ML20077F796

From kanterella
Jump to navigation Jump to search
Rev to Tech Spec Table 3.6.2, Operability of Containment Isolation Valves
ML20077F796
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/26/1983
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20077F778 List:
References
TVA-SQN-TS-46, NUDOCS 8308030046
Download: ML20077F796 (5)


Text

..

"69

~

ENCLOSURE SEQUOYAH NUCLEAR PLANT TVA-SQN-TS-46 REVISIONS TO ENCLOSURE 3, CHANGE NO. 3, REVISION OF TABLE 3.6.2 FOR OPERABILITY OF CONTAINMENT ISOLATION VALVES o

4 8308030046 830726 PDR ADOCK 05000327 P

PDR

[~;~==

.T

-ll,,

[' (( #.

-~

j L

'l Alli E 3. fr 2 ( Cont inu...I) 8 m

m S

CONIAltlMlNI 150lAll0H VAIVLS a

]

E HAXIMUH ISOLATI0l1 llAE (Seconds}

VALVE NUMBI-R FUNCTION a

b C.

PilASE "A" CONTAINHENT VENT ISOLATION'(Cont.)

a 4*

N 13.

FCV-30-50 Upper, Compt Purge Air Exh 4*

i 14.

FCV-30-51 Upper Compt Purge Air Exh 15.

FCV-30-52 Upper Compt Purge Air Exh 4*

16.

FCV-30-53

_ Upper Compt Purge Air Exh 4*

17.

FCV-30-b6 Lower Compt Purge Air Exh 4*

1i 18.

FCV-30-57 Lower Compt Purge Air Exh 4*

19.

FCV-30-S8 Inst Room Pur0e Air Exh 4*

20.

FCV-30-59 Inst Room Purge Air Exh 4*

21.

FCV-90-107 Cntmt Bldg LWR Compt Air Hon S*

22.

fCV-90-108 Cntmt Bldg LWR Compt Air Hon S*

23.

FCV-90-109 Cntmt Bidu LWR Compt Air Hon S*

I w

i,

) -

24.

FCV-90-110 Cntmt Bld0 LWR Compt Air Hon

,S*

cn -

4 25.

FCV-90-111 Cntmt 81d0 LWR Compt Air Hon S*

26.

FCV-90-Il3 Cntmt Bldg LWR Compt Air Hon S*

i 27.

FCV-90-II4 Cntmt Bldg LWR Compt Air Hon S*

28.

FCV-90-IIS Cntml Bldg LWR Compt Air Hon S*

29.

FCV-90-Il6 Cntet Bldg LWR Compt Air Hon S*

30.

FCV-90-Il7 Cntml Bldg LWR Compt Air lion S*

D.

OTifER

. 1.

.FCV-30-46 Vacuum Relief Isolation Valve 25 2.

FCV-30-47 Vacuum Relief Isolation Valve 25 3.

FCV-30-48 Vacuum Relief isolation Valve 25

  • Provisions of LCO 3.0.4 are not applicable if valve'is secured in its isolated position with power removed.
  1. Provisions of LCO 3.0.4 are not applicable if valve is secured in its isolated position with power removed and either FCV-62-73 or FCV-62-74 is maintained operabic.

i

i H

l 1 ABt E 3.6-2 (Cont iimed)

N CONIAlllMElli 150lATIOt4 VAtVES S

g MAXIMUM ISOLAlldH 'llME (Seconds)

FUNCTION VALVE NUMBER s

PilASE "A" CONTAINMENT VENT ISOLATION (Cont.)

C.

y 4*

Upper, Compt Purge Air Exh 4*

13.

FCV-30-50 Upper Compt Purge Air Exh 4*

14.

FCV-30-51 Upper Compt Purge Air fxh 4*

j 15.

FCV-30-52 16.

ICV-30.-53 Upper Compt Purge Air Exh 4*

~

Lower Compt Purge Air Exh 4*

17.

FCV-30-b6 Lower Compt Purge Air Exh 4*

18.

FCV-30-57 Inst Room Purge Air Exh 4*

19.

FCV-30-58 Inst Room Purge Air Exh S*

20.

FCV-30-59 Cntmt Bldg tWR Compt Air Hon S*

21.

FCV-90-107 Cntmt Bldg LWR Compt Air Hon S*

22.

FCV-90-108 Catut Bldg LWR Compt Air Hon S*

a a

23.

FCV-90-109 Cntmt Bldg LWR Compt Air Hon S*

24.

FCV-90-110 Cntml Bldg LWR Compt Air Hon 5*

m4 25.

FCV-90-111 Cntmt Bldg LWR Compt Air Hon S*

26.

FCV-90-113 Cntat Bldg LWR Compt Air Hon S*

27.

FCV-90-114 Cntml Bldg LWR Compt Air Hon S*

28.

FCV-90-115 Cntat Bldg LWR Compt Air Hon S*

29.

FCV-90-116 Cntut Bldg LWR Compt Air lion 30.

FCV-90-117 D.

OlllER Va'cuum Helief Isolation Valve t

25 25 1.

