ML20077Q134
| ML20077Q134 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/31/1991 |
| From: | Mladen C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20077Q113 | List: |
| References | |
| NUDOCS 9108210078 | |
| Download: ML20077Q134 (2) | |
Text
- - - - - - - - - - - -
Revised Pages for May and June 1991 North Anna Unit 1 Monthly Operating Reports r
e i
'y'1 h h 2 k h h 7 h h 1 h b k 4
~
.y__
otta AllNG DAt A FIPORT DDCKit h0.:
50 338 DAf t t June 3,1991 COMPit1!D Bf C. Mladen critA11N $1Afu$
1 Unit Names................................korth Anna 1 2.
D epor t i ng Per i od s.........................May 1991 3.
t t e ensed t herma t P owe r (MWt ) t.............
2,893
- 4. - kament at e nat ing (Gross MWe).............
94 7 5.
Design (tectrical toting (het MWe)t.......
907 6.
Ctantemn Dependable Capacity (Cross MWe)..
959
?.
Mnal u Dependable Capacity (het MWe)....
911
- 8..lf changes occur in Capacity Ratings (!tems No. 3 thru 7) since last report, give reasons:
N/A
- 9. -Power level to which restricted, if any-(Net MWe): _ h/A
.10. Acanons f or restrictions, if any:
W/A this Month Yat D Cunulat ive i t. H our s i n R epor t i ng P e r i od...........,....................
744.0 3,623.0 113,435.0
- 12. Nanber o f Hnurs teac toe was Cri t ical.....................
521.0 2,082.6 82,073.5
- 13. Desctor Reserve Shutdown Hours...........................
20.4 42.0 6,645.6 14. H our s Gener a t o r 0n' t i ne..................................
413.5 1,944.4 79,164.4
- 15. Unit Reserve Shutdown Hours.............................
0.0 0.0 0.0
- 16. Gross Thermat (nergy Generated (MWH)..........
...... 1.022.552,9 4,820,065.7 209,806.301.7
- 17. Gr oss E l ec t r i c al E nergy Generat ed (MWH)..................
327,240.0 1,584,106.0 68,925.444.0
_18. Net tiectrical Energy Generated (MWH)....................
309,146.0 1.500,165.0 65,228,917.0l
~
- 19. Un i t S e r v i c e f a c t o r....................................
55.6%
53.7%-
69.8%
- 20. Unit Availability factor...,...........................,.
55.6%
53.7%
69.8%
21, Uni t Capac i t y f ac t or (using HDC Net )...................., -
45.6%
45.5%
64.2%
' 22. Uni t Capac i t y F ac t or (us ing Ot t Net ).....................
45.8%
45.7%
63.4%
- 23. Iorced outege Rate.....................,.................
44.4%
14.5%
12.6%
- 24. Shutdowns $cheduled over tent 6 Months (Type, Date, and Duration of tech): _ hone l
- 25. If $hutdown at end of Report Period, estimated time of.$tartup:
N/A l.
26.' units in fest $tatus (Prior to Correnercial Operation):
forecast Achieved IN111AL CRITICALITY IN111 At ELECTRICliv COMmtRCIAL OttRAft0N
-