE EXIST DELAPIDATED SHOPS.

37 419727 PROVIDE STORAGE CAPABILITY 11 GWC PROVIDE FACILITIES FOR IS TELEPHONE PERSONNEL, WASTE MANAGEMENT & OTHER DIVISIONS 38 4197'42 TMI PAVING 11 FAC VARIOUS PAVING PROJECTS 39 41994C REPLACE BUILDING 400 11 FAC DEMOLISH EXISTING CONNECTED TRAILERS AND COMMON ROOF . CONSTRUCT A NEW BLDG FOR SECURITY, GET, ARWT AND OUTAGE PROCESSNG 40 123GGG OTHER OUTAGE RELATED ACTIVITIES 11R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES, MINOR MODIFICATIONS, MOD SUPPORT, ETC.

41 123329 11R FUEL MOVEMENT FOR 11R CORE LOAD 11R NRC RB PLNG,ENGNG, PROCURE,& LABOR FOR RX HEAD &

. PLENUM REMVE/ INSTALL, FUEL OFFLOAD / RELOAD

( & INSTALL SEAL PLATE. 72 ASSMBL/650 EFPD 42 123331 CRDM FLANGE GASKET REPLACEMENT 11R MRC l

REPLACE 12 THERMAL BARRIERS INCL 3 WITH FLANGE GASKET IN 11R. IN 12R 11 AND 4.

IN 13R DO FINAL 8 WITH BOTH.

l 1

l__.____ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ ._______ __

TH I - 1 PROJECT LIST I NG LEGEND


NRC I NTEGRATED SCHEDULE .

  • NEW PROJECTS ---------------------------- ---------------
    • BA MUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 43 128187 RX BUILDING CRANE REFURBISHMENT 11R MRC REFURBlSH BRAKING SYSTEM ON THE RB CRANE MAIN AND AUXILLARY HOISTS 44 412552 MODIFICATIONS FOR SEISMIC QUALIFICATION 11R NRR ALL MODS TO COMPLY WITH SEISMIC QUAL TO INCL HVAC UNITS, HANDRAILS, CR CEILING, CABLE TRAY & CONDUIT 45 412609 DIGITAL TURBINE CONTROL SYSTEM (DTCS) 11R REL UPGRADE MAIN TURBINE EHC ELECTRONICS ,

WITH DIGITAL CONTRCL SYSTEM TO IMPROVE RELIABILITY OF TURBINE CONTROLS 46 412615 ADDITIONAL PERMANENT MAINT. PLATFORMS 11R FAC INSTALL REMAINING PLATFORMS-INTERMED BLG

, D-RINGS, AND FUEL TRANS CANAL STAIRWAY 47 412626 UPGRADE SOURCE RANGE NUCLEAR INSTR (NI) 11R MRC CB RB REMOVE BF-3 DETECTORS FROM NI-1,2; ADD ADDITIONAL FISSION CHAMBERS FOR N1-11A, 12A CHANNELS; ROUTE CABLE. (PHASE 2) 48 412629 AUX FUEL BRIDGE VARIABLE FREQ DRIVE SYS 11R REL l REPLACE EXISTING THYRISTER DRIVE I MOTOR CONTROL WITH VARIABLE FREQUENCY SPEED SYSTEM 49 412646 MOTOR OPERATED VALVE MODS GL 89-10 11R NRR REPLACE OR MODIFY ACTUATORS AS REQUIRED DUE TO GL 89-10 PROGRAM

TM I - 1 PROJECT LI ST I NG LEGEND


NRC 1 NTEGRATED SCHEDULE

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCRIPTION CYCLE / CLASSlFICATION NUMBER YEARS 50 412652 HEATER DRAIN PIPE REPLACE-EROS / CORR 11R MRC REPLACE REMAINDER OF HEATER DRAIN PUMP PIPING SYSTEM NOT COMPLETED DURING 10R.

AS IDENTIFIED BY THE EROS / CORR PROG.

