Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-OSC-7 Re Personnel Rescue & EPIP-EOF-3 Re Emergency Instruments & Equipment.Receipt Form Encl
ML20078G853
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/29/1983
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20078G850 List:
References
LIC-83-256, NUDOCS 8310130308
Download: ML20078G853 (3)


Text

- ,

e u a m_ Q%'kWWGSp.MGC6Qfy1@QGj:f!OC. WMp.y52_~ gl$RQil[f2=w - -

g _ _ ,_.

Omaha Public Power District 1623 Harnetj Omaha. Nebraska 68102 402/536-4000 September 29, 1983 LIC-83-256 Mr. J. T. Collins, Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Reference:

Docket No. 50-285  ;

i

Dear Mr. Collins:

Pursuant to 10 CFR 50, Appendix E, Section V, five (5) copies of changes to the Fort Calhoun Station Emergency Plan Implementing Procedures are being provided to the Com-mission. Three (3) copies (for control copy numbers 154, 155, and 156) are provided for your office. Two (2) copies (for control copy numbers 165 and 166) have been provided to the Document Control Desk in Washington, D.C. A transmittal sheet is provided for each copy to confirm receipt of the j serialized document. It is requested that these sheets be i completed and returned within "ive (5) days of receipt. '

Sincerely,

,,i 4 i

.f, l! Ui 'T / - ,

'i. . C . Jo n e.3 Division Manager Production Operationa WCJ:jmm l

Enclosures cc: Document Control Desk l U. S. Nuclear Regulatory Commission Washington, D.C. 20555 i

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C. 20036 e/

I Mr. L. A. Yandell, Senior Resident \

}b

(

Inspector ~

8310130308 831006 DR ADOCK 05000285 PDR 455:24 Employment with Ecual Opportunity Ma> Female h

r e ,

OMAHA PUBLIC POWER DISTRICT CONFIRMATION OF TRANSMITTAL EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIP)

Name h wws%4 C_edro I Des (Datejectember 23, 1983 -

Holcs and maintains Copy No. /c5 The following procedures are provided for your use:

Remove Insert Procedure No. Page No.(s) Procedure ~No. Page No.(s)

Table of Contents 1 (8-2-83), ' Table of Contents 1 (8-30-83),

ii (5-13-83), ii (8-23-83),

v (4-28-83), v (8-30-83),

vi (5-11-83), .vi (8-30-83),

vii (4-28-83), vii (8-30-83),

viii (4-28-83), viii (8-30 83),

and ix (4-28-83) and ix (8-23-83)

OSC-7 7-1 thru 7-7 OSC-7 7-1 thru 7-5 (R1 8-24-82) (R2 8-30-83)

E0F-3 3-1 thru 3-6 EOF-3 3-1 thru 3-7 (R2 3-2-82) (R3 8-23-83)

RR-1 1-1 thru l-15 RR-1 1-1 thru l-16 (R3 1-31-83) (R4 8-25-83)

RR-12 12-1 thtu 12-3 ~ RR-12 12-1 thru 12-3 (R1 2-1-83) (R2 8-30-83)

(Continued on Page )

^hAn Manager - Radiological Health -

& Emergency Planning I hereby acknowledge receipt of the above copy or numbered pages. The additional or revised pages have been includec in my assigned copy of the EPIP and/or super-seded pages have been removed as ceauired.

Signed Date (Please sinn and return this fern within 5 davs te the Adninistrative Services D_epartraent, Attention: Jane Morfolo, 0::.aha Public Power Cistrict, 1623 Harney Street, Omaha, Nebraska 68102.)

Note: If EPIP copies have been transferred to another person or address, please fill out the spaces below.

Name of Holder Address

) Title / Department

-8 OMAHA PUBLIC POWER DISTRICT CONFIRMATION OF TRANSMITTAL EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIP)

Remove Insert -

Procedure No. Page tb.(s) Procedure No. Page tb.(s)

RR-15 15-1 thru 15-3 RR-15 15-1 thru 15-3 (R1 2-1-83) (R2 8-30-83)

RR-16 16-1 thru 16-3 RR-16 16-1 thru 16-3 (R1 2-1-83) (R28-30-83)

RR-19 19-1 thru 19-3 RR-19 19-1 thru 19-3 (R2 5-11-83) (R3 8-25-83)

RR-21 21-1 thru 21-3 RR-21 21-1 thru 21-3

( R1 2-1-83) (R2 8-23-83)

RR-22 22-1 thru 22-3 RR-22 22-1 thru 22-3 (R1 2-1-83) (R2 8-30-83)

RR-24 24-1 thru 24-3 RR-24 24-1 thru 24-4

. (R1 2-1-83) (R2 8-30-83)

RR-25 25-1 thru 25-3 RR-25 25-1 thru 25-3 (R1 2-1-83) (R2 8-30-83)

RR-28 28-1 thru 28-3 RR-28 28-1 thru 28-3 (R1 2-1-83) (R2 8-30-83)

RR-31 31-1 thru 31-3 RR-31 31-1 thru 31-3 g (R1 2-1-83) (R2 8-30-83)

RR-33 33-1 thru 33-3 RR-33 33-1 thru 33-3 (R1 2-1-83) (R2 8-30-83)

RR 36-1 thru 36-3 RR-36 36-1 thru 36-3 (R1 2-1-83) ' (R2 8-30-83)

RR-38 38-1 thru 38-3 RR-38 38-1 thru 38-3 (R1 2-1-83) (R2 8-30-83)

RR-39 39-1 thru 39-3 RR-39 39-1 thru 39-3 (R1 2-1-83) (R2 3-30-83)

RR-40 40-1 thru 40-3 RR-40 40-1 thru 40-3 (R1 2-1-83) (R2 8-30-83)

RR-44 44-1 thru 44-3 RR-44 44-1 thru d4-3

( R1 2-1-83 ) (R2 8-30-83)

RR-47 47-1 thru 47-3 RR-47 47-1 thru 47-3

( R1 2-1-83) (R2 8-30-83)

RR-48 48-1 thru 48-3 RR-48 48-1 thru 48-3 (R1 2-1-83) (R2 8-30-83)

RR-49 49-1 thru 49-3 RR-49 49-1 thru 49-3 I

(R1 2-1-83) (R2 8-30-83)

RR-50 50-1 thru 50-3 RR-50 50-1 thru 50-3 (R1 2-1-83) (R2 8-30-83)

RR-51 51-1 thru 51-3 RR-51 51-1 thru 51-3 (R1.2-1-83) (R2 8-30-83)

RR-52 52-1 thru 52-3

  • RR-52 52-1 thru 52-3 l (R1 2-1-83) (R2 3-30-83) l RR-53 53-1 thru 53-3 RR-53 53-1thru 53-3 i

(R1 2-1-83) (R2 8-30-d3)

RR-55 55-1 thru 55-3 RR-55 55-1 thru 55-3 l (R1 2-1-83) (R2 8-23-83) ,

61-1 and 61-2 l RR-61 61-1 and 61-2 RR-61 (R1 2-1-83) (R2 8-23-83) j : een=;o eric n;uu;:n ,