Monthly Operating Repts for Jul 1991 for McGuire Nuclear Station Units 1 & 2
ML20077Q304
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 07/31/1991
From: Tuckman M, Robert Williams
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9108210186
Download: ML20077Q304 (12)


Text

,

4- .

p-

l. l -

, ,, Duke lharr Con:pany 4(S nro ysv ,

\urlear 1%h,ctwn H< vt 11, e rir.wh n! I l'Il Hat lHHi Am it ar lfreratwns CL,vior:v, % C .31--liv! livliti.11GI L

i f DUKE POWER L

I' August 15, 1991 U. S. Nuclear Regulatory Commission <

Attention: Document Control Desk Washington, D. C. 20555  ;

Re: McGuire Nuclear Station i Docket No. 50-369 and 50-370 i i

Dear Sir:

Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of July 1991. ,

Very truly yours, [

,15' u/L bVAe6A.

i M.S. Tuckman JAR /15/ jar ,

Attachment -

s xc: Mr. Stewart D. Ebneter American Nuclear Irsurers Regional Administrator / Region II i INPO Records Center Mr. Richard G. Oehl, NE-44 U.S. Department of Energy 19904 Germantown Road Mr. T.A. Reed, ONRR Germantown, Maryland 20874  ;

Mr. P.K. VanDoorn Ms. Vickie White Senior Resident Inspect t Nuclear Assurance Corporation  !

6251 Crooked Creek Road  !

Norcross, Georgia 30092 4' *4k  %

~.tUU1J ti K O, l rsat .

/ ' Is

. . . , - . _ _ . _ . _ . _ _.. _ ._. .~ __. .-. .

._ -, .- - - .. ~ - . - ~ ._- _

i t

,' =.
---. e OPEFATING DATA FEPORT --

a i-

{

D0CrEI NO 50-369 DATE Amiust 15. 1991

- OPERAfits STAI G COMPLETED BY __ P.A. Williees TELEFHME 704-37 M 997 r

1rUnitNanetMcGuire!  !

2. Reporting Seriodr July 1, 1991Nuly 31, 1991 l

- 3.-Licensed Thereal Power (MWtli 3411

4. Naseplate' Fating'(Gross MWe): 1305s' Notes M stplate Rating l
5. Design Electrical Rating (Net M M : 1180 (Gross MVel calculated as  !
6. Marlous Dependable Capacity (Gross MWe): 1171 1450.000 MVA x .90 power l
7. Maxieus Dependable Capacity iket MWe): 1129 facter per Pace ill, j
8. If Changes Occur in Capacity Ratings (Itens Nueter 3 Through 7) Since Last NUREG-0020.

Report. Give Reascos:

t i

i

9. Power Level To Which Hestricted, If Any (het Hse): ,

j

10. Reason for Restrictions, If any .

l This Month .Yr.-to-Dite Cusulative [

.I i

!!. Hours In Reporting Period 744.0 5087.0 64719.0 [

12. husber Of Hours Reactor Was Critical 744.0 4560.1 60226.1 j 13.FeacterReserveShutcow= Hours --0-- --0--- --0-- l
14. Hours Generator On-Line

~

744.0 4545.2 59565.2- j

15. Unit Reserve Shutdown Hours . .

- --0-- --0-- I 16.- Srpss ineraal Energy Generated IMWH) 2316832 15092069 .!81327631 .

17. Gross Electrical Energy Generated (MWH) _950627- 5228967 62451402- 1

.-10 Net Electrical Energy Generated (MWH1 818735 502610B 59614296

[

19 tinit Service Factor- 100.0- 99.3 70.3  ;

20. Unit Avallability factor 100.0 _ 89.3 70.3. [
21. Unit Capacity Facter (Using MDC Net) 97.5 87.5 60.9  !
22. Unit Capacity factor (Using DER Net) 93.3- 83.7 59.6 .!
23. Unit forced Dutage Rate 0.0 '10.7 12.7 l

- 24. Shutdown Scheduled Over Next 6 Months (Type. Date and Duration of Each): I Refueling - September 20, 19D1 - 9 weeks

^

1

25. If Shut Dean At End Of Report Ferud. Estimated Date of Startup -!
26. Units in Test Status (Prior to Coesercial Operationit Forecast Achieved _j

. INITIAL CRiflCALIT' t INITIALELECTRICITY-  !