51 412655 RX BLDG SUPPLEMENTAL HOIST 11R TOE RB SPECIFY, SELECT, PROCURE AND INSTALL 3 HOISTS (2 FOR RV ACCESS, 1 FOR RB EQUlr HATCH ACCESS) IN THE RB 52 418808 RC-P CARTRIDGE SEAL CONVERSION (2 PUMPS) 11R MRC INSTALL (2) NEW CARTRIDGE SEALS ON RC-P

  1. 1 B & C. IN ADDITION, CLEAN & INSPECT #1 SEALS ON BOTH PUMPS.

53 412AHW ROOF REPLACEMENTS 12 MRC VARIOUS ROOF REPLACEMENTS 54 419742 TML PAVING 12 FAC VARIOUS PAVING PROJECTS 55 123ABD REACTOR REFUELING 12R MRC LOAD FUEL ASSEMBLlES FOR 650 EFPD l

l 56 123LLL OTHER OUTAGE RELATED ACTIVITIES 12R ALL A'_L OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC.

i 2

m

TM i -1 PROJECT L i ST 1 NG LEGEND


NRC I NTEGRATED SCHEDULE

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 57 123330 RX BUILDING PRESERVATION 12R MRC RB AB PAINT / COAT AREAS IN RB INCLUDE:lC&NS PIPE; STEEL, WALLS, HANDRAILS; FLOORS;RB LINER. RU/RD=1200-1500FT IN AUXBLDG 58 123335 REPLACE MAIN STEAM LINE INSULATION 12R MRC REPLACE DECRADING INSULATION ON MAIN STEAM LINE 59 412552 MODIFICATIONS FOR SEISMIC QUALIFICATION 12R NRR MODS TO COMPLY WITH SEISMIC QUAL TO INCL HVAC UNITS, HANDRAILS, CR CEILING, CABLE TRAYS & CONDulT 60 418813 INCORE DETECTOR REPLACE (43) 12R MRC REPLACE 40 INCORE DETECTORS THAT ARE PROJECTED TO HAVE REACHED THE END OF LIFE 61 123ABD REACTOR REFUELING 13R MRC LOAD FUEL ASSEMBLIES FOR 650 EFPD 62 123MMM OTHER OUTAGE RELATED ACTIVITIES 13R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS, REPAIRS, SURVEILLANCES MINOR MODIFICATIONS, MOD SUPPORT, ETC.

63 418813 INCORE DETECTOR REPLACEMENT 13R MRC REPLACE 12 INCORE DETECTORS THAT ARE PROJECTED TO H/1" REACHED THE END OF USEFUL LIFE

TM i - 1 PROJECT LI ST I NG LEGEND


NRC 1 NTEGRATED SCHEDULE

  • NEW PROJECTS ---------------------------------- --------
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 64 128114 EPRI STEAM GENERATOR RELIABILITY PROGRAM 88-98 MRC CO-FUNDING FOR EPRI SGRP TASK 404.

65 123262 REllABILITY CENTERED MAINTENANCE PROG 89-94 MRC RCM EVALUATION OF PLANT SYSTEMS TO DEFINE MAINT. ACTIVITIES THAT IMPROVE RELIABILITY.

66 126223 TMl APPENDIX Vill QUALIFICATION 91-99 NRR SUBSCRIPTION FEE FOR PROGRAMS DEVEL BY EPRI & OTHERS FOR CONTRACTOR QUAL &

CERT OF UT NDE INSPECTORS PER APP Vill 67 128166 COMPONENT DATA BASE EXPANSION 92-94 IOE ENHANCE THE EXISTING ENG DATA BASE WITH SUBCOMPONENTS TO MEET THE NEEDS OF PLANT MAINT & OPERATIONS ORGANIZATIONS.

68 412643 FLOOD PANELS 92-94 ISM DEVELOP PLAN TO RESOLVE THE OUTSTANDING PRA ISSUE REGARDING FLOODING. PANELS WERE CONSIDERED, NOW PUMP PROCUREMENT.

