e bW j
PACIFIC GAS AND ELECTR,IC C O M PANY 77 BE ALE STREET, S AN FR ANCISCO, C ALIFORNI A 94106 TELE PHON E (415) 781 4'11 July 19, 1983 Mr. John B. Martin, Regional Aiainistrator U. S. Nuclear Regulatory Cocnission, Region V 1450 Maria lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DIR-76 Diablo Canyon Unit 1 Inwstigation of Pipe Weld 'lhickness - Errata Sheet
Dear Mr. Martin:
On July 5,1983, PCandE suhnitted a " Report on Investigation of Reactor Coolant Pipe Weld Thickness at Diablo Canyon", dated July 1, 1983.
Enclosed is an errata sheet to that report.
Sincerely, J. O. Schuyler Enclosure cc w/ enc:
Document Control Desk, tRC (2) cGCW.~. Knight _ongtRG Service List 8308120125 830808 PDR 10CFR
- 9. 7 PDR
r J
j
/
i REPORP CN IhVESTIGATION OF REACIOR 000IANT PIPE WEID 'IHIQQESS AT DIABID CAvnN (July 1,1983)
Errata Sheet Page V-4 The sentence in lines 3, 4 and 5 should be deleted, since it duplicates the paragraph which follcws.
Page V-4 In line 16, the first word should be changed frun
" pip" to:
pipe Table V-1 Under "Cohran Definitions," after iten (d), add:
(taken at the weld centerline)
Page A-4 In line 8, the parenthetical expression should read:
(f0.015")
Page A-5 In line 9, the line should read: -
... specialists frun PGandE, Bechtel, and Westinghouse began a...