Forwards Integrated Schedule Semiannual Update (June 1991), Per Condition 2.C.L(10)
ML20077F527
Person / Time
Site: Oyster Creek
Issue date: 06/13/1991
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C-91-1311, C000-91-1311, C321-91-2145, NUDOCS 9106190276
Download: ML20077F527 (24)


Text

_. _ __

4

  • I GPU Nuclear Corporation NUCIMF One Upper Pond Road Parsippany, New Jersey 07054 201 316-7000 T E L EX 136-482 Wnters Direct Dial Number.

June 13, 1991 C000-91-1311 C321-91-2145 U.S. Nuclear Regulatory Comn.iaaion Attention:

Document Control Desk Washington, D.C.

20555 Gentlemen

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50-219 Integrated Schedule Project List Semi-Annual Update l

Pursuant to condition 2.C(10) of Provisional Operating License DPR-16, nPU Nuclear has implemented the Long Range Planning Program for OCNGS.

As re uired by Section V.A of tha Plan, the following attachnents are submitted to provide the semi-annual project list update:

1.

Attachment A contains a new project list of Category A, B and C projects, annotated by an asterisk (*)

o identify new projects.

Completed projects have been removed from the schedule listing. Also l

noted by a double asterish (**)

are budget activity numbering changes.

2.

Attachment B contains a summary of Category A and B projects which l

have been completed, deleted, deferred, changed in scope, or otherwise have had schedule changes with explanations, as appropriate.

9106190276 910613 PDR ADOCK 05000219 R

pop C3212145 v00G1 c eu Nuciea, corporation is e suosid>ery or oenerat euei:c vi,i,iies co,norat.on f6#

y,

.m....._

. ~. _ _ _ _ _ _ _ _ - _. _

.__m.___

c l

Intograted Schedulo

  • Project List Semi-Annual Update Page 2 Two (2) new category B projects have been added to the project list in Attachment A.

Five (5) Category B schedule changes are discussed in Attachment D.

Pursuant to the LRPP for Oyster Creek, it will be assumed that you are in agreement with the above Category B changes if you do not respond to this submittal within 15 days of receipt.

Sincerely, R. L. Long

/

Vice President and Director Corporate Servicen/THI-2 RLL/GMG/ pip cc Director, Project Directorate I-4 Region I, Administrator NRC Project Manager Senior NPC Resident. Inspector, OCNGS l

t I

f

(

s C3212145 1

I

.-v...--..

-.,.,.,-,-.,..-,.,.---.,-,,.c--

-+ -.-.,, - ---, - -,.,,

,--,-,.w.

...-n....n..-

.g g

i s

1 ATTACHMENT A OYSTER CREEK NUCLEAR GENERATING STATION NRC INTEGRATED SCHEDULE SEMIANNUAL UPDATE-(JUNE 1991)

-1 l

i l

1-r OYSTER

'C R.E E K P.ROJECT LI' STING 1

p i

l, LEGEND

+

NRC INTEGRATED SCHEDULE 1

+

NEW PROJECTS.


== ---- -----------------

i BA NUMBER CHANGE CATEGORY

  • A*

PROJECTS 1

SORT BY CATEGORY / CYCLE /BA STATUS AS OF 13JUN9}

I

?

.-----7 C3S BA DESCRIPTION CYCLE /

CLASSITICATION

~

NUMBER YEARS j

h 1 402AEI ATWS (ARI WOD 1 14R NCR

[

CR t

WODIFY ARI SYSTEM (10CFR50.62). GPUN I

MEMO TO NRC DATED 3-29-91 INDICATES t

EXEuPTION REQ.TO BE SUB. 6-23-91 6

j J

2 402965 STATION BLACKOUT WODIFICATIONS' 14R NED YARD TB 4160 i

. INSTALL A POWER SUPPLY TIE BETWEEN THE F

COMBUSTIDH TURBINES AND THE OCNGS 70 t

i MEET 10 CFR 50.63 f

i 3 '402011 REPLICA SIMULATOR 91 NRR

?

YARD I

SUBWIT CERTIFICATION ( 10CF 455. 45) FOR

[

T OC CONTROL ROOM REPLICA SIMULATOR.

i I

SCHEDULE EXTENDED BY NRC 3/27/91 LETTER.

i i

f l

t l

l l

l i

r i

s

[

t h

h I

i-I t

I i

I i

i k

i

?

(

!t j

Ij

.l

.l

}

ii 1 _

9 _

M_

u_

J_

3 1 _

r_

O_

S_

A S.N UO T

A.I

.T T

S_C A

.I R

R R

R R

R R

R

.F N

N N

N N

N N

N R

R R

R R

R R

R

_I

_S

.S

.A L

._ C G_

N.

I.

E_

T L_

S U_

I-D-

L-

_/

=

E.

_ E S __

_LR_

R R

R R

R R

=_

H_

_CA 3

3 3

3 3

3 3

3 T.

C.

_YE_

1 1

1 1

1 1

1 1

_CY C..

S-S E.

T J._

C D-E O_

J E-O R __

R T.

P P_

A _

g R_

R _

G_

y 6

C E_

a E

E e

T S D E_

E N P G

S DS Y

I 9

L E_

SA O S T_

R W $.

E A*

NE S

Z9 OE I

L R_

T O

wNS AV9 1E Z1 TR S H A

N_

A T

DAE N

1N8 O6 SA I C w

L 8_

C_

C A1R P SA O

N0 E

V E A

I_

E R U S RV1 I SL7 BT E T LR T

FD N O 2 T RL NGS SS R

OO A

F7E I TD-A OAC REE AE S

RN R_

D O C AE2 C TTR URC N

C D TY C.

