Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 ML20217Q1951998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Braidwood Generating Station,Units 1 & 2 ML20202C6431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Braidwood Generating Station,Units 1 & 2 ML20198J7091997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Braidwood Generating Station,Units 1 & 2 ML20202H6231997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Braidwood Generating Station,Units 1 & 2 ML20199D0781997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Braidwood Generating Station,Units 1 & 2 ML20217G1571997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Braidwood Generating Station,Units 1 & 2,covering Period 970901-970930 ML20216C2931997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Braidwood Generating Station,Units 1 & 2 ML20198F0321997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Braidwood Generating Station,Units 1 & 2 ML20140C6271997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Braidwood Generating Station,Units 1 & 2 ML20148B2411997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20137N9971997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20136B4371997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20138J9891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20133E1641996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20132B9511996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20134G8341996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20128K2631996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117K7451996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Braidwood Nuclear Power Station Unit 1 & 2 ML20116M6171996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs Nuclear Power Station,Units 1 & 2 ML20115B0731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Bs ML20117K4761996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117D6991996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20101N8121996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Braidwood Nuclear Power Station,Units 1 & 2 ML20100Q7161996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Braidwood Units 1 & 2 ML20100Q7051996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Braidwood Unit 1 ML20097D4171996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Braidwood Nuclear Power Station ML20100Q7021995-12-31031 December 1995 Revised Monthly Operating Rept for Dec 1995 for Braidwood Unit 1 ML20096E6191995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20095F0481995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Braidwood Nuclear Generating Station ML20094H1031995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Braidwood Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With ML20210R6421999-08-13013 August 1999 ISI Outage Rept for A2R07 ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20216D3841999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function1999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20196A0721999-03-16016 March 1999 Cycle 8 COLR in ITS Format & W(Z) Function ML20207J4371999-03-0808 March 1999 ISI Outage Rept for A1R07 ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With ML20206U9011999-02-15015 February 1999 COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20206U9081998-12-17017 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155B6711998-10-26026 October 1998 Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154D4401998-10-0202 October 1998 Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2 ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20195F5911998-09-11011 September 1998 Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl ML20196B3711998-09-0808 September 1998 Cycle 8 Operating Limits Rept (Olr) ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20238F3281998-08-31031 August 1998 SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20198A0151998-06-18018 June 1998 10CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247F7711998-05-0808 May 1998 Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20217K6331998-04-20020 April 1998 Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 1999-09-30
[Table view] |
Text
.
C:mm:nwealth Edis:n Braidwood Nuclear Power Station O Telephone 815/458-2801-a Route 01. Box 84 Braceville, lilinois 60407 August 9, 1991 BW/91-0660 Director, Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk Ger. tlemen t Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Power Station for the period July 1 through July 31, 1991.
Very truly yours,
,CK_ % q, K. L. Ko f ron ['2 -
Station Manager Braidwood Nuclear Station KLK/EWC/cif (227/ZD85G)
Attachments cc A. B. Davis, NRC, Region III NRC Resident Inspector Braidwood Ill. Dept. of Nuclear Safety M. J. Wallace K. L. Graesser T. J. Kovach Nuclear Fuel Services, PWR Plant Support INPO Records Center Performance Monitoring Group, Tech Staff Braidwood Station Nuclear Group, Tech Staff Braidwood Station R. Pulsifer - USNRC A. R. Checca D. R. Eggett - Nuclear Engineering Department k
'h 6
9108130247 910731 \
PDR (4 DOCK 05000456 R FDR
. t l
l l
BRAIDWOOD NUCLEAR POWER STATION l
UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH FDISON COMPANY NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 e
l s
- I. Monthly Report for Braidwood Unit 1 i
A. Slumnu.y_pl_ Ope r a t i ng._IKpfI1RDER Braidwood Unit 1 entered the month of July at reduced power to accommodate condenser weter box inspections. On July 5th the unit returned to full power and operated routinely until July 13th when the unit reduced load for repairs associated with a governor valve. Following repairs the unit returned to full power until July 17th when a failure in the rod control drive controls forced the unit to begin a controlled shutdown.
