MONTHYEARBW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 ML20217Q1951998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Braidwood Generating Station,Units 1 & 2 ML20202C6431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Braidwood Generating Station,Units 1 & 2 ML20198J7091997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Braidwood Generating Station,Units 1 & 2 ML20202H6231997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Braidwood Generating Station,Units 1 & 2 ML20199D0781997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Braidwood Generating Station,Units 1 & 2 ML20217G1571997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Braidwood Generating Station,Units 1 & 2,covering Period 970901-970930 ML20216C2931997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Braidwood Generating Station,Units 1 & 2 ML20198F0321997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Braidwood Generating Station,Units 1 & 2 ML20140C6271997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Braidwood Generating Station,Units 1 & 2 ML20148B2411997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20137N9971997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20136B4371997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20138J9891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20133E1641996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20132B9511996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20134G8341996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20128K2631996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117K7451996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Braidwood Nuclear Power Station Unit 1 & 2 ML20116M6171996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs Nuclear Power Station,Units 1 & 2 ML20115B0731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Bs ML20117K4761996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117D6991996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20101N8121996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Braidwood Nuclear Power Station,Units 1 & 2 ML20100Q7161996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Braidwood Units 1 & 2 ML20100Q7051996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Braidwood Unit 1 ML20097D4171996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Braidwood Nuclear Power Station ML20100Q7021995-12-31031 December 1995 Revised Monthly Operating Rept for Dec 1995 for Braidwood Unit 1 ML20096E6191995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20095F0481995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Braidwood Nuclear Generating Station ML20094H1031995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Braidwood Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With ML20210R6421999-08-13013 August 1999 ISI Outage Rept for A2R07 ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20216D3841999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function1999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20196A0721999-03-16016 March 1999 Cycle 8 COLR in ITS Format & W(Z) Function ML20207J4371999-03-0808 March 1999 ISI Outage Rept for A1R07 ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With ML20206U9011999-02-15015 February 1999 COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20206U9081998-12-17017 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155B6711998-10-26026 October 1998 Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154D4401998-10-0202 October 1998 Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2 ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20195F5911998-09-11011 September 1998 Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl ML20196B3711998-09-0808 September 1998 Cycle 8 Operating Limits Rept (Olr) ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20238F3281998-08-31031 August 1998 SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20198A0151998-06-18018 June 1998 10CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247F7711998-05-0808 May 1998 Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20217K6331998-04-20020 April 1998 Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 1999-09-30
[Table view] |
Text
W..
'j Ctmm:nwidth Edisin Braidwood Nuclear Powsr station
- r~
L ' f_ Route #1, Box 84 Y', ~/ Braceville, Illinois 60407 Telephone 815/458-2801 1,
December 10,1994 BW/94-0179 Director Office of Resource Management i U.S. Nuclear Regulatory Commission Washington, D.C. .
Attention: Document Control Desk
Dear Sir:
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Generating Station for the period November 1 through November 30,1994.
y
/
. i. Kofron ~
Station Manager Braidwood Nuclear Station CEP/dla Attachments 150043 9412150195 941130 PDR ADOCK 05ooo456 L i R PDR /
v '
l
., o i l
BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 1
MONTHLY PERFORMANCE REPORT l Com Ed NRC DOCKET NO. 050-456, LICENSE NO. NPF - 72 NRC DOCKET NO. 050-457, LICENSE NO. NPF - 77
A. OPERA'ING DATA REPORT
~
Docket No: 50 - 456 Unit: Braidwood 1 Date: 12/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: November 1994 Gross Hours: 22_0
- 2) Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacliy (MWe-net): 1120
- 3) Power level to which restricted (if Any): None
- 4) Reasons for restrictions (If Any): None This Mo. Yr to Date Cumulative
- 5) Report Period Hours: 720.0 8,016.0 55,569.0
- 6) Hours Reactor Critical: 720.0 6,256.6 43,854.8
- 7) RX Reserve Shutdown Hours: .0 .0 .0
- 8) Hours Generator on Line: 720.0 6,196.8 43,221.8
- 9) Unit Reserve Shutdown Hours: .0 .0 .0
- 10) Gross Thermal Energy (MWHt): 2,352,866.9 19,873,263.7 135,166,657.6
- 11) Gross Elect. Energy (MWH): 829,314.0 6,879,391.0 45,693,978.0
- 12) Net Elect. Energy (MWH): 799,623.0 6,609,469.0 43,752,28e.0
- 13) Reactor Service Factor: 100.0 78.1 78.9 ,
l
- 14) Reactor Availability Factor: 100.0 78.1 78.9
- 15) Unit Service Factor: 100.0 77.3 77.8
- 16) Unit Availability Factor: 100.0 77.3 77.8
- 17) Unit Capacity Factor (MDC NET): 99.2 73.6 70.3
- 18) Unit Capacity Factor (DER NET): 99.2 73.6 70.3
- 19) Unit Forced Outage Rate: 0.0 2.0 8.5 ;
- 20) Unit Forced Outa0e Hours: 0.0 125.4 4030.5
- 21) Shutdown Schedule Over Next 6 Months: 2/25/95 22)If Shutdown at End of Reporting Period, Estimated Date of Startup:
l
l l
, 1 B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 -456 Unit: Braidwood 1 Date: 12/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: November 1994 Qay MWe-net Qa.y MWe-net
- 1) 1154
- 2) 1153
- 3) 1154
- 4) 1153
- 5) 1151
- 6) 1150
- 7) 1148
- 8) 1150
- 9) 1144
- 10) 1141
- 12) 1143
- 13) 1053 28) 1145 *
- 14) 1128
- 15) 1129
- Due to condenser efficiency I
I l
l l
l
C. UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit: Braidwaod 1 Date: 12/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: November 1994 LER Cause & Corrective Action No. Date Type Hours Reason Method Number Syste n Component to Prevent Recurrence 20 941124 S 0.0 H 5 N/A N/A N/A Reduced load at the request of the Power Dispatcher to follow system requirements
SUMMARY
"* Unit 1 entered the month of November 1994 with 100% capability. Load was reduced 11/24/94 to follow system requirements. The unit operated routinely the remainder of the month.