P EO M LT I

ASN TUA I A N!

U E SSR E UAR D CN P.

E N.F E_

EE G

Ow R -

T TOP T

MRE N IIO S

R R N VV O E C

T _

N S NP S UET I D T N

EU O OL L H D

D H-A A ESE Y

CPT N.

I DGS I MA T

O LO0 S_

W TIT S COE R

RA T EV P

M I 1_

A G 9_

N D NDA A

L S E T CTD C M S R. U U

Y _

I A O I R R

S POT U UE E U S S NI2

.N R C

.R I EIU E DGT EOR P SC P E Y

AT O_

.O S

8P A VAP R

.E L H P S

Dw R

S ML0 T

D O

L G PDM I

E 2. R L

A TR N5LR R D U1 T

L E Z T

A0 RQO N

2N I9E E D L XM

.P U

R YVP S V4, AA NU R F1O BWN T

A O R D I

1 S

O LNP N TYLIP E O I CR I

S R

EE

.R E

T A

A I 6F4 L O G T uT C G O

T EDT

_C I R S N&

3O1 E RS X

NoA S5NL O A N NUA I

wA A

V D9TS

_S E ORL G7I*

CRB O TLD

_E I E FR 7I L TT8 1NER IFU IBPT S

C C

_D C

A.

O N D 2_ V T

V SS8 G1 ORC E T S

.RIA YCS OER N

EE O CP L CDN PM A

I L TRE I RR T

AVS O TT L

N Z EEI R H A

PT A _

P OA Uw NT S B EFI Z PN G TG P0T U S T L.

O PS ORE N I6EE B_

RCN OwSOE UWCN S8 NREOE E

/

T Rr NOLSE RKKG XCAAM NONPV ADEI 4RE ACGTL G

O A PKT T OO R

L E __

,R ITG PG E EU M N N

L CE E MNN N RRC P

A D Su S SG R DS ASC A

C_

E NH L AAO O TTR C E1L R TOE C NA O NS X

HYR S H Y _

S IT C STC C SSN O R1A C UPR R IL C UI R CSN T C C_

C

/ _

E R f _

J E R.

O B O_

R M G_

P U E

N T _

w A _

R 2

1 3

5 0

4 9

8 E

D_

E A

C_

0 4

1 3

0 0

7 9

N N B

.AB 3

6 6

6 1

2 2

2 E_

Y.BM 5

3 3

3 8

8 8

8 G_

B.

U_

1 2

2 2

2 2

2 2

E_

N_

3 3

3 3

3 3

3 3

L

=

T.

R.

O_S 4

5 6

7 8

9 0

1 S_O B

1 1

I

OY STER CREEr PR OJECT LIST ING LEGEND NRC IN TEGR A TED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

  • B' PROJECTS STATUS AS OF 13JUN91 SORT BY CATEGORY / CYCLE /BA Cs %SSIFICATION CYCLE /

CBS BA DESCRIPTION YEARS NUVBER


..--...--.....--------------------------....-------------------------------=-

NRR 13R 12 402859 ESW FLOW INDICATION ( CONTROL ROOu 1 CD INSTALL POWER SUPPLIES. SIGNAL CONDI TIONERS. AND INDICATORS IN C.

R.

PANEL 1F/2F. REG GUIDE 1.97 REC *TS.E/M TIEINS NDR 132 TORUS O2 SAMPLE LINE ISOLATION 13 402872 CR RB23 REWIRE FROM RELAYS Ita TORUS O2 ANALYICQ PANEL RUN CABLE FROM CONT.PART. MON. PANEL TO TORUS O2 PANEL,WODIFY CONTROL SWITCH.

NRR 13R RPS/ESG INSTRUMENT UPGRADE 14 402879 R851 RB23 TB REPLACE APPROX 31 PRESS. SWITCHES.

OPERATIONAL / MAINTENANCE CONCERNS.

SEP TC9IC VII-1.B. NUREG0822. SECT 4.28 Isu 13R 15 402900 ISO CONDENSER PIPING MOOS DW RB75 4895 REPLACE ALL ISO COND PIPING OUTSIDE THE DRYWELL MODIFY / REROUTE VENT PIPING AND REPLACE 6 10" cot 4T. ISOL ATION VALVES.

NRR 16 402927 UPGRADE P.S. TO ISO COND. VLVS, APP. R 13R RB51 RB75 CR INSTALL CONDUITS & CABLE. FIRE WRAP AS REQ'D. WIRING CHANGES TO CR.10CFQ50.48 APP. R REQ'UTS. (ISO CONDENSER).

NRR 13R 17 402938 RWCU PENETRATION PIPING REPLACEMENT DW RB REPLACE THE PIPING IN THE RWCU SYSTEu i

PENETRATIONS WITH IGSCC RESISTANT PIPING (G.L.88-01). INSTALL FLOOR PENETRATION.

NRR 13R 18 402946 CONTAINCENT ISOLATION VALVE REPLACEMENT RB DW INSTALL ONE SPECTACLE FLANGE TO FACILITATE 10CFR50 APPENDIX J.

TYPE C TEST.