Before the unit could shutdown the rod control drive system was repaired and the unit returned to full power. The unit remained critical curing this event. On July 23rd the unit reduced power to make repairs on the pneumatic solenoid valves associated with the feedwater isolation valves. While still under reduced power on July 27th maintenance was performed on a mainsteam isolation valve. The repairs were completed and the unit completed the mont.h of July performing routinely.
(227/ZD85G)3
l B. OPERATING _ DATA _REPDRT DOCKET NO. 50-456 UNIT: Braidwood 1 DATE: 08/10/91 COMPILED BY: C. E. Parshey TELEPilONE: (815)458-2801 ext. 2173 OPERATING STATUS
- 1. Reporting Period: July, 1991 Gross Hours: 744
- 2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 1175 Deslyn Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 adax Dependable Capacity (MWe-net): 1120
- 3. Power level to which restricted (If Any): None
- 4. Reasonc for restriction (If Any): None Ill1S_HONTil IR_.T0JATE ._EUMULATIVE_
- 5. Report period Hours: 741D 5082__ 16316
- 6. Hours Reactor Critical 111.Q 1817.1 _ _18110 4
- 7. RX Reserve Shutdown Hours: OJ 0.0 0.0
- 8. Hours Generator on Line: Illd 1771J 18101,7
- 9. Unit Reserve Shutdown Hours: 0.0 0,3 QJ_
- 10. Gross Thermal Energy (MWH): lag 5D L 1610A17 5A111sB7
- 11. Gross Elec. Energy (MWH): _131QRD__. 15213AD _ lEli2SHL
- 12. Net Elec. Energy (MWH): _6D6486 1457220 12]lD31$__
- 13. Reactor Service Factor: 1QL3 3L1 11.1
- 14. Reactor Availability Factor: 10DJ 3hl 71,L
- 15. Unit Service Factor 10d MJ 6hl_
- 16. Unit Availability Factor 9&d 33 .0 6 9 d_
- 17. Unit Capacity Factor (MDC not): 72.8 2L1 _ 6Qal_
- 18. Unit Capacity Factor (DER net): 72J , IL1 QD.1
- 19. Unit Forced Outege Rate: _ LL 4h1 13 1
- 20. Unit Forced Outage Hours: _12.a _ li21d 2 9D1d_
- 21. Shutdowns Scheduled Over Nm t 6 Months: None
- 22. If Shutdown et End of Report Period, Estimated Date of Startup:
(227/ZD85G)4
i e'
]
i l
C. AYIEAQE DAILY UNIT _ NET POWER __ LEVEL LOG DOCKET NO.:- 50-456 UNIT: Braidwood 1 DATE: 08/10/91 COMPILED BY: C. E. Pernhey TELEPHONER. (815)458-2801 e x t' . 2173 j HONTH: . July, 1991
- 1. 960 17. 65.4 )
l
-- 2 . 816 18. .791 l I
- 3. 765 19. 792 j 4, 674 20. Ell _
- 5. 933 21. 1082 ,
- 6. 1076 22. 1115 >
7, 951 23. 728 .
- 8. 1065 24. 258
- 9. 1114 25. 26D
'10, 1009 26. 174
- 11. 1047 27, 179 12.- 1109 28.- 373
- 13. 803 29. 871
- 14. 890 30. 919
- 15. _
986 31. 952 16 1033 INSTRUCTIONS On this. form list the average daily unit power level in MWe-Net for each day-in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note-that when maximum dependable capacity is-used for the net electrical rating of the unit there may be occasions when the daily average power level-_ exceeds the 100% line (or the restricted power level line). In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
-(227/ZD85G)5
NDCKET NO.: 50-456 D. UNIT SHUTDCWNS/REDUCTICNS UNIT: Braidwood 1 DATE: 08/10/91 -
COMPILED BY: C. E. Pershey TELEPr10fiE: (815)458-2801
- ext. 2173 REPORT PERIOD: July, 1991 No DATI 2"ll'I HQUES RIASOH METHQD LER NUMBER SYSTEM COMPONElG CAUSE & CORRECTIVE ACTIO1L 5 N/A TG XT Power was reduced to replace a failed linear 4 910713 F 0.0 A variable differential transformer on the number 2 governor valve.
