ML20077Q139

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for June 1991 for North Anna Unit 1
ML20077Q139
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/30/1991
From: Mladen C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077Q113 List:
References
NUDOCS 9108210082
Download: ML20077Q139 (1)


Text

_

.\\'

(nev.ined)

Di'[RAtlh0 DATA REPORT l

i DoCEtt No.:

50 338 oaf [t July 1991 COMPLEttD BY C. Mladen O*FRatikG $1Atus 1.

Uni t A nme t....

.............korth Arvia 1 2.

Reporting Period!

............. June 1991 3.

L ic ensed t h er rns t Power (MWt ) t...........

2.B93 4.

kamet.l at e Rat ing (Cress MWe)..

947 5.

Design tiectricat 8ating (het MWell..

907 6.

Montman peperdabte Cepacity (0ross MWe)t..

959 7

Moimati Dependable Capac ity (het MWe)t....

911 M.

If changes occur In Capacity Ratings (ltems ho 3 thru 7) since last report, give reesonst h/A 9

Power levet to which restricted, if any (Net MWe)t _ h/A

10. Reasons for restrictions, if any:

N/A this Month T*t D Ctanulat ive

11. hours in Reporting Period...

720.0 4,343.0 114,155.0

12. Nstcr of Hours Reactor was Crtticat................

720.0 2,802.6 B2,793.5

13. Reacter Reserve shutdown Hours.

0.0 42.0 6,645.6

14. Nours Generator On line..

720.0 2,664.4 79,684.4

15. Unit Reserve Shutdown Hours.....................

0.0 0.0 0.0

16. Cross Thermat Energy Generated (MWH)...........

........ 2,081,856.1 6,901,921.6 211,688,157.8

17. Cross E lect ricat Energy Generated (MWH).....

685,057.0 2,269,963.0 69.611,301.0

18. het I t ec t r ic al inergy Generat ed (MWH)...

652,414.0 2,152,579.0 65,881,331.0

19. Un i t S e r v i c e h e t e r...................

100.0%

61.3%

70.0%

20. Unit Availability Factor.....

100.0%

61.3%

70.0%

21. Uni t Caosc i t y f ac t er (usin9 MDC het )...............

99.5%

54.4%

64.5%

22. Unit Capacity f actor (using Ottt Net).

99.9%

54.6%

63.6%

23. forced cutage Rate.............

0.0%

11.0%

12.5%

24. Shuteewns Sched;ted over heut 6 Months (Type. Date, and Duratien of tach)

_h *ane

25. If thutdown at end of Report Period, estimated time of Startunt _,_N/A
26. Units in test Status (Prior to Conrwrcial Operation):

Forecast Achieved INlilAL CRITICAllfY lh!11AL CLICTRIC11Y COMMtRCIAL OrER411ON ogOS21tn_%,.!.

pc y

ADOO..VMHy.g?

R

_ _ - _ _ - _ _ _ _ _ _ _ - _ - _ _ _ - -