URC 13R 19 402951 DRfwELL CORROSION CONTROL DW ROUTINE INSDECTION AND AUGUENTED INSPECTION.

m s

OY S TER CREEK PROJECT LISTIN G l

e LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.

i BA EJMBER CHANGE CATEGO2'

  • B*

PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 13JUN91 OBS BA DESCRIPTION CYCLE /

CLASSIFICATICH NUMBER YEARS


. --...----..._.----..---------..- ------....---...-------. -- _ __------- ---------=-_

_.----....--------.----- =------

i I

20 408815 EDG FUEL OIL TANK REPLACEMENT 134 NER

[

EDG UNDER THIS BA. ADD CHECK VALVE TO TANK

[

FILL LINE. TO MEET NRC COMMITMENT.

l SEP REQ *MTS.(MISSILE PROTECTION) 21 408820 REPLACEMENT OF ROSEMOUNT 1153 TRANSuTTRS 13R HRQ RB REPLACE APPROX 32 TRANSMITTERS i

MEET NRC BULLETIN 90-01 l

15 OF THE 32 UNITS WILL BE DONE CYCLE 32 22 408116 ACCESS CONTROL UPGRADE-CTL RM/ QB 14 NRR CR CSR PROCUREMENT & INSTALLATION OF KEY CARD

{

READER UNITS W/ ALARM FOR CONTROL ROOM AND CABLE SPREAD ROOM E BX BUILDG 23 328280 RCS STRESS IMPROVEMENT 14R NRR DW RB23 PERFORM STRESS IMPROVEMENT ON SELECTED STAINLESS STEFL PIPING WELDS IN QCS SYS, T

i 24 328284 CLOSURE HEAD WELDS REPLACEMENT 14R NRR RB 119 119 REPLACE CLOSURE HEAD VENT / COOLING PIPE WELDS (G.L.

88-01).

I 25 328307 RCS AUG - IGSCC INSPECTION - 14R 14R NRR DW RB75 RBSS INSPECT PIPING WELDS PER NUEEG 0313 REV 2.

1 26 402AGA OC RX OVERFILL PROTECTION SYSTEM 144 NCR I

CR MODIFICATIONS TO FW REGULATING VALVES AND FW PUMP B TRIP CIRCUITRY.

HRC GEN. LETTER 89-19 I

4 27 402808 CONVERT COMPdTER RM TO GSSI/EMER DIR OFF 14R NRR CPR CONVERT COMPUTER ROOM INTO GSS OFFICE.

REQUIRES SECURITY PROOrING l

OY ST ER CREEK PROJECT L IST ING

([pgND NRC INTEGRA TED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

  • B*

PROJECTS STATUS AS OF 13JUN91 SORT BY CATEGORY / CYCLE /BA CTCLE/

CLASSIFICATION OBS BA DESCRIPTION YEARS NUMBER NRR 14R 28 402888 RPV CAPSULE #2 119' INSTALL CAPSULE #2 IN *R*

VESSEL.

NUREG 0822.

NRR 29 402894 0.C.

DELETION OF CONTAINMENT SPRAY AUTO 1AR 480V CR REPLACE C.S.

MODE SWITCH W/TWO KEY-LOCrED SWITCHES, LOCAL WIRING CHANGES.

PREVENT SYSTEM AUTO _ START.

NRP 144 30 402900 ISO CONDENSER PIPING MODS RB PERFORM STRESS IuDROVEMENT OF THE ISO CONDENSER NEW NG PIPING INSTALLED IN 13R.

NRR 14R 31 402910 C R RECOEDERS I

CR REuOVE E REPLACE APPROX. 15 DEFICIENT /

OBSOLETE RECORDERS - REDUCE ODERATOR ERROR. NUREG 0737 SUPA 1.

NRR 14R 32 402936 cpu /DW ISO VALVE uGD TO PRECLUDE AUTO RE CR INSTALLATION OF POSITION SWITCHES AND WIRING CHANGES FOR VALVES V-38_9,10.16 &

17. NUREG-0737 ITEu II.E.4.2 NRR 33 402946 CONTAINWENT ISOLATION VALVE REPLACEMENT IAR RB DW REPLACE BALL VALVES AND INSTALL SPECTACLE FLANGE ASSEMBLIES.

1 NRR 14R 34 402968 C C HARDENED VENT RB TR INSTALL 8" PIPING VENT SYSTEu FROM CONTAINMENT TO THE MAIN STACK FAN DISCHARGE DUCTS. NRC GL 89_16 NRR 35 32SADA FW/CRD NOZZLE INSPECTION - ISR ISR DW NDE 4 FW & CRD RETURN NCZZLES.(EXTERNAL UT INSPECTION). NUREG 0619 REQ *TS.

\\

J u

u OY STER CREEK P ROJECT LISTING LEGEND NRC INTEGRATED SCNEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

  • B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 13JUN91 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEAQS 36 328AFR RCS AUG. IGSCC INSPECTION _15R 15R NRR DW RB75 RB95 INSPECT PIPING WELDS (69)

G.L.

88-01 AND NUREG 031? REV.2 37 328030 CNTL CM HUMAN FACTORS DESGN REVIEW ISR NRR CR REPAINT, REFURBISH & RELABEL CR PANELS 14 THRU IOR,6*R.llMR.12R.12WR.14R.14rR, 16R AND 11F.9XR&llR.NUREG 0737 SUP 1.

38 402AGO REG GUIDE 1.97 QECORDERS ISR NRR CR REPLACE / INSTALL RX WATER LEVEL FU L IONE RECORDERS TO MEET REG. GUIDE 1.91 REC *TS 39 402AGP REG GUIDE 1.97 POWER SUPPLY ISR NDR CR RB PROVIDE NEW 120V POWER SUPPLY FEED TO REG GUIDE 1.97 INSTRUMENTATION.