0.0 A 5 91-007 AA OSL A controlled shutdown was initiated due to 5 910717 F failed rod control drive firing card on Bank 1A of the control rod drive mechanism. The card was replaced before the unit was required to complete shutdown.
5 N/A SJ SOL Power was reduced to repair / replace failed 6 910723 F 0.0 A pneumatic solenoids on IFWOO9A, B and D.
A 5 N/A SJ SOL Continuation of power reduction to repair 7 910724 F 0.0 solenoids on IFWOO9A, B and D.
N/A SB TC Generator taken off line to repair leak on the 8 910726 F 12.1 A 1 IB MSIV *F* flow control valve caused by 'O' ring not being properly compressed. Machined the proper dimension in the *F' valve cartridge which enabled the 'O' ring to compress properly.
SUMMARY
METHCD SISTER 4 & COMPftLENT ._
TYPE REASON 1 - Manual Exhibit F & H F-Forced A-Equipment Failure Instructions for Preparation of 2 - Manual Scram S-Scheduled B-Maint or Test 3 - Auto Scram Data Entry Sheet C-Refueling Licensee Event Report 4 - Continued D-Regulatory Restriction (LER) File (NUREC-0161)
E-Operator Training & License Examination 5 - Reduced Load 9 - Other F-Administration G-Oper Error H-Other !
l (227/ZD85G)6
?
~
j E. UNIOUE REPORTING RECUIREMENTS-- Unit'1 ' '
- 1. ' Safety / Relief valve operations..
1 ,
VALVES NO & TYPE PLANT DESCRIPTION
, DATE -ACTUATED ACTUATIC?{ CONDITION- OF EVENT l NONE i i
a
- 2. Licensee generated changes to ODCM. .
None !
-t
.I t
+
.5 i
1 t
.t
-1 (227/ZD85G)7 ;
4 l
F. LICItiSEE_fiD1TlEf0RTS 1I101_1 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, July 1 through July 31, 1991.
This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
Licensee Event Report EcpoLLilwobeL Dats IllittoLorcurrence None (227/ZD85G)B
i
- 1. Monthly Report for Braidwood Unit 2 A. Siman t y_.3r LDpe r atint.Expe rie nc e Braidwood Unit 2 operated routinely from July 1 through July 14, 1991 when the unit reduced power to inspect a condenser water box for tube leaks. After completion of repairs the unit returned to normal operation until July 20, 1991 ws.cn power was again reduced to inspect and repair tubes in a condenser water box. On July 24, 1991 the unit began coasting down inr the second refueling outage scheduled to begin in September, 1991.
(227/ZDB5G)9
-~ -. . -- . .- - - - _ ~ . . ~. _ - - , _.
-- B. , OPERATING _. DATA _REEORT DOCKET NO.: 50 457 UNIT: Braidwood 2 DATE: 08/10/91 COMPILED BY: C. E. Pershey.
