Forwards 830909 News Article Re Oct Emergency Evacuation Drill Being Postponed Until Dec
ML20078B590
Person / Time
Site: Comanche Peak  
Issue date: 09/26/1983
From: Ellis J
Citizens Association for Sound Energy
To: Bloch P, Jordan W, Mccollom K
Atomic Safety and Licensing Board Panel
References
NUDOCS 8309270160
Download: ML20078B590 (2)


Text

<

. C A S E==.s i

nk/9h6-9hh6 N'

(CITIZENS ASSN. FOR SOUND ENERGY)

'83 SEP 26 P4:21 Administrative Judge Peter B. Bloch Dr. Kenneth A. MgEplic;q, Jepn.

U. S. fluclear Regulatory Connission Division of Engineerink $rf%tecture 4350 East / West liighway. 4th Floor and Technology BRANCH Bethesda, Maryland 20014 Oklahoma State University Stillwater, Oklahuna 74074 Dr. Walter !!. Jordan UR? W. Outer Drive Oak Ridge, Tennessee 37830 Gentlemen:

SUBJECT:

In the Matter of Application of Texas Utilities Generating Company, e t al. for An Operating License for Comanche Peak Steam Electric Station Units #1 and #2 (CPSES)

Docket Nos. 50-445 and 50-446 Change in Date for Emergency Evacuation Drill in CASE's 9/8/83 Answer to Applicants' Objections to Proposed initial Decision (page 4, bottom of page), we informed the Board of a telephone call we received from a reporter which indicated that the Applicants had released a press release thaf day that the emergency evacuation drill which had been scheduled for October has been postponed until December.

For the Board's infonnation, we are attaching a copy of the 9/9/83 DALLAS MORtilt4G f4EWS article regarding this, which is the only information we have in written fonn regarding this matter.

Respectfully submitted.

CASE (Citizens Association for Sound Energy) n%E~ $NEu

(-(Mrs.) Juani ta Ellis President cc:

Service List h,

8309270160 830926

.(

PDR ADOCK 05000445 s Q' )

C PDR

O e

k

~

Comanche Peak evacuation ciri:L L reset.

DALLAS !!0Rfill!G flBIS 9/9/83 An evacuallon drill'for the Co.

unli! Sept. 24 In June. Texas li lities whl the tory alrtil has been condnetcal, ti rnanche Peak nuclear power plant Clyste Wisner, spokesman for drill winstil be ennittee, scal ilurttip Wonct sdd.

has been retcheduled for Dec.14 -

the NRC rer.lonal ni'ite in Arling-Ihe llrst we i k of A inher. It will IE Texas thilities the plant's pri-the same month the plant's first re.

Inn, sold the appratsal originally innnlinred by the N!!C and l'esteral mary owner. ss planning in nperate actnr is to be ineled. Texas litilities wns planneil for July, but Texas g.mergency klanagement Agency.

the first rextar commercially in Co annntincedThursday.

Illilities was ~nni prepared ni that

,,,,,.g.hi si ennd reactor is xbrel-llillity spokesman Jim la w.

point. in nur view "

Wisner said inel cannot be ule.t for completion by liec.11 rence sold the federally required lawrence iliugreed.

Ina. led into Comanche Peak's first I.in frill ortgtnally was schciluted for The settlity's plans were "In scuctor until atier concrgency Ostober. It is being postponed be.

place in July."I.nwrence satil. Ilut.

plans have receiveel a sainfxinry Comanche Peak is under con-conse the U S. Nuclear Regulatory he said. "we wetenme the extra rating frnm the N!!C appr.enal strnct nn An milessanthwest of Dal-Commisslan will not begin a two-time to do nur nwn pohshing int tram The reactor cannns tic oper.

las. near Cten Rose. Somervelt week oppraisal of evacuation plans emergency pland" 4,tc,I c,,mmercially tintil a sainfac. Cote nt y.

es -

es e

,.--se..+e e

'""D*'**

-m. m-

- A-

~. m

.