LOSS OF OFF-SITE POWER CONCERNS.

40 402011 OC REPLICA SIuutATOR 87_92 NRR DESIGN. FABRICATE. INSTALL A SIMULATOR DUPLICATING THE OC CONTROL Ru FUNCTIONS FOR TRAINING PURPOS"S.

41 402959 O.

C.

PROBABILISTIC RISK ASSESSMENT-IPE 87-92 NER UPDATE EXISTING OC PRA. PERFORM AN INDIVIDUAL PLANT EVALUATION. NRC G.

L.

88-20. COMPLETE BY 9 1-92 l

42 328205 SOUG SUPPORT & PARTICIPATION - BWROG 87-93 NRR 1

PARTICIPATION IN SEISMIC QUALIFICATION UTILITY GROUP FOR EQUIP SEISMIC QUA-LIFICATION. UNRESOLVED SAFETY ISSUE.

43 328226 SOUG PROGRAu IMPLEuENTATION 87-93 NRR ESTABLISH SEISMIC QUALIFICATION FOR OYSTER CREEK. SCOPE INCLUDES NALKDOWNS IN OUTAGE 14R AND EVALUATIONS.

OY ST ED CREEK P ROJECT LIST ING LEGEND NRC INTEGR ATED SCHEDULE


_~. -.-..-.-_--- -__.-_---- -- -.__-------

NEw cROJECTS.

=

BA NUMBER CHANGE CATEGCRY

  • B' PROJECTS STATUS AS Or 13JUN91 SORT BY CATEGORY / CYCLE /BA CYCLE /

CLASSIFICATION DESCRIPTION YEARS 085 BA NUuBER NRR NUMARC COMu'L GRDE DEDICATION & PRCOUR 90-91 44 328304 DEVELOP A COMMERCIAL GRADE DEDICATION PROGRAu IN RESPONSE TO NRC G L 89-02 NOR 90-92 45 328312 kOV PROGRAM DESIGN BASIS REV1EW, STRESS ANALYSIS AND TESTING OF APPROX 60 uov's NRC G L 89-10

U u)

J

~

OY STER CREEK PROJECT LISTING LEGEND N RC INTEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

  • C*

PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 13JUN91 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS i

46 323594 LIFE OF SYSTEM MAINT PLAN 12-14 MRC ALL PERFORM REVIEWS OF O.C.

PLANT SYSTEMS.

IMPLEMENT MODS / REPAIRS RESULTING FROu SYSTEM REVIEWS.

47 323AGG SPENT FUEL POOL CLEANUP 13 uRC 119 i

REMOVE AND DISPOSE OF IRRADIATED HARDWARE AND SILT 48 323637 CHECK VALVE MONITORING /INSP. PROGRAM 13 REL RB TB OPEN AND INSPECT CHECK VALVES THat EXHIBIT OPERATIONAL PROBLEuS.

INPO-SOER 86-03 49 402823 GROUNDING & LIGHTNING PROTECTION 13 ISU YARD RB TB RB INSTALL LIGHTNG DROT FCE ES & TB.

I GROUNDING FOR NORTH GUARD MOUSE. MAIN GUARD HOUSE. LARGE STORAGE TANKS.

50 402898 REPL UPPER TB & OLD MACHINE S90P ROOr 13 MRC YARD REPLACE THE UPPER TURBIT.2 BUILDING ROOF. AND 'HE OLD MACHINE SHOP ROOF.

51 402950 DRYWELL CORROSION CONTROL 13 uRC DW RB REMOVE THE SHEETMETAL FROM TORUS VENTS AND REMOVE SAND FROM THE SAND BED REGION 52' 408AER SPENT FUEL POOL CLEANUP 13 MRC 119 REMOVE AND DISPOSE OF IRRADIATED HARDWARE IN THE SFP. IE CRB'S.LPRU*S FUEL CHANNELS ETC.

S3 322024 DRYWELL SCAFFOLDING & INSULATION 13R GWC DW INSTALL SCAFFOLD IN DW TO SUPPORT ALL OEM WORK.REMV E REINSTALL DW INSULATION REMV SCAFFOLD. REM /REPL DW AIRLOCK s

OY STER CREEK PROJECT LISTING

=-

LEGEND NRC INTEGRATED SCHEDULE I

NEW PROJECTS.

l BA NUMBER CHANGE CATEGORY

'C' PROJECTS i

t SORT BY CATEGORY / CYCLE /BA STATUS AS OF 13JUNS1

(

---..------------.-.--..--.---______._--.---.__.-...----..----------....------------ ---_---------------------------.------------- i OBS BA DESCRIPTION CYCLE /

CLASSIFICATIOtt

{

i NUMBER YEARS

[

I 54 323457 CHECK VALVE MONITOR /INSP. PROGRAM 13R OR TB DW RB OPEN AND INSPECT CHECK VALVES THAT EXHIBIT OPERATIONAL PROBLEMS.

INPO-SOER 86-03 55 323476 DIESEL M4INTENANCE IMPROVEMENTS 13R ISM DGB j

REPAIR / REPLACE CORRODED STEEL.

LEAKING FUEL OIL LINE. ADD TERM. PTS.

REPLACE DG-2 POWER PACKS.RpR CONCRETE i.