COMERCIAL GPERATION  ;

i

?

i i

e

. y. . _ . _ . - _ . _ - _ . . _ . - , _ _ . . - ~ . . __~._.....-m -__g,-. _,-.m _ _ . .

t t

. r i:

I OPERATINS DATA RE00RT I

i.

v DOCKET ii0 50-369 _j UNii McGuire ] .[

DATE Avaust 15,1991 i COMPLETED BY R.A. Williaes . l TELEPHONE 704-373-5997 MONTH hly. 1991

-i l

[Al AVERASE DAILY POWER LEVEL CE AVERASE DAILY F0WER LEVEL l (MWe-Net) (MWe-Nat) 1 -1113 17 1045 .l l

4 2 1120 18 1103

~3 1116 19 1105 4 1111- 20 1104 I i

1113 1103 5 21 l

6 till 22 1103 i 7 1111 23 -1100 ie i

8  !!09- 24 1099 l

9 1106 25 1097 j

i 10 =. 1196 26 1097 [

!103 27 1095 11 _ _ _

f 12 - 1104 1091 13 1102 -- 29 1094 1 4

14 '.; ~ 1072 30. 1094  !

s 15 1090 31 1101 f

-- t s - se,7 i

. 4 i

I 1

i

UNIT SHUTDOWNS AND POWER P!.' DUCTIONS DOCKET NO, 50-369 UNIT NAME Mwulat. - 1 DATE, v a/1:>/ 91 REPORT MONTH July 1991 COMPLETED BY s. w. Must;R -

TELEPHONE ( / ue )-J / J-:> / oz (1) (2) (3) (4) (5)

R MET-E HOD

'T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO t

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S

+

l l

(1) (2) (3) (4) '

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee:

C-Refueling 3-Automatic Scram Event Report fLER)

D-Regulato n Restriction ,

E-Operator Training & License Examination 4-Other (Explain) File (NUEG-0.61)

F-Auministrative (5)

G-Operator Error (Explain) Exhibit I - Same Source l H-Other (Explain) ,

b

. . - . . . .. .- . . . . - ~ - . . - _ . ~ . . . . - . . . - . . - . - . - - - . . . . . . - , - . . . .

9 DOCKET NO: 50-369 UNIT: McGuire 1 l' DATE: 8/15/91 NAhRATIVE

SUMMARY

l-MONTH: July 1991 McGuire Unit 1 began the month cf July operating at 100% full power, The unit operated at or near 10.4 full power for the entire month, and ended the month operating at 100% full power.

=-

m-1 Prepared by: S. W. Moser l- Telephone: 704-373-5762 I

,- ~ . . _ - . - - -~, . . _ . ~ . . . . _ . . . . ~ . - . --

l

i

't MONTIILY REFUELING INFORMATION REQUEST l'. - Facility name: _'McGuiro, Unit 1

2. Scheduled next refueling shutdown: ' September 1991
3. Scheduled restart foltowing refueling: _ November 1991 Ti!E PROJECT MANAGER sis BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY

~

T.S. CilANGE OR LICENT! AMENDMENT. - TilEREFORE, = QUESTIONS 4 Ti!ROUGli 6 WILL -

NO LONGER DE MAINTAINE) IN T!!IS REPORT.

4. Will refueling or resur ption of operation thereaf ter require a technical specification change ot other licenso amendment?-

If yes,_what will-these bo?

If no,-_has rolond desigr. and coro configuration been rovjowed by Safety Review Committoo regarding unreviewod safety questions?

-5. Scheduled dato(s) for submitting proposed licensing action and supporting information:

6. - Important'11conuing considerations (now or different design or. supplier, unroviewed design or performance analysis methods, significant changes in design or new operating proceduros).
7. Number of fuel assemblies (a) in tho core: 193 (b) in the spent fuel pool: 443

" ' _ fl .. Present licensed fuel pool capacity: 1463 Sizo of requested cr planned increase: ---

9? Projected dato of:last refueling which can be accommodated by present

-licenced capacity: March 2006 DUKE POWER COMPANY DATE: August 15, 1991 Name of

Contact:

.7. A. Roavin Phone: 704-373-7567 i

- . . _ _ _ . -- m _ _ _ _ _ . _ . ...-.__m _ - _ _ _ ____ _ ._ . . . . _ _ __~_ _ --. _ .