TELEPilONE (815)458-2801 ext. 2173 OPERATING' STATUS
- 1. Reporting Period: July, 1991- Gross Hours: 744 2.= 'Cuttently Authorized Power Level-(MWt): 3411 Design Electrical Rating (MWe-gross)4 1175
. Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 l Max Dependable' Capacity (MWe-net) -- 1120
- 3. Power level to which restricted (If Any): None ,
1
- 4. Reasons for restriction (If Any): None IlilS_liOHTl! YlLT0_DATE CUMULATlYE
- 5. . Report period flours: 14410 5 QED _ 21418.__
- 6. ilours Reactor Critical: . 7 4b.0 4 elf __ 2M91Qal
- 7. RX Reserve Shutdown llours: 0.R OJ LD
- 8. Cours Generator on Lines 74bD 4315 5 2015L1 1
- 9. Unit Rc. serve Shutdown flours: D.D .L D LD
- 10. Gross Thermal-Energy (MWII): _214355A_ _ 1550.4214 _ 509L4272_ _ .-
13 . - Gross Elec. Energy (MWH): _ 7I1816 _. 5120191._ '2DB55551 _
- 12. Net. Elec. Energy (;1W11): _.211553 _ _.5129175 . 199.51255 -
- 13. deactor Service Factor: laQd_ %1 8521
- 14. Reactor Availability Factor: 1QO20 _hl- ALl
- 15. Unit Service Factor: 100.Q_ 95.8 El
- 16. Unit Availability Fhetor _ _100.0 9La 85.1
- 17. . Unit Capacity Factor (MDC net): _J 0. 6 .LR 73.A
- 18. Unit Capacity Factor (DER net): E 1. ED _mD
- 19. Unit Forced Outage Rato OA _. .b2 3d
- 20. Unit Forced Outage Ilours: 01 211.5 . 82hl
- 21. Shutdowns Scheduled Over Next 5 Months: September 1991 _ Refuel Outage
- 22. If Shutdown at End of Report Perlod, Estimated Date of Startup
-(227/ZD85G)10
C. AVIRAGE_DAILLUNILNELPONER LEVIL_ LOG DOCKET NO. 50-457 UNIT: Braldwood 2 DATCt 08/10/91 COMPILED BY: C. E. Pers. hey TELEPHONE: (815)458-2801 ext. 2173 MONT11: July, 1991
- 1. 1003 17. ___ 1989
- 2. lab 1 18. 1QB3 _ _ _ _ _
- 3. __10BA_ __ 19. 1013
- 4. 1015 70. Dal 5, 1Rab 21. __ Bih_
- 6. 1083 22. E18
- 7. 1R83 23. 913
- 8. lqa1 24. _1072
- 9. 10.B3. _
- 25. 1Q47 _
10, 1087 26. 1Q34
- 11. 10a6 27. 1024
- 12. lQED 28. 1003 13, 1057 29. 985
- 14. BQ1 30. 912
- 15. 796 31. _9_11 16, 935 INSTRUCTIONS On this form list the aver'qo daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases the average dally unit power output sheet should be footnoted to explain the apparent anomaly.
(227/ZD850)11
DOCKET NO.: 50-457 D. UNIT SHDTDCWNS/REDUCTICNS UNIT: Braidwood 2 DATE: 08/10/91 COMPILED BY: C. E. Pershey TELEPHONE: (815)458-2801 ext. 2173 i
REPORT PERIOD: July, 1991 l l
__HQ_. DATE IIEE liCURS REASCH MEIliCD LER__HUMBER SYSTEM CCMPONENT CAUEE & CORRECTIVE ACTION TO 5 N/A KE COND Power was reduced to inspect the condenser 6 910?I4 F 0.0 B waterbox for tube leaks. Leaks were identified and the tubes were plugged.
5 N/A KE COND Power was reduced to inspect the condenser 7 910720 F 0.0 B waterbox for tube leaks. Leaks were identified and the tubes were plugged.
SUMMARY
METHOD SYSTEM & CCNPCl.ENT TYPE REASON 1 - Manual Exhibit F & H F-Forced A-Equipment Failure Instructions for Preparation of 2 - Manual Scram S-Scheduled B-Maint or Test 3 - Auto Scram Data Entry Sheet C-Refueling Licensee Event Report D-Regulatory Restriction 4 - Continued 5 - Reduced Load (LER) File (NUREG-0161)
E-Operator Training & License Examination F-Administration 9 - Other G-Oper Error H-Other (227/ZD85G)12 3
i
mm E. UNIOUE REPORTING REOUIREMENTS - UNIT 2-
- 1. Safety / Relief valve operations.
NO & TYPE PLANT DESCRIPTICN VALVES CORDITION CF EVENT DA2'E ACTsIATED ACTUATION None I
- 2. Licensee generated changes to ODCM.
None 1
i l
l (227/ZD85G)13
4 9
=-4. '; .
- r. LICENSEE _IVENLEEPfRTS - UNIL2 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, July 1 through July 30, 1991.
This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
Licensee Event Report Repart Num12RL DAtt 11110-Qf Occutte21gn None l
l l'.
(227/ZD85G)l4