56 323577 RECIRC VALVE MAINTENANCE 13R URC i

DW i

REPLACE PACKING AND INSPECT STEMS ON 5 l

SUCT. & DISCH. VALVES REPACK 4 BYPASS T l

l VALVES. REPLACE STEM ON "C" SUCTION 57 323580 LP TURBINE INSPECTION

("B" 13R MRC TB COMPLETE INTERNAL INSPECTION OF THE "B" LOW PRESS TURBINE. REMOVE ROTOR.

[

SANDBLAST,UT INSP & REINSTALL ROTOR.

58 323592 CONTAINMENT ISO VLV MAINT 13R NRR RB INSPECT & REPAIR AS NECESSARY CONTAINMT l

ISOLATION VALVES IDENTIFIED BY LLRT* S.

l (ADPROX. 15 VALVES)

[

59 323593 CRD HCU MODULE REBUILD 13R MRC RB l

INSP/ REBUILD (2OICRO MODULES. PERFORu CORRECTIVE MAINTENANCE ON 20 MODULES AS DETERMINED BY DIAGNASTIC TESTING.

60 323605 VALVE MAINT. AND OVERHAUL 13R uRC DW RB TB REPACK. REPAIR,AND REPLACE SELECTED i

VALVES WHICH HAVE DEFICIENCIES NOTED

~

ON WORK REQUESTS.

l 61 323612 ASBESTOS ABATEMENT PROGRAM 13R 13R OCR CB RB REMOVAL / REPLACEMENT OF ASBESTOS LAGGING MATERIAL IN THE CONDENSER BAY.

6

OY STER CREEK PROJECT LIST ING

=.________

_______________ _____..__...___________.=

LEGEND NRC INTEGQATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGCRY

'C' PROJECTS STATUS AS OF 13JUN91 SORT BY CATEGORY / CYCLE /BA CYCLEI CLASSIFICATION 085 BA DESCRIPTION YEARS NUMBER NRR 13R 62 326201 OUTAGE ISI.13R DW RB TB INSPECT HANGERS. PIPING WELDS &

CouPONENTS TO SATISFY CECTION XI REQUIREMENTS.CLASSI E3 SYSTEM HYDROS NRR 13R 63 328203 RX INTERNAL INSPECTION 119' VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS & SURFACES AS REQ *D BY ASME CODES.

MRC 13R 64 328230 RCS PIPING REPAID CONTINGENCY DW RB CONTINGENCY FOR IGSCC FINDINGS.

RAD 13R 65 328265 CHEM CLEAN FLUID SYSTEu RB03 DW RBSI PERFORu CHEMICAL DECON OF THE RECIRC AND CL E ANUP SYSTEMC TO LEDUCE RAD.

IATION LEVELS.

ALL ISR 66 402BBB OTHER OUTAGE RELATED ACTIVITIES ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS. REPAIRS. SURVEILLANCES, MINOR MODIFICATIONS, MOD SUPPORT. ETC.

ISM 67 402860 LP TURBINE BLADE REPLACEMENT.LP B 13R TB REPLACEMENT OF LP 157H STAGE BLADES ON B"

LOW PRESSURE TURBINE.

REL 13R CABLE / CONDUIT REPAIR-CIRC WATER Puup PIT 68 402869 INT REPLACE ELECTRICAL CONDUITS, CABLE AND CONDUIT SUPPORTS AT THE INTAKE STRUCTURE REL 13R 69 402901 FEEDWATER SYSTEu IuPROVEMENTS TB RB INSTALL (2) MAIN BLOCK VALVES AND REPLACE PNEUMATIC LOCK-UP RELAYS.

PRE. OUTAGE WORK: INSTALL CONDUITS.

+

r OY STER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE l

NEW PROJECTS.

BA NUMBER CHANGE I

CATEGORY

'C' PROJECTS i

i SORT BY CATEGORY / CYCLE /BA STATUS AS OF 13JUN91 OSS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 70 402915 REDUCE NUuBER US SAFETY VALVES 13R CAD DW PERMANENT REMOVAL OF 47) MSSV*S BASED ON t

STUDY PERFORMNED. INSTALL BLIND FLANGES.

RELOCATE ACC.MONITORSSIMPROVE ELECTRONIC f

71 402939 DRYWELL EXPOSURE REDUCTION MODS.

13R RAD i

DW INSTALL SHIELDING ON VARIOUS COUPONENTS IN THE DRY WELL 72 40?939 DRYWELL EXPOSURE REDUCTION MODS.

13R RAD DW RB i

INSTALL NEW DW CHILLER SUPPLY LINE AND INSTALL A CHILLER BY-PASS TO ALLOW P.M.

5 73 402939 DRYWELL EXPOSURE REDUCTION uODS.

13R RAD DW RB INSTALL ELECTRICAL SERVICES I

IN THE DRYWELL.

74 402939 DW EXPOSURE REDUCTION MODS.

