ML20078F786

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Change to Type a Tests
ML20078F786
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/08/1994
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20078F717 List:
References
NUDOCS 9411150383
Download: ML20078F786 (4)


Text

, . - . .- . . _

6 4

1 I

1 PROPOSED TECHNICAL SPECIFICATION CHANGES 9411150383 9411og DR ADOCK 05000313 PDR

7

. Where (La) Dasign Basis Accident Leakage Rate ,

at Pressure Pa l (Lt) Maximum Allowable Test Leakage Rate at Reduced Test Pressure Pt Under Test  !

Condition  !

(Leo) Maximum allowable operational leakage rate at pressure Pa (Lto) Maximum allowable leakage rate at pressure Pt (Lam) Initial Measured Leakage Rate at Pressure Pa (L tm) Initial Measured Leakage Rate at Pressure Pt (Pa) Peak Test Pressure of 59 psig (Pt) Reduced Test Pressure of 30 psig 4.4.1.1.3 Conduct of Tests

a. Leakage rate tests should not be started until essential temperature equilibrium has been attained. Containment test conditions should stabilize for a period of about four hours prior to the start of a leakage rate test,
b. The leakage rate test period shall extend to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of retained internal pressure. If it can be demonstrated to the satisfaction of those responsible for the acceptance of the containment structure that the leakage rate can be accurately determined during a shorter test period, the agreed upon shorter period may be used.
c. Test accuracy shall be verified by supplementary means, such as measuring the quantity of air required to return to the starting point or by imposing a known leak rate to demonstrate the validity of measurements.
d. Closure of reactor building isolation valves for the purpose of the test shall be accomplished by the means provided for normal operation of the valves without preliminary exercise or adjustment.

4.4.1.1.4 Frequency of Test Testing frequencies shall be in accordance with 10CFR50, Appendix J, except as modified by approved exemptions.

Amendment No. M4,4M 80

J k

e e

d l

MARKUP OF CURRENT ANO-1 TECHNICAL SPECIFICATIO.N_S (FOR INFORMATION ONLY)

r

, Where (La) Design Basis Accident Leakage Rate I 4

at Pressure Pa (Lt) Maximum Allowable Test Leakage Rate at

, Reduced Test Pressure P t Under Test Condition (Lao) Maximum allowable operational leakage rate at pressure Pa (Lto) Maximum allowable leakage rate at pressure Pt (Lam) Initial Measured Leakage Rate at Pressure Pa (L tm) Initial Measured Leakage Rate'at Pressure Pt 4

(Pa) Peak Test Pressure of 59 psig (Pt) Reduced Test Pressure of 30 psig 4.4.1.1.3 Conduct of Tests

a. Leakage rate tests.should not be started until essential temperature equilibrium has been attained. Containment test conditions should stabilice for a period of about four hours prior to the start of a leakage rate test.
b. The leakage rate test period shall extend to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of retained internal pressure. If it can be demonstrated to the satisfaction of those responsible for the acceptance of the containment structure that the leakage rate can be accurately determined during a shorter test period, the agreed upon shorter period may be used.
c. Test accuracy shall be verified by supplementary means, such as measuring the quantity of air required to return to the starting point or by imposing a known' leak rate to demonstrate the validity of measurements.

4

d. Closure of reactor building isolation valves for the purpose of the test shall be accomplished by the means provided for normal operation of the valves without preliminary exercise or adjustment.

4.4.1.1.4 Frequency of Test After the initici precperatiencl 1cakcg rate-teet, c cet cf threc integrated-4eak retc tectc chcl1 be performed-at appee+tietatel-y-equal-inteevele-dweing cach 10 ycc: cer+1ee peried7 -witMhe-thi+d-test cf ca h cct ccineiding-wi-t44 end-ef c:ch 10 yee-r-serviee p : icd. Thc tcct may ccineide with-the-pleat-inec: vi cc inepectien c haedown-per4ede,-Te s ting frequencies shall be in accordance with 10CFR50, Appendix J2 except as modflied by approved exemptions.

Amendment No. 444,444 80