69 128163 DRAWING ENHANCEMENTS 92-95 MRC REPLACE CABLE MANAGEMNT PROCESS FOR ELEC DRAWINGS, REDRAW FLOW DIAG. IN CAD FORMAT

& REDRAW GEN ARRANG IN CAD FORMAT 70 412592 1992 CONFIGURATION MANAGEMENT - DBR 92-98 IOE DESIGN BASIS RECONSTITUTION 1992

. ~

TH i - 1 PROJECT L I STI NG 9

LEGEND


NRC l NTEGRATED SCMEDULE

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS 71 128174 REPLACEMENT OF OZONE DEPLETING CHEMICALS 93-95 MRC DEVELOP PLAN TO RECHARGE EQUIPMENT WITH COMPATIBLE CHEMICALS DUE TO PHASE OUT OF OZONE DEPLETING CHEMICALS 72 128177 THERMO-LAG FIRE BARRIER EVALUATIONS 93-95 NRR SUPPORT EVALUATIONS OF THERMO-LAG 330-1 FIRE BARRIER SYSTEMS TO ACHIEVE COMPLI-ANCE W/ 10CFR50 APP R AT THI-1 73 412618 ACCIDENT MANAGEMENT GUIDELINES (AMG) 93-95 NRR USING IPE OUTPUT, DEVEL AMG FOR USE BY EMERG RESPONSE PERSONNEL TO COPE WITH CORE DAMAGE EVENTS 74 126109 BWOG GLRA PROGRAM 93-97 MRC PARTICIPATE IN AND PROVIDE SUPPORT FOR THE BWOG GENERIC LICENSE RENEWAL APPLICATION (GLRA) PROGRAM 75 412631 PRESSURIZER HEATER BUNDLE REPLACEMENT 93-97 MRC DEVELOP A PROCUREMENT SPEC TO DESCRIBE THE ELEC AND MECH REQUIREMENTS FOR A NEW BUNDLE. PURCHASE IN '97.

76 412634 TMl-1 RCP MOTOR STANDBY STATOR AND ROTOR 93-97 MRC SPECIFY AND PROCURE A SPARE STATOR AND ROTOR SUITABLE FOR ANY RCP MOTOR. NO PROCUREMENT FUNDING-ENGINEERING ONLY.

77 419260 SIMULATOR COMPUTER UPGRADE 93 97 MRC UPGRADE THE TML SIMULATOR COMPLEX TO EN-ABLE INTEGRATION OF FUTURE PLANT MODS TO COMPLY WITH SIMULATOR CERT REQUIREMENTS.

TM l - 1 PROJECT L iSTI NG LEGEND


NRC 1 NTEGRATED SCHEDULE

  • NEW PROJECTS --------------------------------------------
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01NOV94 03S BA DESCRIPTION CYCLE / CLASSlFICATION NUMBER YEARS 78 128170 GUIDELINES FOR ABNORMAL TRANSIENT PROC 93/94 IOE DEVELOP PLANT SPEC CUIDE (PSG) FOR TMI-1 ATP PROVIDING TECH BASES FOR ATP'S TO BE USED IN TRAINING, EVAL PROC CHANGES,ETC.

79 128173 CAVITY DOSIMETRY ANALYSIS 93/94 NRR REPLACE A & B CAPSULE HOLDERS WITH NEW DOS IMETRY DUR ING 10R, TRANSPORT, ANALYSIS AND REPORT OF RESULTS OF TESTING 80 128181 SIMULATOR ENHANCEMENTS 94 REL ADD NEW MODELS OR REPLACE EXISTING MODEL PER RPA, INCLUDES RCDT, CONTAINMENT, REACT UPGRADE, FW FLOW, CURIE TRANS.,ETC.

81 126101 PLANT LIFE ASSURANCE / EXTENSION 94-99 REL SUPPORT OF STUDIES BY GPUN & BWOG FOR FEASIBILITY OF EXTENDING OPERATING LIFE.

82 128183 B&W OWNER'S CROUP 1994/1997 94-99 NRR PARTICIPATION IN B&W OWNERS GROUP PROGRAM P

83 412619 CPU /IPO UPGRADE FOR PLANT PROCESS COMPUT 94/95 IOE UPGRADE PLANT PROCESS COMPUTERS CPU AND IPU BOARDS (18) WITH A SINGLE BOARD.