33R RAD DW f

REPLACE 3 DW uECHANICAL SNUBBERS WITH STRUTS 75 402945 NEW FW FLOW ELEuENT 13R ISu TB INSTALL A NEW FW VENTURI ACCURACY CONCERNS, CORE THERMAL POWED f

LEVEL.

l 76 402952 CHEMICAL DECON SUPPORT SYSTEUS-132 13R RAD L

DW DESIGN PROCURE AND INSTALL support SYSTEMS REO*D TO IMPLEMENT CHEM DECON OF THE RECIRC LOOPS, ANNULUS, & RWCU SYS 77 408844 CONDENSATE STORAGE TANK BOTTOM REPLACE 13R MRC YARD ACCESS THE TANK TO DETERMINE DAMAGE, DEVELOP PLAN TO CONTINUE OUTAGE, REPLACE TANK BOTTOM AND PORTIONS OF SAND BED i

i

g

%ws OY STER CREEK PROJECT LISTIN G LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

'C' PROJECTS i

SORT BY CATEGORY / CYCLE /BA STATUS AS OF 13JUN91 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS

___........._________................________..__...._____________-- --- ___..-_...__...........__ __...=-----------...---. --

78 323637 CHECK VALVE MONITORING /INSP. PROGRAU 13U REL RB TB OPEN AND INSPECT CHECK VALVES THAT EXHIBIT ODERATIONAL PROBLEus.

INPD-SOER 86-03 79 402950 DRYWELL CORROGION CONTROL 13U uRC DW RB REMOVE SHEETWETAL AROUND TORUS AND REMOVE SAND FROM THE SANDBED REGION.

80 408836 VALVE REPLACEMENT ISU REL RB TB REPLACE SELECTED VALVES IDENTIFIED AS HAVING MAJOR DEFICIENCIES 81 322024 DRYWELL SCAFFOLDING S INSULATION 14A GWC DW i

INSTALL SCAFFOLD IN DW TO SUPPORT ALL ACTIVITIES. REMV & REINSTALL DW INSULA-i TION. REMV SCAFFOLD.

82 323ACJ HP TURBINE INSPECTION _I4Q 14R URC TB COMPLETE INTERNAL INSPECT OF THE HP TURBINE. REUV ROTOR FROM CASING.

SANDBLAST UT INSP & REINSTALL ROTOR.

83 323ACV CONT ISOLATION VALVE MAINT.14R 14R NRR RB REFURBISH CONT ISO VALVES IDENTIFIED SY LLRT'S. APPROX IS VALVES 84 323ADC ASBESTOS ABATEMENT _14Q I4A CRR TB RB REMOVAL / REPLACEMENT OF ASBESTOS LAGGING MATERIALS. OSNA CFR 1910.1001 85 323AGF REFUEL FLOOR-RX DISASSEMBLY /REASSEuBLY I4R WRC 1

119 TASKS ASSOCIATED WITH RX DISASSEMBLY AND REASSEMBLY, AND SUPPORTING ACTIVITIES

s,)

OY ST ER CREEK P ROJECT LISTING LEGEND NRC IN TEGRATED SCHEDULE NEW PROJECTS.

i BA NUMBER CHANGE CATEGORY

  • C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 13JUN91 CBS

'BA DESCRIPTION CYCLE /

CLASSIFICATION NUMSER YEARS 86 323LPA LP TURDINE INSPECTION (A) 14R uRC A

TB COMPLETE INTERNAL INSPECTION OF THE i

"A" LP TURBINE.

87 323624 VALVE MAINTENANCE E OVERHAUL 14R MRC TB DW RB CORRECTIVE & PREDICTIVE MAINTENANCE OF SELECTED VALVES.

88 323629 CRD HCU MODULE REBUILB-14R 142 uRC i

RB23 REBUILD 35 CRO HYDR AULIC CONTROL UNITS 4

i 89 323637 CHECK VALVE MONITORING /INSP. PROGRAM 1AR REL RB TB l

OPEN AND INSPECT CHECK VALVES THAT EXHIBIT OPERATIONAL PROBLEMS.

INPO-SOER 86-03 90 32691E OUTAGE ISI-14R 14R NRR DW RB TB r

INSPECT HANGERS. PIPING WELDS S COMPONENTS TO SATISFY SECTION 3

x1 REQUIREMENTS.

[

91 328308 RCS PIPING REPAIR CONTINGENCY 144 uRC DW CONTINGENCY FOR IGSCC FINDINGS.

ASSUMES ONE 6" OVERLAY IN RWCU AND c

INSP OF 9 ADD'L WELDS.

92 328310 RX INTERNAL INSPECTION 14R NOR 119' DW VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY

~,

ASME CODES.

93 402AEV RECIRC FLOW SCRAM ELECTRONICS REPLACEM*T 14R ORR e

RB CR REPLACE EXISTING ELECTRONICS WITH DIGITAL ELECTRONIC EDUIPMENT.

. ~.

C O

OY STER CREEK PROJECT LISTING LEGEND NRC INTEGRA TED SCHEDULE l

NEW PROJECTS.

a-BA NUMBER CHANGE CATEGORY

  • C*

PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 13JUN91 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEAPS

__________.....__________..._________________________________________________.- - - - - - =.... _ _ - -


=__---. =_=

94 402AFJ TBCCW HX REPLACEMENT 14R REL TB REPLACEMENT OF DNE TBCCW HX 95 402CCC OTHER OUTAGE RELATED ACTIVITIES 14R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS i

INSPECTIONS. REPAIRS. SURVEILLANCES.

' MINOR UODIFICATIONS, MOD SUPPORT, ETC.

i i-96 402736 DUAL VALVE INDICATION REMOVAL. PH 1 14R ISu CR RB l

REPLACE DOUBLE VALVE INDICATION l

LIGHTS IN C.R.

PNLS 1F/2F, 11F. INSTAL NEW CABLING FROM R.B.

TO C.R.