TYPE REASON METHOD SYSIt-M & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER)
E - Operator Training & Licensee Examination 5 - Reduced Load File (NUREG-0161).
F - Administration G - Operator Error H - Other
D. SAFETYIRELIEF VALVE OPERATIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 12/10/1994 Completed by: Craig Ingold Telephone: 815-458-2801 Vaives No. & Type Plant Date Actuated Actuation Condition Description of Event None l
C A. OPERATING DATA REPORT
, Docket No: 457 e
~
Unit: Braidwood 2
- ' . Date
- 12/10/1994 Completed by: Chris Pershey.-
Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: November 1994 Gross Hours: ZZO
- 2) Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 11Z5 Design Electrical Rating (MWe-net): 112Q Max Dependable Capacity (MWe-gross): 11Z5 Max Dependable Capacity (MWe-net): 1. 20
- 3) Power level to which restricted (If Any): Not e
- 4) Reasons for restrictions (If Any): Nonq This Mo. Yr to Date Cumulative
- 5) Report Period Hours: 720.0 8,016.0 53,651.0
- 6) Hours Reactor Critical: 364.3 5,774.3 44,088.4 4 T
- 7) . RX Reserve Shutdown Hours: .0 .0 .0 I
- 8) Hours Generator on Line: 317.3 5,712.0 43,698.3
- 9) Unit Reserve Shutdown Hours: .0 .0 .0 .
- 10) Gross Thermal Energy (MWHt): 768,974.1 17,542,327.7 132,799,498.8
- 11) Gross Elect.' Energy (MWH): 260,087.0 6,042,412.0 45,156,235.0 ;
- 12) Net Elect. Energy (MWH): 242,582.0 5,802,266.0 43,268,849.0 -
- 13) Reactor Service Factor: 50.8 72.0 82.2 1
- 14) Reactor Availability Factor: 50.6 72.0 82.2-
- 15) Unit Service Factor: 44.1 71.3 81.4
- 16) Unit Availability Factor: 44.1 71.3 81.4 ;
- 17) Unit Capacity Factor (MDC NET): 30.1 64.6 72.0 ,
- 18) Unit Capacity Factor (DER NET): 30.1 64.6 72.0
- 19) Unit Forced Outage Rate: 0.0 18.8 6.0
- 20) Unit Forced Outage Hours: 0.0 1325.3 2771.3
- 21) Shutdown Schedule Over Next 6 Months: ,
- 22) If Shutdown at end of Reporting Period, Estimated Date of Startup:
i 7
, - . , . - - . - . .,,e,na,..,- r - - . - , . . , , , , , . , ,, ,. -~ , . . . ~ . + - .-
I B AVERAGE DAILY UNIT NET POWER LEVEL LOG
, Docket No: 50-457 Unit: Braidwood 2 Date: 12/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: November 1994 Qay MWe-net Qay a MWe-net
- 1) -13 16) -15
- 2) -13 17) -11
- 3) -13 18) 232
- 4) -13 19) 264
- 5) -14 20) 430
- 6) -14 21) 522
- 7) -14 22) 524
- 8) -14 23) 622
- 9) -14 24) 1044
- 10) -14 25) 1117
- 11) -14 26) 1117
- 12) -14 27) 1118
- 13) -14 28) 1117
- 14) -15 29) 1115
- 15) -15 30) 1116 l
l
. . . . . . .. = .. .-
j ..
C. UNIT SHUTDOWNSIREDUCTIONS Docket No.: 50 - 457 Unit: Braidwood 2 --
Date: 12/10/1994 a
. Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: November 1994 I LER .Cause & Corrective Action h Date Tvoe Hours . Reason Method Number System Component to Prevent Recurrence
, 21 941101 S 402.7 C 1 REFUEL OUTAGE
- 1 i
i i
i i
i l
I 1
SUMMARY
- Unit 2 entered the month of November 1994 in refuel outage number four. The unit was retumed to service 10/17/94 with i routine operation starting 11/28/94 following the normally scheduled core physics testing.
, TYPE REASON . _M_ETHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled - B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for
! C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restridion 4 - Continued . Licensee Event Report (LER)
E - Operator Training & Licensee Examination 5 - Reduced Load File (NUREG-0161).
. F - Administration -
G - Operator Error H - Other l
D. SAFETY REUEF VALVE OPERATIONS -
Docket No.: 50 - 457 Unit: Braidwood 2 Date: 12/10/1994 Completed by: Craig Ingold Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None
)
l l
i i
> _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ -_ _ _ _ .____