Responds to Generic Ltr 83-18,advising That Detailed Control Room Design Review Preliminary Program Plan Complies W/Generic Ltr & Goes Beyond Planning Requirements of NUREG-0737,Suppl 1
ML20077S325
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 09/16/1983
From: James Smith
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 GL-83-18, SNRC-966, NUDOCS 8309220021
Download: ML20077S325 (3)


Text

.

o psMP9w% _ . -u. ,- -; eerd

@IIEcoI l Mfamsw s

w LONG ISLAND LIGHTING COMPANY SHOREHAM NUCLEAR POWER STATION o**=-. w w m. P.O. DOX 618, NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 Direct Dial Number September 16, 1983 SNRC-966 Mr. Harold R. Denton, Director Office ot Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Response to NRC Generic Letter 83-18 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 ite ference : (1) LILCO Letter SNRC-938 (J. L. Smith) to the NRC (H. R. Denton), dated July 20, 1983

Dear Mr. Denton:

Although LILCO did not participate in the BWROG Control Room Survey Program, the Shoreham specific Detailed Control Room Design Review (DCRDR) Preliminary Program Plan contains many of the generic plan elements as both programs utilized NUREG-0700 as a basis.

This program plan (submitted to the NRC via reference 1) goes beyond the planning requirements of NUREG 0737, Supplement 1, paragraph 5.2.a, items b.i, ii and 11i to address:

The use of a control room survey The assessment and testing of Human Engineering Discrepancies (HEDs)

The testing and evaluation of design changes and the coordination of those changes with the Safety Parameter Display System (SPDS), the training program, Regulatory Guide 1.97, Revision 2, and the upgraded Shoreham-specific Emergency Operating Procedures (EOPs)

The Operating Experience Review 8309220021 830916 PDR ADOCK 05000322 F PDR h

FC-8935.1 I r

, b

September 16, 1983 SNRC-966 Page 2 LILCO is preparing the final' program plan which is currently scheduled for submittal in January of 1984. This submittal wili also address several issues that have not been addressed in either NUREG 0737, Supplement 1, or the Shoreham DCRDR Preliminary Program Plan submittal, but have been raised in Generic Letter 83-18. The information contained in this forthcoming submittal should enable the NRC to verify that the Shoreham DCRDR Program Plan is in compliance with the intent of Generic Letter 83-18.

Very truly yours,

'o J. L. Smith Manager, Special Projects KJT:jm cc: C. Petrone All Parties Listed in Attachment 1

ATTACHMENT 1 t

1 Lawrence Brenner, Esq. Herbert H. Brown, Esq.

Administrative Judge Lawrence Coe Lanpher, Esq.

Atomic Safety and Licensing Karla J. Letsche, Esq.

Board Panel Kirkpatrick, Lockhart, Hill U.S. Nuclear Regulatory ' Christopher & Phillips Commission 8th Floor Washington, D.C. 20555 1900 M. Street, N.W.

Washington, D.C. 20036 Dr. Peter A. Morris Administrative Judge Mr. Marc W. Goldsmith Atomic Safety and Licensing Energy Research Group Board Panel 4001 Totten Pond Road U.S. Nuclear Regulatory Waltham, Massachusetts 02154 Commission Washington, D.C. 20555 MHB Technical Associates 1723 Hamilton Avenue Dr. George A. Ferguson Suite K School of Engineering San Jose, California 95125 Howard University 2300 Fifth Street Washington, D.C. 20059 Stephen B. Latham, Esq.

Twomey, Latham & Shea 33 West Second Street

' Bernard M. Bordenick, Esq. P.O.~ Box 398 David A. Repka, Esq. Riverhead, New York 11901 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Ralph Shapiro, Esq.

Cammer and Shapiro, P.C.

9 East 40th Street Mr. James Dougherty New York, New York 10016 3045 Porter Street Washington, D.C. 20008 Matthew J. Kelly, Esq.

State of New York Department of Public Service Three Empire State Plaza Albany, New York 12223 i

i h' >