97 402821 RX RECIRC PUMP & MOTOR VIBRATION MONITRS 14R MRC t

DW RB CR INSTALL VIBRATION MONITORING TRANSDUCERS AND SU' -ORT EQUIP. FOR 4 RECIRC POMPS 7 TRAN5./ PUMP AND S FOR 1 Puup.

99 402901 FEEDWATER SYSTEu IMPROVEMENTS 14R REL CR NCSR h

REPLACE' ANALOG CONTROL SYSTEM WITH I

DIGITAL.

l 99 402925 GENERATOR PRCTECTION UPGRADE 14R ISu i

TB l

ADD RELAYS AND ALARMS TO PROTECT THE a'

GEN AS PER PJM RECOMMENDATIONS.

100 402929 DIGITAL RECIRF-FLOW CONTROL 14R 14R REL

[

CR i

REPLACE GEMAC HARDWARE WITH DIGITAL SYSTEM.

I 101 402939 DRYWELL EXPOSURE REDUCTION MODS.

14R RAD DW

[

4 INSTALL IMPROVED EQUIPMENT IN 1 4 SUMP i

l i

OY STER CD EEK PROJECT LIST I "4

G LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

  • C' PROJECTS STATUS AS OF 13JUN91 SORT BY CATEGORf/ CYCLE /BA CLASSIFICATION CYCLE /

DESCRIPTION YEARS CBS BA

.== =----

_.....---------_ -----.......---------------.......------.-- ---.--------__-=----------.....- -.......-- -------...._--..-

NUMBER RAD 14R DRYWELL EXPOSURE REDUCTION UODS.

102 402939 DW INSTALL DRYWELL SERVICES FOR BREATHING /

SERVICE AIR AND WATER.

RAD 14R 103 402939 DAY WELL EXPOSURE REDUCTION MODS.

DW INSTALL IUPROVED RICGING FOR USSV*S AND EMRV'S RAD 14R 104 402939 DRYWELL EXPOSURE REDUCTION MODS DW INSTALL' DECK GRATING AT THE 46' ELEV OF THE ORVWELL.

REL 149 105 402957 OC IA83 ANALOG CONVERSION RB CR REPLACE 5 IA83 PRESS SWITCHES WITH ANALOG SYSTEM.

uRC 34R OC EDG OUTPUT CONTROL MODIFICATION 106 +02961 TB REPLACE THE EXISTING GOVERNOR WITH A WOODWARD AUTOMATIC GEN LOADING CONTROL.

REPLACE MISC. ELECTRICAL COMPONENTS.

ISu 14R 107 402963 LP TURBINE BLADE REPLACEMENT TB REPLACEMENT OF LP ISTH STAGE BLADES ON "

A" LOW PRESSURE TURBINE URC 14R CONDENSER VALVE REPLACEMENT 1

108 408825 i

TB REPLACE 2 CONDENSER BACKWASH VALVES REL 14R 109 408836 VALVE REPLACEMENT RB TB REPLACE SELECTED VALVES IDENTIFIED AS HAVING MAJOR DEFICIENCIES.

i G

\\/

q OY STED CREEK PQOJECT LISTIN G LEGEND e

NRC INTEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE i

CATEGCRY

  • C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 1*JUN91.

OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS L

_.--_-..--....----....--...._..-__---_....-.........---....._- --=_------_---- =----

1 i

110 328ADL RX V INTERNAL INSPECTION-ISR ISR Nkd i

119 VISUAL INSPECTION OF SELECTED INTERNAL COUPONENTS AND SURFACES AS REQ'D BY ASME CODES.

[

f 111 328AFQ RCS PIPING REPAIR CONTINGENCY ISR REL l

DW RB i

I CONTINGENCY FOR IGSCC FINDINGS ASSuuE TWO CVERLAYStONE 10- AND ONE 6")

i AND ADD'L INSP. SAMPLE OF 19 WELDS 112 402ABC S20G MODS 15R NRR IMPLEMENT WODS RESULTING FRCU SQUG j

WALKDOWN IN 14R. SCOPE NOT YET DEFINED.

t i

113 402AFJ TBCCW HX REPLACEMENT ISR REL 2

i TB l

j REPLACE ONE TBCCW HX t

114 402636 WIDE RANGE NEUTRON MONITORING 15R NRR Dw13 INSTALL AN 8 CHANNEL WRNU SYSTEM

[

TO REPLACE EXISTING SRU*S/IRU*S.

[

115 402819 RECIRC Puup uOTOR RTD CIRCUITS UPGRD ISR MRC DW RB23 REPLACE RTD CABLES ON ALL 5 RECIRC PUMP MOTORS FROM MOTOR JUNCTION BOX TO PENETRATION OUTSIDE DW.

i 116 402948 LP TURBINE (C) LAST STAGE BLADE INSTALL ISR REL TB REPLACE LAST STAGE BLADES IN l

LP TURBINE "C".

BLACE FAILURE CONCERNS.

i i

117 409057 SIMULATOR FACILITY 87-91 NRR CONSTRUCT A TMI-TYPE S1 JULATOR BLDG AT O.C. FOR SIMULATOR AND BPT.

s h

OY STER.

CREEK PROJEC7 LIST ING LFGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.

[

BA NUMBER CHANGE CATEGORY

  • C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS Of 13JUN91 OBS BA pr.SCRIPTION CYCLE /

CLASSIFICATION i

NUMBER YEARS 118 402880 0.C.

FUEL POOL GORE OFF LOAD (STUDY) 87-93 CRR l

- RB ESTABLISH ADDITIONAL SPENT FUEL STORAGE CAPACITY FOR FULL CORE OrF-LOAD BEYOND 1993 AT L.C.