84 412624 CORE MONITORING SYSTEM UPGRADE 95 ISM INSTALL NEW FIXED MARGIN TS SFTWARE THAT WHEN USED WITH EXISTING NAS WILL PROVIDE ADDED OPERATING SAFETY MARGIN

k TM i -1 PROJECT- L I ST I NG LEGEND


NRC i NTEGRATED SCHEDULE

  • NEW PROJECTS ------- ------------------------------------

l '

    • BA NUMBER CHANGE l

l CATEGORY 'C' PROJECTS l SORT BY CATECORY/ CYCLE /BA STATUS AS OF 01NOV94 l _______._________________.....__________...__________..._______....______________.._______..________________.______ _____ ..____..._

l OBS BA DESCRIPTION CYCLE / CLASSIFICATION NUMBER YEARS l ______________________________________________________________ ______________ ________________...______.._____....__________________

l i

85 419750 CURITY EQUIPMENT - TMl 95-99 MRC REPLACEMENT OF TURNSTILES, VITAL AREA DOOR, CCTV CAMERAS, PRTABLE RADIOS, HAND GUNS, LEATHER GEAR & SLIDE GATE OPERATOR 86 128AEC DRAWING ENHANCEMENTS TMI 96-99 MRC 1 ENHANCE THE LEGlBILITY OF APPR 500 DWCS. 2. REDRAW FLOW DIAG. IN CAD FORMAT

3. REDRAW GEN ARRANG IN CAD FORMAT 87 128ADV 1996 CONFIG MGMT SSFI 96/98 ISM PERFORM ONE SAFETY SYSTEM FUNCTIONAL INSPECTION. PREPARE DRAFT DESIGN BASIS DOCUMENT IF REQUIRED.

88 128AEl REACTOR CAVITY DOSIMRTRY - 12R 97-99 NRR SHIP IRRADI ATED CAVITY DOSIMETRY REMOVED IN 12R AND ANALYZE 89 126L13

  • MAINTENANCE TRAINING ANALYSIS 98 NRR DEVELOP ANALYSIS FOR INPO ACCREDITED PROGRAMS.

ABC Classifications a) tLeet NRC Reauirements (NRR) - Activities that a) must be carried out to fulfill specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.

b) Meet Environmental Reauirements (ERR) -

Activities that a) are specifically required by environmental regulatory agencies (State and Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency. I 1

c) Meet Other Reauirements (0RR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would-result in a violation of that ordinance, code or guidance, court order, etc.

d) Increase Safety Marains (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required for

regulatory compliance nor required by safety regulations, codes or guidance.

e) Recrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance.

f) Lmorove Radioloaical Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance.

g) Maintain Reliability / Capability (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment. Includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability equipment data without which the plant could not operate prudently.

h) Improve Reliability / Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.  !

l i

1

l l

ABC Classifications (continued) i) Imorove Operational Effectiveness (IDE) -

Activities that, if implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating / maintenance costs.

j) Jgprove Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel

. facilities.

k) Provide Continaency/ Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.

1) Lmoroves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency.

4 ATTACHMENT B CHANGES TO TMI-1 NUCLEAR GENERATING STATION INTEGRATED SCHEDULE SEMIANNUALUPDATE(NOVEMBER 7,1994)

CATEGORY A PROJECTS Additions: As denoted by

  • next to the project title in Attachment A.

i Completions: None Deletions: None Schedule Changes: None l

l i

l l

l l 1

l ATTACHMENT B (continued)

CATEGORY B PROJECTS Additions: None i- Completions: 123298 Forced Outage / Emergency Maintenance Deletions: None Schedule Changes: 128152 The MOV Program verification of valve design basis capability will be completed as of r January 1, 1995. However, the remaining activities associated with implementation of Generic Letter 89-10 (including: as-found testing, periodic reverification program, trending programs, and any resultant modifications required) are not scheduled to be completed until the 11R refueling outage in 1995. Therefore, the Budget Activity account has been extended through 1995.

BA Number Changes: None a

1 i

1 N

4 m- - ,

I ATTACHMENT B (continued)

CATEGORY C PROJECTS ,

l l

Additions: As denoted by

  • next to the project title.

Completions: None Deletions: 126238 Evaluation of TMI Alert and Notification System - Cancelled 126252 Maintenance Training Analysis - Cancelled 412645 CFC Elimination - Deleted until 0&M Study (128174) identified candidates 418798 Roofing Replacement 1994 -

Superseded by 412660 419738 Roof Replacements - Superseded by 412660 BA Number Changes: None 1

l

_ __ ________i