Monthly Operating Rept for Dec 1994 for CNS
ML20077R756
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/31/1994
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20077R341 List:
References
NUDOCS 9501230116
Download: ML20077R756 (10)


Text

,

9 s

OPERATING DATA REPORT-DDCKET NS 50-413 DATE January 13. 1995 0FEFATING STATUS COMPLETED BY R.A. Williaes TELEFHONE 704-392-5346

1. Unit Nace: Catamba 1
2. Reporting Feriod: DeceaDer I, 1994-Decenter 31, 1994
3. Licensed Thersal Pcuer (N t):

3411

4. Naseplate Rating (Stoss N e):

1305+

Notes *Naseplate Rating

5. Design Electrical Rating (Net MWe):

!!45 (Srcss MWe) calculated as

6. Manisas Depend 43!e Capacity (Brcss N e):

1192 1450.000 MVA x.90 poner

7. Maxisus Dependable Capacity (Net MWe):

1129 factor per Page iii,

8. If Changes Occur in Capacity Ratings (ltess Nuster 3 Through 7) Since Last NURES-0020.

i Rtport. Give Reasons:

9. Pos.et Level To Which Restricted, If Any (Nat M e):
10. Reason For Restrictiers, If any:

This Month Yr.-to-Date Cueulative

11. Hours in Reporting Period 744.0 6760.0 83353.0
12. Ncster Of Hours Reacter Was Critical 744.0 9733.5 64511.6 l
13. Reactor Reserve Shutdema Hours

- --0--

--0--

14. Hours Senerator On-Line 744.0 8722.0 63375.5
15. Unit Reserve Shutdan fieurs

--0--

--0--

- 16. Eross Thersal Energy Benerated ( WH) 2497634 28900895 206143431 i

17. Grcss Electrical Eneigy Generated (MWH) 900745 10319615 72683750
18. Net Electrical Energy Generated (MH) 055397 9775B33 68323462
19. Unit Service fatter 100.0 99.6 76.0
20. Unit Availability factor 100.0 99.6 76.0
21. Unit Capacity factor (Using MC het) 101.8 98.9 72.3
22. Unit Capacity fa: tor (Using DER Net) 100.4 97.5 71.6
23. Unit Forced Outage Rate 0.0 0.4 9.1
24. Shutdoan Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

J Lteline - February 11. 1995 - 53 davc:

25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
26. Units in Test Status (Prict to Coesercial Operation):

Forecast Achieved INITIAL CRIilCALITY INiilAL ELECTRICITY COMMERCIAL OPERATION 9501230116 950113 PDR ADOCK 05000413 R

PDR

.s i

o OPERATING DATA REFORT l

DDEKET NO 50-413 (INIT Catawba 1 j

DATE January 13. 1994 COMPLETED BY R.A. Willians l

TELEPHONE 704-382-5346 90 NTH Detenber. 1994 i

l EM, AVERABE DAILY POWER LEVEL DSAl AVERAGE DAILY POWER LEVEL IMWe-Net)

(MWe-Net) i 1

1156 17 1152 2

!!56 IB 1152 3

1121 19 1154 4

1145 20 1153 1143 21 1152 6

1147 22 1149 7

1147 23 1149

'i 8

1151 24 1151 P

9-1154 25

!!52 10 1151 26 1151 11

!!52 27 1152 12 1155 28 1152 13

!!55 29 1151 14 1153 30 1152 s

15 1151 31 1132 16 1153 i

t k

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-413-UNIT NAME. t.arantsa 1

-DATE' ul/la/yd REPORT MONTH December 1994 -

COMPLETED BY x.

a.

williams TELEPHONE

(/ue)

.s uz - ds e d (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X-NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G -' Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of-Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee 4

C-Refueling 3-Automatic Scram (LER Event Report (NUREG-0161))

D-Regulatory Restriction

. 4-Other (Explain)

= File E-Operator Training & License Examination F-Administrative (Explain)

(5)Exhibit I - Same source G-Operator Errpr H-Other (Explaan)

J 4

)

DOCKET: 50-413 UNIT: Catawba 1 Date: 01/13/95 NARRATIVE

SUMMARY

MONTH: December 1994 Catawba Unit 1 began the month of December operating at 100% full power. The unit operated at or near 100% full power for the entire month.

i i

t I

i

+

1 i

i Prepared by: R. A. Williams Telephones (704)-302-5346

)

i 4

l I

'l 4

1 MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name: catawba.

Unit i 2.

Scheduled next refueling shutdown: February 1995

-3.

Scheduled restart following refueling: April 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 1EA 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase ---

9.

Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE: January 13. 1995 Wame of

Contact:

R.

A.

