Y NIAGARA NUMOHAWK NBAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 July 21, 1983 (7078)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
Enclosed is a 30-day interim report in accordance with 10CFR50.55(e) for the problem concerning uncertified field quality control (FQC) inspectors.
This condition was reported via telecon to Mr. H. Kister of your staff on June 20, 1983.
Very truly yours,
~W/'j /QV*
t D. P. Dise Vice President Quality Assurance DPD/TL:ja Enclosure xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. R. Gramm, Resident Inspector 1V C3OOO90537 830721 PDR ADOCK 05000410 dg S
PDR g
NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT UNIT 2 DOCKET NO. 50-410 Interim Report for a Problem Concerning Uncertified Field Quality Control-Inspectors Description of the Problem The problem pertains to inpections performed by six Stone & Webster Field Quality Control inspectors. The inspectors and activities-in question are as follows:
1.
Three inspectors in preventative maintenance 2.
One inspector in welding 3.
One inspector in concrete curing 4.
One inspector in drilled-in anchors This problem is under investigation. A final report will be submitted by August 19, 1983.