. .i

(

  • l l

be -1' DPERATING DATA REPORT l

DOCKET NO $0-370 EATE Aucust 15. 1991

. OPEDATINB STATUS CDMFLETED SV- R. A. Wit]jass l TELEPHDNE 704-373-5997 li Unit Naset McGuire 2

-2 Reporting Period: July 1, 1991-Ja.ly 31, 1791

3. Licensed Thereal Power IMWt): - 3411
4. Naseplate Rating (Gross MWe): 1305t: Notes *Nareplate h ting ]

i~ 5. Design Electrical Rating (Net MWe):

1180 (6 toss MWei. calculated as  !

6. Maxieue Dependable Capacity (Gross NWe): 1171 1450.000 MVA x .90 power
7. f.axieus Dependable Capacity (Net NWe): 1129 factor per Page iii, B. If Changes Occur in Capacity Ratings (Itess Nusber 3 Through 7) Since Last NUREG-0020.

Report. Give Reasons:

l^ l l

9. Power Level To Which Restricted, if Any (Net MWe)r
10. Reason for Festrictions, If any: _ ,

I l

i i

l This Month Yr.-to-Date Cumulative l

!!.' Hours le Reporting Period - 744.0 5087.0 65015.0 ll 12. Nusoer Of Hours Reactor Was Critical .699.8 5042.0 49682.9 j

13. Reactor Reserve Shutdown Hours --0-- --0-- --0-- --

.-14. Hours Senerator On-Line 696.9 5039.9 43842.6 _,

15. Unit' Reserve Shutdown Heurs --0-- - --0-- '

.-16. Gross Thereal Energy Benerated (MWH1 2191309 16726213 159331004 j

-17.-Gross Electrical Energy Generated (MWH) 755001 5849492 55778693 IB.. Net Electrical Energy Generated (MW4) 722415 5627622- 53492068 3

__19. Unit Service factor- 93.7 99.1 75.1 l 20. Unit Availability Factor 93.7 99.1 ' .75.1 I '

21. Unit Capacity Factor (Using MDC Net) 66.0 98.0 71.7
22. Unit Capacity Factor (using DER Net) 82.3 93.8 69.8 -i

.-23, Unit Forced Outage Rate 6.3 0.9 B.3 24.ShutpwaScheduledOverNe.tt6 Months (Type,Date,andDurationofEach):

rione L.

1~ - - .

i 25. If Shut Down At End Of Report Period. Estiaated Date of Startup 26.UnitsInTestStatus(PriortoCosaercialOperation): Forecast Achieved l

i L INITIALCRiflCALITY

!: INITIAL CLECTRICITY ,

COMMERCIAL QPERAi!0N

.s_ , , - . . . . . _ . _ _ . . . . _ _ _ _ __ _ . . _. _ _ _ _ _ _ _ _ _ . . -

. _ ._~ . - . . . . . - .. ... ~ . . ~ . = . . . . - . - - . . . . . - . . - . . . .

f

~ OPERATING DATA REPORT

.DDCKET NO M-370 UN!i ' McGuire 2 DATE A9aust 15.1991 COMPLETED EY F._A. Williaes TELEFHONE 709-373-5997 RONTH July,1991

-QAl- AVERAGE DAILY POWER LEVEL PJ1 . A'iERAGE DAILY POWER LEVEL (MWe-Net)- (MWe-Net) 1  !!29 17 _

31t 2 1129 18 598 3- 1125 19 1093 4.. 1125 20 1084 5 1120 21 1114

6  !!!9 22 1114 7 1126 23 1114 8 1123 24 till 9 11h)m, _ ,_ 25 1109 10 IUl_ 26 1053 i=

!! I118 _ _ _ -27 1102 i 12 1:12 . 28 1100

. i 13 .

1025 . 29 1107

't4 - 264 __. 30 till l.

I 15 31 1115 l .16. 122

UNIT SHUTDOWNS AND POWER REDUCTIONS - DOCKET NO. __50-370 UNIT NAME Mwulut, z DATE ub/id/91 .