119 328148 0.C.

PLANT LIFE ASSURANCE & EXTENSION 87-94 REL 1

DE7ELOP 3-PHASE PLEX PLAN. PHASE I TO DETERMINE FEASIBILITY AND COST /

ANALYSIS OF PLEX.

t, t

120 328305 DRYWEl.L SERVICEABILITY EXTENSION ANALYSI' 90-91 NRR PERFORM CONTAINMENT PRESSURE ANALYSES AND MATERIAL CERTS REVIEW TO JUSTIFY INCREASED CORROSION MARGIN l

121 402943 CONFIGURATION MANAGEMENT-DBD 1991 91 ISM 3

DEVELOPMENT OF OC SYSTEM DESIC:4 BASES.

PERFORM SSF'S AND ZMPSOVE DRAWING LFGIBILITY 121 402AFV CONFIGUR "XON MANAGEMENT-DBD 1992 92 ISM DEVELGPMENT OF OC SYSTEM DESIGN BASES.

PERFORM SSF'S AND IMPROV4 DRAWING LEGIBILITY.

123 403920 REPLICA SIMULATOR MODS 42 NRR UP6RADE THE SIMULATOR TO MATCH PLANT l

MODS AS APPLICAELE.

124 402AFW CONFIGURATION MANAGEMENT-D8D 1993 93 ISU DEVELOPMENT OF OC SYSTEM DESIGN BASES.

PERFORM SSF*S AND IMPROVE DRAWING 1

LEGIBILITY I?S 40993E REPLICA SIMULATOR MODS 93 NRR i.

UPGRADE THE SIMULATOR TO MATCH PLANT MODS AS APPLICABLE

b OY S TER CREEK PROJEC1 L2ST ING e

LEGEND NRC INTFGRATED SCH EDULE NEW PROJECTS.

BA NuuBER CHANGE CATEGORY

  • C' PROJECTS S1 VT:JS *S OF 13JUN91 BY CATEGORf/ CYCLE /6A SORT CLASSIFICA1 JN CYCLE /

OBS BA DESCRIPTION YEARS NUMEER ISM 94 126 402AFX CONFIGURATION MANAGEMENT _DBD 1994 DEVELOPMENT OF OC SYSTEM DESIGN BASES PERFORu SST

  • S AND IMPROVE DR AWING LEGIBILITY s1
h. i

?

Q-4 ATTACHMENT B OYSTER CREEK NUCLEAR GENERATING STATION NRC INTEGRATED SCHEDULE SEMIANNUAL UPDATE CATEGORY "A"

PROJECTS ADDITIONS:

BA 402011 Certify Simulator of OC.-

Control Room.

COMPLETIONS:

None DELETIONS:

None SCHEDULE CHANGES:

None

[.:.-

L l>

- C120327 l

_ a__

4 a

j Attachment B (continued)

CATEGORY "B"

PROJECIE ADDITIONS:

As denoted by

  • next to the project title in Attachment A.

DELETIONS:

None SCHEDULE CHANGES: 315302 - The SEP Topic III-1 evaluation of the design of specific components was completed in June, 1987.

The update to the UFSAR was deferred to update 6 to be submitted in December, 1991.

The original commitment for updates to the UFSAR. ss two years following program completion, and although the program is still not wholly complete GPUN has cargeted the next annual update for this item.

328284 - Corrosion Resistant Clad (CRC) will not be applied to the three reactor head nozzles due to benefit / cost considerations.

402011 - OC Replica Simulator has been recategorized from Category C to Category B.

In addition, the schedule is extended into 1992 due to simulator vender delays.

402859 - The Outage 12U portion of this project has been integrated with the 13R Outage Scope.

402888 - RPV Capsule #2 has been deferred from 13R to 14R due to interferences with the existing vibration instrumentation blocks.

402946 - One spectacle flange was ins',alled in the 13R outage to faciliate 10 CFR 50 Appendix J, Type C testing.

Further modifications are planned for the 14R outage (Ret CPUN Letter to the NPC dated 9-24-90).

OTHER CHANGES:

The following Budget Activity (BA) numbers have been changed.

bas which have had their numbers changed are indicated by ** in Attachment A.

OBS #

Title Previous B/A New B/A 34 OC Hardened Vent 402AFA 402968 C120327

i i

l e

Attachment B (continued) l CATEGORY "C"

PPOJECTS ADDITIONS:

As denoted by a next to the project title in Attachment A.

I COMPLETIONS:

RfA IIILE 323457 Check Valve Monitoring / Inspection Program (Cfele 12 and 12U) 402823 Grounding & Lightning Protection (Cycle 12) 408790 Plant Painting Program (Cycle 12) 323457 Check Valve Monitoring / Inspection Program (Cycle 12U) 328259 Configuration Management - Drawing Program Phase 1 i

328278 Configuration Management - SSFI 1990 402934 Configuration Management - Design Bases -

Post 1990 CANCELLATIONS:

402ADI Recirculation Pump Speed Control (New B/A Number 402967)

SCHEDULE CHANGES: 408836 - Valve Replacement will be a phased project to include work in 13U and 14R.

OTHER CHANGES:

Budoet Activity fB/A) number chances, j

l.

OBS #

Title Previous B/A Epw B/A 79 Valve Replacement 408AEC 408836 88 Check Valve Monit./

323AGB 323637 Inspec. Program l~

i l.

l l'

1 C120327 l

..