.FCV-30-46 Vacuum Relief Isolation Valve 25 t.

2.

FCV-30-47 Vacuum Relief Isolation Valve 3.

FCV-30-48

  • Provisions of LCO 3.0.4 are not applicable if valve is secured in its isolated position t

with power removed.

  1. Provisions of LCO 3.0.4 are not applicable if valve is secured in its isolated position i

with power removed and either FCV-62-73 or FCV-62-74 is maintained operable.

t I

F,

(

I, TABLE 3.6-2 (Continued)

CONTAINMENT ISOLATION VALVES

]a y

MAXIMUM ISOLATION ilME (Seconds)

FUNCTION VALVE NUMBER i

Cl'i A.

PHASE "A" ISOLATION (Cont.)

10 32.

FCV-62-63 RCP Seals 10*#

33.

FCV-62-72 Letdown Line 10*#

~

34.

FCV-62-73 Letdown Line 10*#

35.

FCV-62-74 Letdown Line 20 36.

FCV-62-77 Letdown Line 10*

37.

FCV-63-23 Accum to lloid Up Tank 10*

38.

FCV-63-64 WDS N to Accum 2

39.

FCV-63-71 Accum to Hold'Up Tank 10*

10*

40.

FCV-63-84 Accum to Hold Up Tank 10*

41.

FCV-68-305 WDS N to PRT PRT t$ Gas Analyzer 10*

42.

FCV-68-307 10*

l R

43.

FCV-68-308 PRT to Gas Analyzer 10*

44.

FCV-70-85 CCS from Excess Lt On Hx 60*

T 45.

FCV-70-143 CCS to Excess Lt On fix 10*

Es 46.

FCV-77-9 RCOT Pump Disch 10*

47.

FCV-77-10 RCOT Pump Disch 10*

48.

FCV-77-16 RCOT to Gas Analyzer 10*

49.

FCV-77-17 RCOT to Gas Analyzer 10*

50.

FCV-77-18 RCOT and PRT to V 11 10*

51.

FCV-77-19 RCOT and PRT to V ll 10*

52.

FCV-77-20 N to RCOT 53.

FCV-77-127 F$oorSumpPumpDisch 10*

10*

54.

FCV-77-128 Floor Sump Pump Disch 10*

55.

FCV-81-12 Primary Water Makeup 10*

56.

FCV-87-7 Ull! Test Line 10*

57.

FCV-87-8 UllI Test Line 10*

58.

FCV-87-9 UllI Test Line 10*

59.

FCV-87-10 UllI Test Line 10*

60.

FCV-87-11 UllI Test Line 20 61.

FCV-2G-240 Fire Protection Isol.

20 62.

FCV-26-243 Fire Protection Isol.

l t.

y' i

TABLE 3.6-2 (Continued)

M CONTAINMENT ISOLATION VALVES l

8 s

MAXIMUM ISOLATION TIME (Seconds)

FUNCTION l-I VALVE NUMBER ci'i A.

PHASE "A" ISOLATION (Cont.)

10 32.

FCV-62-63 RCP Seals 10*#

N 33.

FCV-62-72 Letdown Line 1&#

1 34.

FCV-62-73 Letdown Line 10*#

Letdown Line 35.

FCV-62-74 20 j

l 36.

FCV-62-77 Letdown Line 10*

37.

FCV-63-23 Accum to Hold Up Tank 10*

i 38.

FCV-63-64 WDS N to Accum 2

10*

39.

FCV-63-71 Accum to Hold Up Tank 10*

40.

FCV-63-84 Accum to Hold Up Tank 10*

41.

FCV-68-305 WOS N to PRT '

10*

PRTt$GasAnalyzer 42.

FCV-68-307 10*

R 43.

FCV-68-308 PRT to Gas Analyzer 10*

44.

FCV-70-85 CCS from Excess Lt Dn Hx 60*

I

?

45.

FCV-70-143 CCS to Excess Lt Dn lix 4

10*-

i Es 46.

FCV-77-9 RCOT Pump Disch 10*

47.

.FCV-77-10

'RCDT Pump Disch 10*

j.

10*

l 48.

FCV-77-16 RCDT to Gas Analyzer RCOT to Gas Analyzer 10*

49.

FCV-77-17 50.

FCV-77-18 RCOT and PRT to V H 10*

51.

FCV-77-19 RCOT and PRT to V H 10*

52.

FCV-77-20 N., to RCOT 10*

8 53.

FCV-77-127 Fioor Sump Pump Disch 10*

,54.

FCV-77-128 Floor Sump Pump Disch 10*

55.

FCV-81-12 Primary Water Makeup 10*

56.

FCV-87-7 UllI Test Line 10*

i' 57.

FCV-87-8 Ull! Test Line 10*

l 58.

FCV-87-9 UllI Test Line im 59.

FCV-87-10 U111 Tes. *ine 10*

60.

FCV-87-11 UllI Test line 20 61.

FCV-26-240 Fire Prottttio isol.

20 62.

FCV-26-243 Fire Protettim.. Isol.

i i,

,