ML20077Q134

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for May 1991 for North Anna Unit 1
ML20077Q134
Person / Time
Site: North Anna 
Issue date: 05/31/1991
From: Mladen C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077Q113 List:
References
NUDOCS 9108210078
Download: ML20077Q134 (2)


Text

- - - - - - - - - - - -

Revised Pages for May and June 1991 North Anna Unit 1 Monthly Operating Reports r

e i

'y'1 h h 2 k h h 7 h h 1 h b k 4

~

ADOCK OSOO(:.GP PDR PUh R

.y__

otta AllNG DAt A FIPORT DDCKit h0.:

50 338 DAf t t June 3,1991 COMPit1!D Bf C. Mladen critA11N $1Afu$

1 Unit Names................................korth Anna 1 2.

D epor t i ng Per i od s.........................May 1991 3.

t t e ensed t herma t P owe r (MWt ) t.............

2,893

4. - kament at e nat ing (Gross MWe).............

94 7 5.

Design (tectrical toting (het MWe)t.......

907 6.

Ctantemn Dependable Capacity (Cross MWe)..

959

?.

Mnal u Dependable Capacity (het MWe)....

911

8..lf changes occur in Capacity Ratings (!tems No. 3 thru 7) since last report, give reasons:

N/A

9. -Power level to which restricted, if any-(Net MWe): _ h/A

.10. Acanons f or restrictions, if any:

W/A this Month Yat D Cunulat ive i t. H our s i n R epor t i ng P e r i od...........,....................

744.0 3,623.0 113,435.0

12. Nanber o f Hnurs teac toe was Cri t ical.....................

521.0 2,082.6 82,073.5

13. Desctor Reserve Shutdown Hours...........................

20.4 42.0 6,645.6 14. H our s Gener a t o r 0n' t i ne..................................

413.5 1,944.4 79,164.4

15. Unit Reserve Shutdown Hours.............................

0.0 0.0 0.0

16. Gross Thermat (nergy Generated (MWH)..........

...... 1.022.552,9 4,820,065.7 209,806.301.7

17. Gr oss E l ec t r i c al E nergy Generat ed (MWH)..................

327,240.0 1,584,106.0 68,925.444.0

_18. Net tiectrical Energy Generated (MWH)....................

309,146.0 1.500,165.0 65,228,917.0l

~

19. Un i t S e r v i c e f a c t o r....................................

55.6%

53.7%-

69.8%

20. Unit Availability factor...,...........................,.

55.6%

53.7%

69.8%

21, Uni t Capac i t y f ac t or (using HDC Net )...................., -

45.6%

45.5%

64.2%

' 22. Uni t Capac i t y F ac t or (us ing Ot t Net ).....................

45.8%

45.7%

63.4%

23. Iorced outege Rate.....................,.................

44.4%

14.5%

12.6%

24. Shutdowns $cheduled over tent 6 Months (Type, Date, and Duration of tech): _ hone l
25. If $hutdown at end of Report Period, estimated time of.$tartup:

N/A l.

26.' units in fest $tatus (Prior to Correnercial Operation):

forecast Achieved IN111AL CRITICALITY IN111 At ELECTRICliv COMmtRCIAL OttRAft0N

-