REPORT MONTH JulV'1991 COMPLETED BY s. w. Mus t.M TELEPHONE (/v4)->/J-n/oz (1) 2) f3 _ (4) (5)

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION . O DOWN REPORT TEM COMPONENT ACTION TO -i

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 91- 7-14 F 47.15 A 1 RC CONROD - MANUAL REACTGR TRIP DUE TO AXIAL FLUX DIFFERENCE 15-P 91- 7-16 F --

H --

ZZ ZZZZZZ SECURE LOAD INCREASE FOR SHIFT TURNOVER i

16-P 91- 7-16 F --

B --

HG ZZZZZZ SECONDARY CHEMISTRY 17-P 91- 7-17 F --

H --

HA VALVEX GOVERNOR VALVE MODE TRANSFER 18-P 91- 7-17 F --

B --

RC INSTRU REACTOR PROTECTION SYSTEM CALIBRATION (1 (2 (3 (4 Forced eason- ethod: xhibit G - Instructions .

S Scheduled A-Equi ment Failure (Explain) 1-Manual for Preparation of, Data B-Main enance or test 2-Manual Scram EntU Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Rect 11atorV Rgstriction 4-Other (Explain) File (NUREG-0161))

E-OPcrator Training & License Examination F-Adt i',istrative (5 G-Oper.stor Error (Explain) rhibit I - Same Source H-Other (Explain)

O

. - - , , . . . , , , . . _ - . , , . . - - . . . . .,,.r.,_ , , , , . _ _ , . ., ,,,. . . - ,m ,..m,, m , , . ~_

T .

l DOCKET NO: 50 370 )

UNIT: McGuire 2 DATE: 8/15/91 )

I NARRATIVE

SUMMARY

MONTH: July 1991 )

McGuire Unit' 2 began the month of July operating at 100% full power.

The unit operated at or near 100% full power until 2030 on 07/12, when a power reduction was begun for nuclear instrumentation (NIS) calibration. The unit reached 95% power at 2113 on 07/12. At 0130 on 07/13, with one channel of NIS calibrated, indicated quadrant power  ;

tilt ratio was out of specification, and a load reduction was l commenced. At 0340 on 07/13, the operators noticed control bank 'D' l groups '1' and '2' control rods were nisalignad, and began boration to realign. The unit was holding at 91% power at 0402 on 07/13. The bank l

'D' rods were unmovable, but trippable. An axial flux difference (AFD) swing was in progress. At 0658 on 07/14, the reactor was tripped from 91% power due to AFD approaching po,1tive tech spec limit. The unit was returned or-line at 0608 on 07/16. During the power increase the unit wa> held at 8% power from 0653 to 0739 on 07/16 for shift turnover, at 30% power from 1030 on 07/16 to 1430 on 07/17 for secondary chemistry, at 40% power from 1534 to 1615 on 07/17 for governor valve mode transfer, and at 51% power from 1b30 on 07/17 to 1713 on 07/18 for reactor protection system recalibration. The unit retuned to 100% full power at 0500 on 07/19, and operated at or near 300% full power for the remainder of the month.

I-l l

l

prepared by
S. W. Moser l Telephone: 704 373-5762 f-

~

l.-

l 1

1 MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire, Unit 2

'2. Scheduled next' refueling shutdown: January 1992 3.- Scheduled restart following refueling: March 1992 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARAi3 COMMUNICATION OF ANY- }

T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL l NO LONGER BE MAINTAINED IN THI; REPORT- .

4. Will refueling ur resumption of operation there- require a technical specification change or other license amendment.

q.

If-yes,'what will'these be?

If no, has reload design and core configuration-been reviewed by_ Safety Review Committee regarding unreviewed safety questions? i

5. Scheduled date(s) for submitting proposed licensing action snd supporting information:

l6. 1Important licensing-considerations (new or'different design or supplier, unreviewed design or performance analysis methods, significant changes-in design or_new operating procedures).

7; ' Number of fuel assemblieu (a) in the core
193

! (b) in the spent fuel pool': 589

8. Presentflicensed fuel pool capacity: _463

' Size of-requested or' planned increase: ---

l

9. Projected'date of last refueling which can be accommodated by
present-licensed. capacity: December 2003

[.

I.

-DUKE POWER COMPANY DATE: August 15, 1991 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

+ - - ,.. .

, . -.. . . - .~-. _._ - - . . . . . .- .

e l

McGUIRE NUCLEAR STATION  !

MONTHLY OPERATING STATUS REPORT June 1991 l

1. Personnel Exposure -

For the month of June, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2. The total station liquid release for June has been compared with the Technica1' Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for June has boon compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this list.

l