Williamn Phone:

(7041-382-5346 i

.o b

e OPEPATING DATA REPORT DOCKET ND 50-414-

.l DATE January 13. I'95 i

OPERATING STATUS COMPLETED BY R.A. Wilitans i

)

TELEPHONE 704-382-5346

.1. Unit Nase Catawba 2

' 2. Reporting Period December 1,1994-December 31,1994

3. Licensed Thermal Power (MWt):

3411

4. Naseplate Rating (Gross MWe):

1305#

Notes *Naseplate Rating

5. Design Electrical Rating (Net MWe):

!!45 (Gross MWe) calculated as

]

6. Maxisue Dependable Capacity (Gross MWe):

1192 1450.000 MVA x.90 power 7.' flaxieus Dependable Capacity (Net MWr):

!!29 fatter per Page lii,

. E. If Changes Occur in Capacity Ratings (Iteas Nusber 3 Through 7) Since Last NUEEG-0020.

j Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWels
10. Reason for Restrictions, if anyt This Month Yr.-to-Date Ceaulative it. Hours In Reporting Period 744.0 8760.0 73369.0
12. Nester Of Hours Reactor Was Critical 744.0 7068.4 57009.3
13. Reactor Reserve Shutdown Hours

--0--

--0--

--0--

14. Hours Generator On-Lir<e 744.0 6901.9 56061.4
15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

16. Gross Thereal Energy Generated (MWH) 2527428 22809044 179698863
17. Gross Electrical Energy Generated (MWH) 901752 8122121 63699380
18. Net Electrical Energy Generated (MWH) 856984 7675496 59965553
19. Unit Service Factor 100.0 79.7 76.4
20. Unit Availability Factor 100.0 79.7 76.4
21. Unit Capacity Factor (Using MDC Net) 102.0 77.6 72.2
22. Unit Capacity factor (Using DER Net) 100.6 76.5 71.4
23. Unit Forced Outage Rate 0.0 2.7 8.9
26. Shatdown Scheduled Dyer Next 6 Months (Type, Date, and Duration of Each):

None

'25. If Shut Dt,an At End Of Report Period. Estimated Cate of Startup:

26. Units in Test Status (Prior to Ceeeercial Operation):

Forecast Achieved INiithL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATION i

o OPERATING DATA P.EPORT DOCKET NO 50-414 i

UNIT Catawba 2 DATE January 13. 1994 i

COMPLETED BY R.P. Williass TELEFHONE 704-382-5346 MONTH Detesber. 1994 i

'E AVERASE DAILY POWER LEVEL M

AVERAGE DA!LY POWER LEVEL INWe-Neti (MWe-Nett 1154 17 1135 2

!!54 10 1152 3

!!52 19

!!55 i

4

!!46 20 1155 5

1142 21 1155 6

1148 22 1153 7

!!46 23 1153 i

B

!!50 24 1154 9

1153 25 1155 10

!!50 26 1154

!!53 27

!!55 12 1155 28 1154 13 1154 29

!!54 1

)

14

!!53 30

!!55 1152 31 1155 16

!!53 i

i i

i

-t UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 UNIT NAME,urantsa z

.t

'DATE ul/ la/ n.

REPORT MONTH December 1994 COMPLETED BY x.

A.

nilliams TELEPHONE (ius) as2-daed (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT

-EVENT SYS-CAUSE AND: CORRECTIVE O

P DURATION O

DOWN

. REPORT TEM COMPONENT ACTION TO' DATE E

HOURS N

R/X.

NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S F

1 I

L h

(1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram

'. Entry Sneets.For Licensee i

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

File -. (NUREG-0161) )

Event Reoort (LER E-Operator Training & License Examination F-Administrative (5).

.o G-Operator Error'(Explain)-

Exhibit I - Same Source.

H-Other.(Explain) 7 1

m m

. =.

, _ _, _.. _.. _ _. ~. _ _ _

.-...m.

.-w..r.-..

&fi

.9:

o

' DOCKET: 50-414 UNIT: Catawba 2 Date: 01/13/95 NARRATIVE

SUMMARY

MONTH December 1994 Catawba Unit 2 began the month of December operating at 100% full power. The unit operated at.or near 100% full power for the entire month, f

i Prepared by: R. A. Williams Telephone: (704)-382-5346

a

s 4

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: catawba.

Unit 2 2.

Scheduled next refueling shutdown: September 1995 3.

Scheduled restart following refueling: November 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMbHINICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: AAA 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase: ---

9.

Projected date of last refueling which can be accommodated by present licensed capacity: Sentember 2011 I

DUKE POWER COMPANY DATE: January 13. 1995 Name of

Contact:

R.

A.

Williams Phone:

(704)-382-5346